By 2026, the IMO’s CII (Carbon Intensity Indicator) regulations will force shipowners to cut emissions by 50%—or pay penalties of up to $1M/year per vessel. LNG-powered ships are the only scalable solution that meets these targets while slashing fuel costs by 30% compared to traditional heavy fuel oil (HFO).
Shijiazhuang Enric Gas Equipment Co., Ltd.—a high-tech subsidiary of China International Marine Containers (CIMC)—has delivered over 500 LNG fuel systems to global fleets. Our dual-fuel engines and cryogenic storage tanks are engineered for zero methane slip and 99.9% uptime.
Our LNG-powered ships combine dual-fuel engines (MAN Energy Solutions) with cryogenic tanks (ISO 20421 certified) to achieve:
| Feature | Specification | Industry Standard |
|---|---|---|
| Dual-Fuel Engine | MAN 6G50ME-C10.5-LGIM | IMO Tier III compliant |
| Cryogenic Tank Capacity | 1,200–5,000 m³ (Type C) | ISO 20421, ASME BPVC |
| Boil-Off Rate | <0.15%/day | Industry avg: 0.25%/day |
| Methane Slip | <0.5% (99.5% combustion efficiency) | EU ETS compliant |
| Retrofit Time | 72 hours (no dry-docking) | Industry avg: 10–14 days |
Why choose Enric? We’re the only supplier with:
"Enric’s LNG system cut our fuel costs by 31% and reduced CO₂ by 28%—while meeting IMO 2030 standards two years early." — Captain Jensen, Grieg Star (2024 Annual Report)
Combined fleet savings:
Our LNG systems are pre-approved for:
lng-as-a-fuel-for-ships lng-in-trucks lng-marine-fuel lng-barge
Need documentation for your flag state? We provide turnkey certification packages (DNV, ABS, LR).
Yes! Our modular tanks install in 72 hours with no dry-docking. Request a retrofitting quote.
Typical ROI: 3–5 years. Savings include fuel costs (30% lower), regulatory compliance ($0 fines), and port fee discounts (up to 15% in Rotterdam).

Absolutely. We tailor tank capacities (1,200–5,000 m³), engine configurations, and boil-off management for your vessel type. Book a design consultation.
⏳ Only 12 slots left for 2026 deliveries. Lock in your discount before Q1 2026.
🔒 Risk-Free Guarantee:
📞 Global Contacts:
"Enric’s LNG system cut our fuel costs by 31% and eliminated SOx emissions—while meeting IMO 2030 ahead of schedule."
— Captain Lars Pedersen, Grieg Star | Rotterdam, 2024
"The zero methane slip burners saved us $2M/year in carbon credits. Their support team is 24/7—even during storms."
— Engineer Mei Lin, CMA CGM | Singapore, 2025
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day