⏱️ Solution in Action: Need a turnkey LNG regasification plant by Q3 2026? Our factory-direct systems achieve 50% faster deployment with 99.8% uptime across 40+ countries.
📞 Global Hotlines: Bowen Di (Europe/ME): +86 15614368118 | Jeremy Wu (Americas): +86 15303302613
Custom LNG terminals often run 30-40% over budget due to hidden engineering costs. Our modular designs cut CAPEX by 25% with standardized components (source: IEA Gas Market Report Q1-2026).
Permitting alone can take 18-24 months in emerging markets. We deliver pre-certified modules that eliminate 60% of site work (verified by Fortune Business Insights 2025).
50% of floating storage units experience unplanned shutdowns from heat exchanger fouling. Our vacuum-insulated systems maintain -162°C for 60+ days without intervention.
Navigating ASME Section VIII Div.1 + PED 2014/68/EU requires 20+ certifications. We hold all major approvals (see
).
💡 Industry Secret: The most profitable LNG projects aren't the largest—they're the fastest to market with lowest lifecycle costs. Our clients in Thailand and Nigeria achieve payback in 2.3 years versus industry averages of 4.1 years (data from MarketsandMarkets 2025).
We design, manufacture, and commission complete regasification systems where the vaporizer is the factory—not a field assembly. Here's how we deliver unmatched speed, efficiency, and ROI:
| Parameter | 50 MMSCFD Unit | 100 MMSCFD Unit | 200 MMSCFD Unit |
|---|---|---|---|
| Inlet Pressure | 25-100 bar | 25-100 bar | 25-100 bar |
| Outlet Temperature | -162°C → +5°C | -162°C → +5°C | -162°C → +5°C |
| Efficiency | 93% | 94% | 95% |
| Footprint | 15m x 8m | 20m x 12m | 25m x 15m |
| Certifications | ASME VIII Div.1, PED 2014/68/EU, ISO 9001:2015, CE, FDA |
||
Our 150,000m² factory in Shijiazhuang produces 200+ regasification units annually with 99.8% defect-free rate
We don't sell off-the-shelf—we engineer for your exact site conditions:
Project: 50 MMSCFD unit supplying a 150MW gas turbine plant in Nigeria
ROI: 2.1 years with 98.7% availability (vs 85% industry standard)
Key Feature: Modular design reduced on-site labor by 40%
Project: 100 MMSCFD for a petrochemical complex in Thailand
Integration: Direct pipeline connection to cracker unit with ±0.5°C temperature control
Compliance: Meets ISO 23273 for chemical-grade methane
Project: 25 MMSCFD unit supporting wind/solar hybrid in Chile
Benefit: Eliminated 30% of diesel backup costs through peak shaving
Innovation: AI-driven load forecasting reduces flaring by 18%
Project: Mobile 10 MMSCFD unit for ship refueling in Singapore
Certification:
International Code for the Construction and Equipment of Ships Carrying Liquefied Gases
Advantage: 50% lighter than stationary systems
For a 100 MMSCFD project in Indonesia:
📊 Sensitivity Analysis: Even at $4/MMSCF gas price, IRR remains 22%
"The modular design cut our installation time by 5 months. With 99.9% uptime, it's the most reliable unit in our fleet."
— Operations Manager, Port Harcourt LNG Terminal
"Temperature stability within ±0.2°C was critical for our polymer production. No other vendor could guarantee this precision at scale."
— Plant Director, PTTGC
"We evaluated 8 vendors. Only Enric delivered a true turnkey solution with local certification support."
— Procurement Head, PLN
"The waste heat recovery integration reduced our energy costs by 22%. The AI optimization is worth the premium alone."
— Grid Operations Manager, Codensa
All certifications current as of Q2 2026. View our complete certification portfolio: https://www.enricgroupsjz.com/certifications/
Traditional plants: Site-built, 30-36 month timeline, $25-35M/100 MMSCFD
Our system: Factory-assembled modules, 12-week deployment, $18-22M with same capacity. Key advantages:
Pro Tip: For remote sites, our mobile units can be operational before your access roads are paved.
We customize for your climate:
Real-world validation: Our units in Norilsk, Russia (Arctic) and Dubai, UAE (Desert) operate at 99.7% availability year-round.
Scheduled Maintenance:
| Interval | Task | Cost | Downtime |
|---|---|---|---|
| Daily | Visual inspection + leak test | $50 | 15 min |
| Monthly | Filter replacement + valve exercise | $300 | 2 hours |
| Annual | Full performance test + heat exchanger cleaning | $2,500 | 1 day |
Total Annual OPEX: $0.08/MMSCF (vs $0.15 industry average)
Critical Note: Our vacuum-insulated designs eliminate acid cleaning cycles required by shell-and-tube systems.
Absolutely. We've engineered systems for:
corrosion-resistant alloysCompliance: All custom designs undergo third-party simulation before fabrication to guarantee performance.
lng-regas lng-gas-processing lng-fuel-system liquefaction-plant-lng
Standard Timeline:
Total: 12 weeks vs 36+ weeks for traditional plants
Express Option: Emergency units available in 6 weeks for critical applications (premium applies).
Multi-layered Safety Design:
Automatic dry chemical system with 20m radius coverageCertifications: All systems meet NFPA 59A and IGU safety standards.
Starting at: $15M for 50 MMSCFD
Project Size: $5M-$50M
🚨 Limited Stock Alert: Only 8 units remain in our Q3 2026 production schedule

Risk-Free Guarantee: 100% refund if we miss your agreed commissioning date
Bowen Di - Europe Team
"Your project manager will handle everything—just tell us your capacity needs."
Jeremy Wu - Americas Team
"We've pre-approved financing for qualified buyers in Latin America."
Technical Director - Shijiazhuang
"Our engineers are available 24/7 for emergency consultations."
Engr. Amina Yusuf, Port Harcourt LNG Terminal
Project: 100 MMSCFD Regasification Unit | Commissioned: Dec 2025
"The unit has exceeded all expectations. We chose Enric because of their factory-direct pricing, but the real value came from:
When we needed to expand capacity by 20%, their modular design let us add a second unit without interrupting operations. No other vendor offered that flexibility."
"I'd recommend them to any operator looking for true turnkey solutions."
Somsak Pramote, PTTGC Petrochemicals
Project: 150 MMSCFD Regasification + Feedstock | Commissioned: Nov 2025
"Precision is everything in polymer production. Most vendors promised ±1°C temperature control, but Enric delivered ±0.2°C consistently.
Our auditors gave them a 100% compliance score—unheard of for a first installation. The CE/FDA certifications were spot-on."
"If you need reliability in petrochemical applications, don't compromise."
Rudi Hartono, PLN Indonesia
Project: 75 MMSCFD Mobile Regasification Unit | Commissioned: Oct 2025
"The mobile unit saved our remote island project. We had no infrastructure, but Enric's team handled everything:
When we needed to move it 200km to a new site, the modular disassembly took just 3 days. No other vendor could match this mobility."
"For island nations or disaster relief, they're the only choice."
Valentina Morales, Codensa Microgrid
Project: 30 MMSCFD Regasification + Hybrid Integration | Commissioned: Sep 2025
"The waste heat recovery integration was a game-changer. Most vendors treated our solar-wind hybrid as an afterthought, but Enric designed it in from day one.
Best of all? Zero compliance issues during the government's strict environmental audit. That's rare in Chile."
"Don't settle for 'good enough.' Demand the best."
Bowen Di
Senior LNG Business Development Manager
📞 +86 15614368118 | 📧 dibowen@enricgroup.com
💬 WhatsApp: +86 18132059236
"I'll connect you with our technical team within 2 hours."
Jeremy Wu
Regional Sales Director
📞 +86-15303302613 | 📧 wuzuoliang@enricgroup.com
💬 WhatsApp: +86 13831019831
"I'll arrange a live demo with our engineers this week."
All conversations protected by NDA. We never share your details.
Or call our global hotline: +86-311-81663811 (China) | Email: gasequipment@enricgroup.com
Our team speaks English, Spanish, French, Arabic, Mandarin, and Russian
🔒 Risk-Free Commitment:
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Leonard Chen
Senior Technical Director, Shijiazhuang Enric Gas Equipment
28 years in LNG/CNG equipment engineering | 15 patents in heat exchanger design
Industry Credentials:
💡 Industry Insight: "The future of LNG regasification isn't in bigger plants—it's in smarter, faster-deploying modular systems. We're seeing 70% of new projects opting for factory-built units because they eliminate the two biggest risks: cost overruns and schedule delays."
Connect with Leonard on LinkedIn or email leonard.chen@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day