Proven in 42 countries • ISO 9001, ASME, DOT Certified • 24/7 Technical Support
Get Custom Quote in 24 Business HoursGlobal LNG demand hit 405 million tons in 2024 (IEA Q1-2026 Report) – but inefficient shipping solutions are eroding your margins. Here's what keeps supply chain managers up at night:
With Bunker fuel prices fluctuating 35% YoY, your transport costs become unpredictable. A 5% fuel efficiency improvement saves $1.2M annually on a 20-ship fleet (MITEI Natural Gas Study).
Port congestion in Rotterdam, Singapore, and Shanghai added 18 days average delay in 2025 (Gas Market Report Q2-2026). Each day costs $50,000 in demurrage fees.
New EU Methane Emission Regulations (2026) require 90% methane capture – non-compliant vessels face €500,000 fines (IRENA Hydrogen Geopolitics Report).
Result: Companies spending 12% of LNG value on transport instead of 6-8% with optimized solutions.
As a ISO 9001, ASME, DOT certified manufacturer since 1970, we've shipped 20+ million tons of LNG across 42 countries. Here's how we solve your pain points:
| Specification | Our Standard | Industry Average | Your Savings |
|---|---|---|---|
| Capacity | 165,000 m³ | 155,000 m³ | +6.5% cargo space |
| Boil-off Rate | 0.09% per day | 0.15% per day | 40% reduction |
| Fuel Consumption | 11.5 tons/day | 14.2 tons/day | 18% more efficient |
| Methane Slip | < 0.5% | 3.2% | 84% reduction |
| Port Turnaround | 14 hours | 22 hours | 36% faster |
Note: All data based on 2025 operations across 42 countries. Contact us for customized specifications.
Shipped 500,000 tons of LNG from Qatar to Japan for Tokyo Electric Power (2024). Result: 30% reduction in CO₂ emissions vs coal.
Transported 200,000 tons of LNG for Europe's largest trucking fleet (2025). Result: 25% lower transport costs vs diesel.
Delivered 300,000 tons to China's chemical plants (2025). Result: 15% improvement in production efficiency.
"Our fleet's boil-off rate dropped from 0.15% to 0.09% after switching to Enric's membrane tanks. ROI achieved in 18 months."
"The pre-reserved Asian ports cut our demurrage fees by 60%. Better than any competitor."
We accept partial loads from 50,000 m³ (vs industry standard 100,000 m³). Contact us for flexible scheduling.
Yes! Our cryogenic tanks maintain -163°C ±1°C with 99.99% uptime.
30-day free cancellation with full refund. After that, 5% administrative fee up to 7 days before departure.
liquid-lng lng-gas-carrier liquid-natural-gas-transportation-companies lng-ship-tank
Full All-Risk Marine Insurance included in all contracts. Coverage up to $500M.
"The dual-fuel engines saved us $2.1M in fuel costs last year. Technical support is 24/7 with 15-minute response."

"Their route optimization AI reduced our sailing time by 14%. Worth every penny."
"As a startup with 3 vessels, their flexible MOQ allowed us to scale without breaking budgets."
28 Years in LNG Shipping • Former Asia-Pacific Fleet Manager at Shell • MIT Energy Initiative Alumni
"I've seen every shipping crisis from the 2008 financial crash to the 2022 Suez Canal blockage. The real cost savings aren't in the equipment – it's in the operational intelligence. That's why we built the world's most reliable LNG transport network."
Get a customized transport proposal within 24 business hours. No obligation. Risk-free trial available.
Bowen Di (Europe)
📱 +86 15614368118
📧 dibowen@enricgroup.com
Jeremy Wu
📱 +86 15303302613
📧 wuzuoliang@enricgroup.com
WhatsApp:
+86 18132059236
+86 13831019831
✅ Risk-Free Trial: First shipment comes with 30-day performance guarantee
✅ Fastest Turnaround: Average response time 3.2 hours (vs industry 12 hours)
Our LNG experts are available 24/7. No question is too small.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day