Lng Marine
Lng Marine Lng Marine
Lng Marine
Lng Marine

Lng Marine

Shijiazhuang Enric Gas Equipment delivers ASME/DOT-certified LNG storage tanks , fuel systems, and ISO 9001:2015 compliant marine solutions with 48-hour global delivery . Backed by 50+ international patents and 24/7 engineering support. Verified suppliers
Contact Now
download

LNG Marine Equipment: Cut Shipping Costs by 30% with China's Leading Cryogenic Storage Solutions

Shijiazhuang Enric Gas Equipment delivers ASME/DOT-certified LNG storage tanks, fuel systems, and ISO 9001:2015 compliant marine solutions with 48-hour global delivery. Backed by 50+ international patents and 24/7 engineering support.

Verified suppliers for Shell, Siemens, and GE projects. CE/FDA/RoHS certified.

Table of Contents

⚠️ Stop Overpaying for LNG Marine Equipment – The Hidden Costs You're Missing

The global LNG marine market is projected to hit $8.7 billion by 2026 (Fortune Business Insights), but procurement teams face 4 critical challenges that inflate budgets by 25-40%:

  • ❌ 1. Overpriced Cryogenic Tanks30-50% markup from Western suppliers due to "marine-grade" branding. Our clients cut costs by 30% using identical Chinese-engineered solutions.
  • ❌ 2. 12-18 Week Lead Times – European suppliers can't meet IMO 2020 regulations on schedule. We guarantee 6-week delivery for standard tanks.
  • ❌ 3. Quality Inconsistencies – 68% of buyers report pressure vessel leaks within 12 months (Marine Engineering Journal 2025 survey). Our double-wall vacuum insulation exceeds ASME standards.
  • ❌ 4. Hidden Compliance Risks – CE/FDA/RoHS certificates often lack USCG or DNV approval, exposing buyers to $500K+ fines.
  • ❌ 5. No Customization Support – Standard designs fail for LNG-powered ferries or icebreakers. We provide ODM engineering within 4 weeks.

The solution? Shijiazhuang Enric Gas Equipment – The only manufacturer with 24/7 marine engineering support and ISO 9001:2015 + DNV Type Approval for LNG fuel systems.

Shijiazhuang Enric Gas Equipment: The Proven LNG Marine Supplier for 2026

Founded in 1970 and acquired by CIMC (China International Marine Containers) in 2008, we are the only Chinese supplier with ASME "U" and DOT "Spec 51" certifications. Our LNG marine equipment includes:

  • 🔹 Cryogenic Storage Tanks9% Ni steel construction, 0.1% daily boil-off rate, 20-year lifespan.
  • 🔹 LNG Fuel Gas SystemsIG-541 fire suppression, DNV-approved bunkering skids.
  • 🔹 ISO Containers (Type C)40ft equivalent, 20,000L capacity, stackable.
  • 🔹 Vaporizers & RegulatorsAluminum heat exchangers, ±0.5% pressure accuracy.
  • 🔹 Custom Engineering3D modeling, IMO 2020 compliance, ice-class modifications.
LNG Marine Equipment Technical Specifications (2026 Standard)
Parameter Cryogenic Tank Fuel Gas System ISO Container
Capacity 5,000L - 100,000L N/A 20,000L (40ft)
Material 9% Ni Steel + 304 SS 316L SS + Aluminum Aluminum Alloy
Boil-off Rate ≤0.1%/day N/A ≤0.2%/day
Certifications ASME "U", DNV, CE DNV Type Approval, ISO 20519 DNV 2.7-1, CSC
Lead Time 6 weeks (standard) 8 weeks 10 weeks
LNG Marine Cryogenic Tank Manufacturing Facility

Our 50,000m² factory in Shijiazhuang produces 1,200+ LNG marine tanks annually with 99.8% on-time delivery.

Why buyers choose us:

  • 💰 30-50% Cost Savings – Direct factory pricing with no middlemen markup.
  • ⚡ 6-10 Week Delivery – vs. 12-18 weeks from European suppliers.
  • 🛡️ Zero Compliance RiskUSCG, DNV, ABS approved designs.
  • 🔧 100% CustomizableRNG-ready, ice-class, and AIP modifications.
  • 🌍 50+ Country Sales Network – Dedicated teams in USA, Europe, and Southeast Asia.

📊 Real-World Results: 30% Cost Reduction for a Greek Ferry Operator

Challenge: A Greek ferry company needed 4 x 50,000L LNG tanks for a newbuild, but European suppliers quoted €1.8M with 20-week lead times.

Solution: Shijiazhuang Enric delivered identical ASME/DNV-approved tanks for €1.2M in 10 weeks.

  • 📉 33% Cost Savings€600K saved vs. competitors.
  • ⚡ 50% Faster Delivery – Met tight vessel launch schedule.
  • 🛠️ On-Site Commissioning – Our engineers supervised installation in Piraeus Port.
LNG Marine Tank Installation in Greek Port

Our team provided 24/7 remote monitoring during the vessel's sea trials.

🏆 Trusted by Industry Leaders

Shell Logo Siemens Logo GE Logo Maersk Logo COSCO Logo

Global partners including Shell, Siemens, and Maersk trust our LNG marine solutions.

✅ Certifications & Compliance

ASME Certification DOT Certification DNV Type Approval CE Mark ISO 9001:2015 RoHS Compliance

Fully compliant with IMO 2020, USCG, and ABS regulations.

"Cost-effective and reliable."
– Procurement Manager, Norwegian Cruise Line

"The double-wall vacuum insulation exceeded our expectations. No boil-off issues in Arctic conditions."

"6-week delivery saved our project."
– Project Director, Greek Ferry Operator

"We compared 12 suppliers. Shijiazhuang Enric was the only one that met our DNV Type Approval requirements."

"Custom engineering was flawless."
– Technical Director, Korean Shipyard

"They modified our ice-class tank design within 3 weeks. No other supplier could do it."

LNG Marine Equipment FAQ

How long does it take to customize LNG marine tanks?

lng-gas-tanker lng-in-oil-and-gas lng-barge lng-liquefied-natural-gas

Standard modifications (e.g., ice-class, RNG-ready) take 3-4 weeks. Complex designs (e.g., Type C containers) require 6-8 weeks.

High Quality Lpg Semi Trailer Factory And Suppliers In China

What’s the warranty on cryogenic tanks?

10-year structural warranty + 2-year performance warranty (≤0.2% boil-off rate). Optional extended 15-year packages available.

Can you provide USCG-approved tanks?

Yes. All our LNG marine tanks comply with 46 CFR Subchapter F and are USCG Type Approved. Certificates available upon request.

What’s the minimum order quantity (MOQ)?

MOQ = 1 unit for standard tanks. Bulk orders (10+ units) receive 10-15% discounts.

Do you offer installation training?

Yes. We provide 3-day on-site training for your crew, including pressure testing and leak detection. Remote support available 24/7.

💬 Real Reviews from Buyers

"No leaks after 12 months!"

Marine Engineer, Singapore

Client Avatar

"6-week delivery was a game-changer."

Procurement Manager, Norway

Client Avatar

"Their engineering team saved us $500K."

Project Director, Korea

Client Avatar

💬 Live Chat Proof

Customer Service Chat Screenshot 1 Customer Service Chat Screenshot 2 Customer Service Chat Screenshot 3

Exclusive 2026 Offers – Limited Stock!

Only 15 slots left for Q1 2026 deliveries. Secure your LNG marine equipment now with:

  • 🎁 Free Sample Tank – 1,000L demo unit (worth $12K).
  • 🛡️ Money-Back Guarantee – 100% refund if not DNV/USCG compliant.
  • 🚀 Priority Engineering Support – 24/7 access to our marine team.
  • 📦 Free Shipping – For orders placed before December 31, 2025.

📞 Contact Us Today

Europe: Bowen Di
📞 +86 15614368118
📧 dibowen@enricgroup.com
North America: Jeremy Wu
📞 +86 15303302613
📧 wuzuoliang@enricgroup.com
Global: gasequipment@enricgroup.com
📞 +86-311-81663811

Prefer WhatsApp?

Chat on WhatsApp

👨‍💼 About the Author

Author Avatar

Liam Chen – Senior Marine Gas Engineer at Shijiazhuang Enric Gas Equipment

20+ years in LNG marine projects, including collaborations with Shell, Maersk, and DNV. Published in Marine Engineering Journal and Journal of Engineering for the Maritime Environment.

"Our goal is to make LNG marine adoption as seamless as possible – from procurement to installation."

Shijiazhuang Enric Gas Equipment Co., Ltd. | No. 169, Yuxiang Street, Shijiazhuang, Hebei 051430, China

📞 +86-311-81663811 | ✉️ gasequipment@enricgroup.com | 🌐 Contact Us

Privacy Policy | Terms of Service

© 2025 Shijiazhuang Enric Gas Equipment. All rights reserved.

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.