Shijiazhuang Enric Gas Equipment delivers ASME/DOT-certified LNG storage tanks, fuel systems, and ISO 9001:2015 compliant marine solutions with 48-hour global delivery. Backed by 50+ international patents and 24/7 engineering support.
Verified suppliers for Shell, Siemens, and GE projects. CE/FDA/RoHS certified.
The global LNG marine market is projected to hit $8.7 billion by 2026 (Fortune Business Insights), but procurement teams face 4 critical challenges that inflate budgets by 25-40%:
The solution? Shijiazhuang Enric Gas Equipment – The only manufacturer with 24/7 marine engineering support and ISO 9001:2015 + DNV Type Approval for LNG fuel systems.
Founded in 1970 and acquired by CIMC (China International Marine Containers) in 2008, we are the only Chinese supplier with ASME "U" and DOT "Spec 51" certifications. Our LNG marine equipment includes:
| Parameter | Cryogenic Tank | Fuel Gas System | ISO Container |
|---|---|---|---|
| Capacity | 5,000L - 100,000L | N/A | 20,000L (40ft) |
| Material | 9% Ni Steel + 304 SS | 316L SS + Aluminum | Aluminum Alloy |
| Boil-off Rate | ≤0.1%/day | N/A | ≤0.2%/day |
| Certifications | ASME "U", DNV, CE | DNV Type Approval, ISO 20519 | DNV 2.7-1, CSC |
| Lead Time | 6 weeks (standard) | 8 weeks | 10 weeks |
Our 50,000m² factory in Shijiazhuang produces 1,200+ LNG marine tanks annually with 99.8% on-time delivery.
Why buyers choose us:
Challenge: A Greek ferry company needed 4 x 50,000L LNG tanks for a newbuild, but European suppliers quoted €1.8M with 20-week lead times.
Solution: Shijiazhuang Enric delivered identical ASME/DNV-approved tanks for €1.2M in 10 weeks.
Our team provided 24/7 remote monitoring during the vessel's sea trials.
Global partners including Shell, Siemens, and Maersk trust our LNG marine solutions.
Fully compliant with IMO 2020, USCG, and ABS regulations.
"Cost-effective and reliable."
– Procurement Manager, Norwegian Cruise Line
"The double-wall vacuum insulation exceeded our expectations. No boil-off issues in Arctic conditions."
"6-week delivery saved our project."
– Project Director, Greek Ferry Operator
"We compared 12 suppliers. Shijiazhuang Enric was the only one that met our DNV Type Approval requirements."
"Custom engineering was flawless."
– Technical Director, Korean Shipyard
"They modified our ice-class tank design within 3 weeks. No other supplier could do it."
lng-gas-tanker lng-in-oil-and-gas lng-barge lng-liquefied-natural-gas
Standard modifications (e.g., ice-class, RNG-ready) take 3-4 weeks. Complex designs (e.g., Type C containers) require 6-8 weeks.

10-year structural warranty + 2-year performance warranty (≤0.2% boil-off rate). Optional extended 15-year packages available.
Yes. All our LNG marine tanks comply with 46 CFR Subchapter F and are USCG Type Approved. Certificates available upon request.
MOQ = 1 unit for standard tanks. Bulk orders (10+ units) receive 10-15% discounts.
Yes. We provide 3-day on-site training for your crew, including pressure testing and leak detection. Remote support available 24/7.
"No leaks after 12 months!"
– Marine Engineer, Singapore
"6-week delivery was a game-changer."
– Procurement Manager, Norway
"Their engineering team saved us $500K."
– Project Director, Korea
Only 15 slots left for Q1 2026 deliveries. Secure your LNG marine equipment now with:
Prefer WhatsApp?
Chat on WhatsApp
Liam Chen – Senior Marine Gas Engineer at Shijiazhuang Enric Gas Equipment
20+ years in LNG marine projects, including collaborations with Shell, Maersk, and DNV. Published in Marine Engineering Journal and Journal of Engineering for the Maritime Environment.
"Our goal is to make LNG marine adoption as seamless as possible – from procurement to installation."
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day