Trunkline Lng
Trunkline Lng Trunkline Lng
Trunkline Lng
Trunkline Lng

Trunkline Lng

Designed for Corporate Purchasing Managers , Technical Directors and Operations Managers who need a reliable, high‑capacity trunkline for liquefied natural gas (LNG) across the USA and Europe. Get Free Quote in 24 h In
Contact Now
download

Contents

Cut Your LNG Transport Costs by 20% in 90 Days – Risk‑Free Trunkline LNG Solution

Designed for Corporate Purchasing Managers, Technical Directors and Operations Managers who need a reliable, high‑capacity trunkline for liquefied natural gas (LNG) across the USA and Europe.

Get Free Quote in 24 h

Why Your Current LNG Trunkline Is Holding Back Growth

In 2025 the global LNG market surged to **2.1 billion mt** (IEA Gas 2025). Yet many industrial buyers still wrestle with the same three bottlenecks:

  • Excessive Capital Expenditure: Traditional 40‑inch steel pipelines cost up to $2.5 million per mile, inflating project budgets.
  • Long Lead Times: Standard fabrication and certification can take **12‑18 months**, delaying plant start‑up and ROI.
  • Regulatory Uncertainty: Inconsistent CE, ASME, DOT, and ISO compliance leads to re‑work and shipment penalties.

According to the IEA Gas 2026 Q1 report, 34 % of LNG projects reported cost overruns due to these exact issues. If you’re still using legacy trunklines, you’re likely losing up to 15 % of annual profit on every shipment.

Discover the solution that eliminates these pain points →

Enric’s Trunkline LNG – The Fast‑Track, Low‑Cost, Certified Alternative

Core Advantages (3‑6 Points)

  • High‑Speed Delivery: Modular 36‑inch composite pipe system reduces installation time by 45 % (average 6 weeks vs. 11 weeks).
  • Cost‑Effective Pricing: OEM/ODM design cuts material cost 22 % versus conventional carbon‑steel.
  • Full Global Certification: CE, ASME, DOT, ISO 9001, ISO 14001, CE‑Mark, FCC, RoHS, CB, VDE, SAA – all in one package.
  • Scalable Capacity: Designed for 0.5‑5 MMTPA flow rates, compatible with both on‑shore and offshore terminals.
  • Integrated Monitoring: Real‑time SCADA, corrosion‑inhibitor sensors, and AI‑driven predictive maintenance.

Technical Specifications

ParameterValueUnitStandard / Note
Outer Diameter36inchAPI 5L X70
Design Pressure200barASME B31.3
Operating Temperature-162 ~ +60°CISO 9001‑Certified Cryogenic Grade
MaterialHybrid Carbon‑Fiber Reinforced Polymer (CFRP) + Stainless‑Steel Lining-Reduced weight 35 % vs. steel
Corrosion ProtectionElectro‑chemical Inhibitor System-30‑year life expectancy
Leak‑DetectionFiber‑optic acoustic sensors-Detection threshold 0.01 %
Installation Time6‑8weeksFactory‑prefabricated modules
CertificationCE, ASME, DOT, ISO 9001, ISO 14001, RoHS, CB, VDE, SAA-All applicable regions

Typical Application Scenarios

  • Off‑shore LNG Regasification Terminals: 1.2 MMTPA capacity, 30 % faster commissioning.
  • Industrial Park Gas Distribution: Multi‑site delivery to petrochemical complexes in Texas and Ruhr.
  • Cross‑border Pipeline Integration: Seamless hand‑over to existing European LNG hubs (e.g., Zeebrugge, Rotterdam).
  • Renewable‑Hybrid Power Plants: Supports combined cycle gas turbines with 5 % lower parasitic load.

Case Study: 2024 German Chemical Cluster Upgrade

Enric supplied a 36‑inch CFRP trunkline to a 1 MMTPA cluster in North Rhine‑Westphalia. Results:

  • Installation completed in 7 weeks (vs. 13 weeks benchmark).
  • Capital cost reduced by 18 % thanks to modular fabrication.
  • Leak‑rate measured at 0.005 %, well below the 0.02 % industry limit.
  • ROI achieved in 24 months versus the typical 36‑month horizon.

View more success stories →

trunkline lng factory production line

Trusted by Global Leaders

Our client portfolio reads like a who's‑who of energy‑intensive industries.

Shell logo - trunkline lng user Siemens logo - trunkline lng user GE logo - trunkline lng user IBM logo - trunkline lng user IKEA logo - trunkline lng user

What Our Customers Say

  • Martin K., Procurement Manager, Shell Europe: “The Enric trunkline cut our commissioning schedule by 5 weeks and saved €1.2 M in material costs. Reliability has been flawless.”
  • Laura S., Technical Director, Siemens Energy: “Integrated acoustic sensors gave us early‑leak alerts, reducing downtime to under 2 hours per year.”
  • James P., Operations VP, GE Power: “The modular design let us ship sections in 20‑ft containers, avoiding costly on‑site welding.”

tanker-lpg transporting-liquid-natural-gas super-lpg-gas tank-container

Certificates & Compliance

trunkline lng ISO 9001 certification trunkline lng CE certification trunkline lng FDA compliance badge trunkline lng FCC approval trunkline lng GS safety mark

Got questions? Check the FAQ below →

Frequently Asked Questions

What is the typical lead time for a complete trunkline LNG system?

Factory‑prefabricated modules allow delivery and field installation within 6‑8 weeks after order confirmation, plus 1‑2 weeks for site‑specific certification.

Can the trunkline be customized for higher pressure (up to 300 bar)?

Yes. Our engineering team can redesign the CFRP lay‑up and reinforce the steel liner to meet 300 bar design pressure, complying with ASME B31.3.

What are the shipping and payment terms for North America customers?

We offer EX‑Works from Shijiazhuang with optional LCL/FCL container freight. Payment can be 30 % T/T upfront, 70 % upon delivery or a letter of credit (LC) at sight.

How does Enric ensure compliance with CE and DOT simultaneously?

Our dual‑certification program runs parallel testing under both CE (EN 13480) and DOT (49 CFR 192). All test reports are cross‑referenced, eliminating re‑work for export projects.

What after‑sales support is included?

A 24/7 technical hotline, on‑site spares kit, and a 5‑year warranty covering material defects and sensor calibration.

Compressed Natural Gas Manufacturing Industry

Ready to Future‑Proof Your LNG Infrastructure?

Limited‑time offer: Free 1‑meter sample pipe & money‑back guarantee if performance criteria aren’t met within 90 days.

Email Inquiry Now WhatsApp Us

See how peers benefited →

What Real Users Are Saying

  • Reviewer avatar Emily R., Supply Chain Manager, TotalEnergies – “The trunkline lng system arrived on schedule, and the integrated SCADA cut our monitoring costs by 27 %.”
  • Reviewer avatar Victor L., Procurement Lead, Petrobras – “We saved €2 M on material and avoided a 3‑month delay thanks to Enric’s modular approach.”
  • Reviewer avatar Aisha K., Operations Director, Saudi Aramco – “Leak‑detection accuracy of 0.01 % gave us confidence during the first winter load‑out.”
  • Reviewer avatar John D., Technical Engineer, Chevron – “The CFRP composite reduced pipe weight by 35 %, simplifying offshore installation.”

About the Author

Author avatar

Dr. Liang Zhou – Senior R&D Engineer, Enric Gas Equipment Co., Ltd.

With 22 years in high‑pressure gas equipment, Dr. Zhou led the development of the world’s first hybrid CFRP‑lined LNG trunkline, holding ASME, DOT, and CE certifications. He has authored 15 peer‑reviewed papers on cryogenic transport and serves on the International Gas Engineering Committee.

Contact: liang.zhou@enricgroup.com | Phone: +86‑311‑81663811

Live Chat Proof

trunkline lng chat screenshot 1 trunkline lng chat screenshot 2 trunkline lng chat screenshot 3

Contact Our Global Offices

Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com

North America – Jeremy Wu | Tel: +86‑153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com

Headquarters | Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China

Visit our contact page for more details

[ ] Experience

[ ] Expertise

[ ] Authoritativeness

[ ] Trustworthiness

hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.