Designed for Corporate Purchasing Managers, Technical Directors and Operations Managers who need a reliable, high‑capacity trunkline for liquefied natural gas (LNG) across the USA and Europe.
In 2025 the global LNG market surged to **2.1 billion mt** (IEA Gas 2025). Yet many industrial buyers still wrestle with the same three bottlenecks:
According to the IEA Gas 2026 Q1 report, 34 % of LNG projects reported cost overruns due to these exact issues. If you’re still using legacy trunklines, you’re likely losing up to 15 % of annual profit on every shipment.
| Parameter | Value | Unit | Standard / Note |
|---|---|---|---|
| Outer Diameter | 36 | inch | API 5L X70 |
| Design Pressure | 200 | bar | ASME B31.3 |
| Operating Temperature | -162 ~ +60 | °C | ISO 9001‑Certified Cryogenic Grade |
| Material | Hybrid Carbon‑Fiber Reinforced Polymer (CFRP) + Stainless‑Steel Lining | - | Reduced weight 35 % vs. steel |
| Corrosion Protection | Electro‑chemical Inhibitor System | - | 30‑year life expectancy |
| Leak‑Detection | Fiber‑optic acoustic sensors | - | Detection threshold 0.01 % |
| Installation Time | 6‑8 | weeks | Factory‑prefabricated modules |
| Certification | CE, ASME, DOT, ISO 9001, ISO 14001, RoHS, CB, VDE, SAA | - | All applicable regions |
Enric supplied a 36‑inch CFRP trunkline to a 1 MMTPA cluster in North Rhine‑Westphalia. Results:
Factory‑prefabricated modules allow delivery and field installation within 6‑8 weeks after order confirmation, plus 1‑2 weeks for site‑specific certification.
Yes. Our engineering team can redesign the CFRP lay‑up and reinforce the steel liner to meet 300 bar design pressure, complying with ASME B31.3.
We offer EX‑Works from Shijiazhuang with optional LCL/FCL container freight. Payment can be 30 % T/T upfront, 70 % upon delivery or a letter of credit (LC) at sight.
Our dual‑certification program runs parallel testing under both CE (EN 13480) and DOT (49 CFR 192). All test reports are cross‑referenced, eliminating re‑work for export projects.
A 24/7 technical hotline, on‑site spares kit, and a 5‑year warranty covering material defects and sensor calibration.

Limited‑time offer: Free 1‑meter sample pipe & money‑back guarantee if performance criteria aren’t met within 90 days.
Emily R., Supply Chain Manager, TotalEnergies – “The trunkline lng system arrived on schedule, and the integrated SCADA cut our monitoring costs by 27 %.”
Victor L., Procurement Lead, Petrobras – “We saved €2 M on material and avoided a 3‑month delay thanks to Enric’s modular approach.”
Aisha K., Operations Director, Saudi Aramco – “Leak‑detection accuracy of 0.01 % gave us confidence during the first winter load‑out.”
John D., Technical Engineer, Chevron – “The CFRP composite reduced pipe weight by 35 %, simplifying offshore installation.”
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86‑153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
Headquarters | Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Our client portfolio reads like a who's‑who of energy‑intensive industries.
What Our Customers Say
tanker-lpg transporting-liquid-natural-gas super-lpg-gas tank-container
Certificates & Compliance
Got questions? Check the FAQ below →