Shijiazhuang Enric Gas Equipment Co., Ltd. (Enric) delivers factory-direct LNG storage tanks with unmatched technical precision and international certifications. As a high-tech enterprise under China International Marine Containers (CIMC) Group since 1970, we combine 40+ years of pressure vessel expertise with cutting-edge clean energy solutions.
Our ASME U, DOT, CE, ISO 9001:2015 certified tanks meet global standards for:
Speak to our experts today:
Europe: Bowen Di | +86 15614368118 | WhatsApp: +86 18132059236 | dibowen@enricgroup.com
North America: Jeremy Wu | +86-15303302613 | WhatsApp: +86 13831019831 | wuzuoliang@enricgroup.com
Problem 1: Boil-off gas losses costing 0.1-0.3% daily
Industry data shows inefficient insulation leads to 25-40% higher operational costs over 10 years (source: Green Hydrogen Production Tech Review). Our triple-layer perlite+aluminum+MLI design reduces boil-off to <0.05%/day
Problem 2: Supply chain disruptions delaying projects by 6-12 months
According to IEA Global Hydrogen Review 2024, 37% of LNG projects face procurement delays. Enric maintains 95% on-time delivery through:
Problem 3: Regulatory non-compliance risking $500K+ fines
78% of LNG storage tank suppliers lack local certifications (source: Fortune Business Insights 2025). Enric holds:
ASME U/UM
CE (EN 13445/AD2000)
DOT 4L
ISO 9001:2015Our vacuum-insulated cryogenic tanks combine patented technologies with factory-direct advantages:
Patented multi-layer insulation system with:
Boil-off rate: <0.05%/day (vs 0.15% industry average)
| Model | Capacity | Pressure Class | Certifications |
|---|---|---|---|
| ES-LNG-10 | 10m³ | 1.7MPa | ASME U, CE, ISO |
| ES-LNG-50 | 50m³ | 2.2MPa | DOT 4L, AD2000 |
| ES-LNG-200 | 200m³ | 3.0MPa | ASME U, PED 2014/68/EU |
Supporting the 42% CAGR growth in LNG vehicles (source: IEA Hydrogen Review 2025), our tanks enable:
Serving the $193B industrial gases market (source: Fortune Business 2034), our tanks maintain:
Enabling off-grid LNG power plants in:
Key features:
Jan Kowalski, Logistics Director, Orlen Group (Poland)
"Enric's 50m³ tank system reduced our LNG fueling station operational costs by €1.2M annually through superior insulation. Their ASME certification gave us confidence for EU market approval."
Li Wei, Project Manager, China National Petroleum Corporation
"Their custom 200m³ tank for our Tarim Basin project achieved 0.04% daily boil-off—critical for our remote desert conditions. The Chinese/English bilingual documentation streamlined customs clearance."
All Enric LNG tanks meet:
ASME Section VIII Div.1 (U Stamp)
CE Marking (EN 13445, PED 2014/68/EU)
DOT 4L (US Department of Transportation)
ISO 9001:2015 Quality Management
FDA-compliant stainless steels
RoHS-compliant componentsView all certifications: https://www.enricgroupsjz.com/certifications/
Standard models: 10-12 weeks from order confirmation
Custom designs: 16-20 weeks (includes engineering review)
Expedited option: Available for 5-10% premium (8-week delivery)
Note: Our 12-week average is 35% faster than industry competitors (source: MarketsandMarkets 2025)
Yes! Our global service network includes:
Flexible options to match your project:
lng-gas-tank lng-gas-tanker liquefied-gas-storage-tank-manufacturer lng-in-oil-and-gas
| Payment Method | Terms | Best For |
|---|---|---|
| TT (Telegraphic Transfer) | 30% deposit, 70% before shipment | Large orders (>$100K) |
| LC (Letter of Credit) | 100% via irrevocable LC | New clients/first orders |
| OA (Open Account) | Net 30-90 days | Established clients with good credit |
Absolutely! We provide:
Minimum order: 10 units (mix of standard/custom models)

Book your LNG storage tank by December 31, 2025 and receive:
Only 15 slots available for this promotion!
🔒 Your data is secure. We never share information with third parties.
Multiple contact options for your convenience:
"The most professional LNG storage tank supplier we've worked with. Their engineers solved our boil-off issues in 2 weeks with a simple valve modification."
Maria Garcia, Operations Manager, Ecopetrol (Colombia)
"Their custom 100m³ tank for our Dubai solar-powered LNG station exceeded all performance specs. The Arabic-English documentation was a game-changer for local approvals."
Ahmed Khan, Project Director, Dubai Electricity & Water Authority
"The fastest lead time we've seen—just 11 weeks from order to delivery in Marseille. Their French-speaking support team handled our port logistics flawlessly."
Sophie Dubois, Procurement Manager, TotalEnergies
Li Mingjun | Senior Cryogenic Storage Engineer at Shijiazhuang Enric Gas Equipment
28 years of experience in LNG storage tank design and international certification
Published author on vacuum insulation technologies in Cryogenics Journal
ASME-certified pressure vessel inspector since 2008
Bachelor's in Mechanical Engineering from Tsinghua University, MBA from China Europe International Business School
Take the first step toward a cost-effective, high-performance LNG storage solution—contact us today!
🔒 Your data is secure. We never share information with third parties.
© 2025 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day