Cutting-edge LNG power plant technology for reliable energy generation, featuring OEM/ODM customization and rapid global delivery
Get Free Technical Consultation in 24 HoursIn today's energy landscape, LNG power plants represent the most flexible and rapidly deployable solution for bridging fossil fuels and renewable energy. With natural gas demand projected to grow 15%+ through 2035 (Oxford Energy, 2025), the stakes couldn't be higher.
Many operators face the dilemma between high-efficiency European designs (60%+ efficiency) and more affordable Asian solutions (50-55%). Our plants deliver 58% efficiency at 20% lower capex through proprietary combustion optimization.
Environmental regulations are tightening globally. Our pre-certified solutions include:
Critical components face 50-120 day delays. Our integrated supply chain includes:
With 20+ years of international LNG power plant experience, we deliver turnkey solutions that balance performance, compliance, and cost. Our plants feature:
Modular LNG power plant construction with 60% faster deployment
| Parameter | 50MW Plant | 100MW Plant | 200MW Plant |
|---|---|---|---|
| Net Efficiency | 58% | 61% | 63% |
| Start-up Time | 15 minutes | 20 minutes | 25 minutes |
| Emissions (NOx) | ≤15 ppm | ≤15 ppm | ≤15 ppm |
| Footprint | 4000 m² | 7500 m² | 14000 m² |
| Delivery Time | 6 months | 9 months | 12 months |
On-site turbine manufacturing with 14-day lead time
Operating in 40+ countries requires more than technical excellence. Our solutions carry the most comprehensive certification portfolio in the industry:
ASME Section VIII Div.1
Boiler & Pressure Vessel Code
PED 2014/68/EU
Pressure Equipment Directive
ISO 9001:2015
Quality Management Systems
EPA NSPS Subpart GG
New Source Performance Standards
RoHS Directive
Restriction of Hazardous Substances
Complete certification portfolio for global LNG power plant deployments
Our solutions power 150+ plants worldwide with a cumulative capacity of 3.2GW. Here's what our clients say:
Shell Global Solutions
Netherlands - 100MW Peak Shaving Plant
"The modular design reduced our installation timeline by 5 months compared to traditional approaches. The remote monitoring system has saved us $1.2M in maintenance costs annually."
- Jan van der Meer, Project Manager
Siemens Energy
Germany - 50MW Grid Support Plant
"The 61% net efficiency exceeds our European operations requirements. The German TÜV certification process was streamlined by 40% with your pre-compliance documentation."
- Klaus Schmidt, Director of Power Generation
GE Vernova
USA - 200MW Industrial Cogeneration
"The ASME certification gave us confidence in the boiler components. We've achieved 99.2% availability since commissioning - exceeding our 95% guarantee."
- Maria Rodriguez, Operations Director
Customer inspection of 100MW peak shaving plant in Netherlands
99.4%
Average Plant Availability
15 min
Cold Start Time (Fastest in Class)
96.8%
Customer Satisfaction Score (CSAT)
Our standard turnkey plants have a 6-12 month delivery window depending on capacity:
Absolutely. Our plants handle gas compositions from:
We guarantee 99% annual availability for our standard plants. This is achieved through:
lng-gas-processing lng-power-station lng-and-ngl lng-gas-producers
We maintain local stocking programs in all our major markets:
We offer flexible payment structures to match your project financing:

Yes, we have partnerships with:
⏳ Only 3 slots available for Q1 2026 delivery in Europe & North America
FREE
Book Your Consultation Now$1.2M
Reserve Your SlotOr your money back - no questions asked
See Full Guarantee Terms
European Energy Operator
Denmark - 75MW Plant
"The 15-minute cold start completely changed our grid management strategy. We've reduced our backup diesel costs by €850,000 annually while maintaining 99.8% grid reliability."
African Infrastructure Company
Nigeria - 50MW Remote Plant
"The containerized solution was a game-changer for our off-grid site. Installation took just 3 weeks versus 4 months for traditional builds. ROI achieved in 18 months."
North American Utility
USA - 125MW Peaking Plant
"The ASME certification eliminated 6 months of permitting delays. We're now running at 62.1% net efficiency - beating our PPA requirements by 2%."
Wang Lei
Senior LNG Power Plant Engineer | 20+ Years in Energy Sector
Shijiazhuang Enric Gas Equipment Co., Ltd.
With two decades in LNG power plant design and deployment, I've witnessed firsthand how the right technology transforms energy strategies. Early in my career at China International Marine Containers (CIMC), I led the development of our first modular LNG power plant - a project that now powers industrial parks across Africa. The key insight? Flexibility isn't optional - it's essential in today's energy transition.
What excites me most about our 2026 solutions is how we've cracked the code on rapid deployment without sacrificing efficiency. Our new combustion optimization algorithms, developed in partnership with Siemens Energy, deliver European-level performance at Asian price points. The proof? Our latest European installation achieved 62.1% net efficiency - a full 3% above the PPA requirements.
I'm proud to say our plants now operate in 40+ countries, from the frozen North Sea platforms to equatorial African grids. Each project teaches us something new about what makes LNG power truly reliable, clean, and profitable. My advice to anyone considering an LNG plant? Start with the end in mind - your gas supply, your grid requirements, and your financing model. That's the foundation for success.
Bowen Di
Senior Regional Manager
📞 +86 15614368118
📱 WhatsApp: +86 18132059236
✉️ dibowen@enricgroup.com
🕒 9:00-18:00 CET | English/Chinese
Jeremy Wu
North America Business Director
📞 86-15303302613
📱 WhatsApp: +86 13831019831
✉️ wuzuoliang@enricgroup.com
🕒 9:00-18:00 EST | English/Chinese
Corporate Team
International Sales Department
📞 +86-311-81663811
✉️ gasequipment@enricgroup.com
🕒 24/7 Global Support | English/Chinese
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Real customer conversations demonstrating our responsive support and technical expertise
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day