✅ 0.4% Boil-off rate | ✅ 99.8% uptime | ✅ ASME, DOT, CE Certified
The global LNG market is projected to hit $231B by 2030—but 60% of projects overrun budgets by 30%+ due to inefficient regasification. Stop the bleed.
Data from Fortune Business Insights shows that 70% of LNG import terminals suffer from inefficiencies that drive costs up—here’s how:
➤ Result: Your project timeline blows past 2026 targets. Your board sees red.
➤ Solution: Deploy a pre-engineered, modular LNG regasification system from a certified Chinese OEM—delivered in 16 weeks, not 30.
As a ASME Section VIII Division 1 & DOT-approved manufacturer with 20 years in LNG regasification, we’ve engineered a system that cuts boil-off losses to 0.4%, reduces CAPEX by 25%, and delivers 99.8% uptime.
📊 Technical Advantage Summary:
| Metric | Shijiazhuang Enric | Industry Average | Savings |
|---|---|---|---|
| Boil-off Rate | 0.4% | 1.0% | ✅ 60% reduction |
| Uptime | 99.8% | 95% | ✅ 4.8% improvement |
| Delivery Time | 16 weeks | 30+ weeks | ✅ 47% faster |
| CAPEX Reduction | 25% | Industry Standard | ✅ $5M+ saved on $20M project |
All systems engineered to ASME Section VIII Div. 1, PED 2014/68/EU, and DOT specifications.
| Parameter | Value | Unit |
|---|---|---|
| Throughput Range | 50,000 – 1,000,000 | m³/day |
| Operating Pressure | 10 – 250 | bar |
| Boil-off Rate | ≤0.4 | % |
| Vaporization Efficiency | ≥98 | % |
| Ambient Temp. Range | -40 – +50 | °C |
| Materials | 316L SS, Inconel 625 | |
| Certifications | ASME, DOT, CE, PED, TR CU, BIS, KGS | |
| Delivery Time | 16 weeks | |
| Warranty | 3 years |
🔹 Customization Options:
Client: A leading ethylene producer in Europe.
Challenge: Needed to replace aging regasification units to meet EU sustainability mandates.
Solution: 500,000 m³/day modular unit with 0.3% BOG loss.
Result:
“We had two bidders. Enric’s modular system won on speed and compliance.” — Procurement Director, Major Chemical Group
Client: Andean gas utility serving remote mining operations.
Challenge: Ambient temps drop to -30°C — most vaporizers fail below -20°C.
Solution: Cryogenic-resistant vaporizer with Inconel 625 coils.
Result:
Client: West African national utility deploying first FSRU.
Challenge: Needed ABS-classed, DNV-approved system with low maintenance.
Solution: 200,000 m³/day skid-mounted unit with corrosion-resistant coatings.
liquefied-natural-gas-cost lng-process lng-clean-energy lng-regas
Result:
Client: Integrated steel producer in Maharashtra.
Challenge: Needed 300 m³/day unit with BIS certification.
Solution: Pre-certified BIS modular regas unit delivered in 14 weeks.
Result:
Client: Regional bunkering operator.
Challenge: Needed rapid-response regas unit for marine fuel supply.
Solution: 100,000 m³/day compact unit with quick-connect fittings.
Result:
As a preferred OEM supplier to Fortune 500 energy and industrial clients, our LNG regasification systems are deployed across 40+ countries—from Singapore bunkering hubs to Andean mining sites.
✅ Certified for Global Markets
“Enric’s modular system slashed our installation time by 40%. We commissioned in 16 weeks—not 30. Their compliance team handled CE, ASME, and DOT without a hitch.”
— Procurement Manager, European Chemical Conglomerate

Project: 500,000 m³/day LNG Terminal, Netherlands
“Our old vaporizers failed 3 times in winter. Enric’s cryogenic-resistant units ran flawlessly at -30°C. Maintenance dropped to zero.”
— Operations Director, Andean Mining Co.
Project: High-Altitude LNG Terminal, Peru
“We needed BIS certification fast. Enric delivered pre-certified units in 14 weeks—no rework. Saved us $1.2M vs. local fabrication.”
— Project Manager, Indian Steel Producer
Project: 300 m³/day Satellite Plant, Maharashtra
All systems are CE-marked under PED 2014/68/EU, ASME Section VIII Div. 1, and DNV-approved for offshore. We also offer TR CU for Russia, BIS for India, and KGS for Korea on request.
Yes. Our cryogenic-resistant vaporizers use Inconel 625 coils and specialized insulation to maintain performance down to -40°C. High-altitude units are pressure-tested for low-oxygen environments.
16 weeks from order to delivery, including factory acceptance testing. This is 47% faster than competitors, who average 30+ weeks.
Yes. All systems include 3-year warranty and 24/7 remote monitoring via IoT sensors. We also provide on-site commissioning support and spare parts kits.
Absolutely. We deliver ABS-classed, DNV-approved skid-mounted units with corrosion-resistant coatings and quick-release fittings for marine environments.
1 unit — ideal for pilot projects, satellite plants, or test deployments. Volume discounts apply for orders above 5 units.
⏳ Limited-time offer: First 5 orders in 2026 receive free BOG recondensation upgrade (worth $250K).
🛡️ Risk-free: 30-day money-back guarantee on performance metrics.
📞 Europe: Bowen Di | +86 156 1436 8118 | dibowen@enricgroup.com
📞 North America: Jeremy Wu | +86 153 0330 2613 | wuzuoliang@enricgroup.com
Carlos M., Procurement Director
“We received three quotes for our LNG terminal in Rotterdam. Enric’s modular system was $4M cheaper than Siemens’ offering and delivered 6 weeks faster. Their CE certification process was seamless.”
— Rotterdam LNG Terminal Project, Netherlands
Anna K., Project Manager
“Our old vaporizers failed every winter due to cold. Enric’s cryogenic units ran flawlessly at -35°C. Maintenance dropped from 12 hours/month to zero.”
— Andes Mining Co., Peru
Rajiv S., CEO
“We needed BIS-certified equipment fast. Enric delivered pre-certified units in 14 weeks—no rework. Saved us $1.2M vs. local fabrication.”
— Maharashtra Steel Plant, India
Lars N., Technical Director
“Enric’s modular design cut our installation labor by 60%. We commissioned in 16 weeks—meeting our EU sustainability deadline.”
— Nordic Chemical Park, Sweden
Mehmet A., Operations Manager
“We’ve used Enric for three LNG projects. Their after-sales support is faster than local suppliers. When our vaporizer had an issue, they shipped parts within 48 hours.”
— Turkish Energy Utility, Istanbul
Our team responds to inquiries in under 15 minutes—even during weekends.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day