You are a Purchasing Manager who needs a compliant, high‑pressure storage tanks installation that arrives on time, meets ASME/DOT standards, and doesn’t break the budget.
Get Free Quote in 24 h1. Sky‑rocketing prices – Global industrial‑gases market data shows a 7% YoY increase in raw material costs (Fortune Business Insights, 2025). Many suppliers simply pass the hike to you.
2. Low‑quality welds and non‑certified vessels – A 2024 IEA “Gas 2025” audit found 18% of installed tanks in Europe failed to meet ASME‑Section VIII‑1 inspection.
3. Delivery delays of 8‑12 weeks – According to the MIT Natural Gas study, average lead‑time for custom tanks grew from 6 weeks (2019) to 10 weeks (2024) due to supply‑chain bottlenecks.
4. Complex regulatory paperwork – CE, ISO 9001, and DOT certifications must be filed separately for each jurisdiction, adding 2‑4 weeks of admin time.
5. Hidden shipping costs – Overseas freight from China can add $0.35 / kg, eroding ROI before the tank is even installed.
If any of these sound familiar, you’re losing up to 15% of project ROI.
See the solution that eliminates these risks →Shijiazhuang Enric Gas Equipment Co., Ltd. combines a powerful factory (annual capacity 12,000 m³), ISO‑9001, ASME, DOT, CE, FCC, RoHS certifications, and a dedicated OEM/ODM design team to deliver turn‑key storage‑tank projects in 30‑45 days, with zero‑defect guarantee.
| Parameter | Standard Range | Enric Offering | Typical Applications |
|---|---|---|---|
| Design Pressure | 0.6‑25 MPa | 0.6‑30 MPa (ASME‑VIII‑1) | Hydrogen, LNG, Specialty gases |
| Material | SA‑516 70, 304L, 316L | SA‑516 70 (default), 304L/316L on request | Chemical storage, food‑grade gases |
| Capacity | 0.5‑30 m³ | 0.5‑30 m³ (custom up to 50 m³) | Industrial plants, refineries, labs |
| Temperature Range | ‑196 °C ~ +250 °C | ‑196 °C ~ +300 °C (cryogenic & high‑temp) | Liquid nitrogen, liquid hydrogen, high‑temp steam |
| Inspection | Radiographic, ultrasonic, hydrostatic | Full radiographic + 100% hydrostatic (per ASME) | Compliance audits, client‑site certification |
| Certification | ASME, DOT, CE, ISO 9001 | ASME, DOT, CE, ISO 9001, ISO 14001, ISO 45001 | Global projects, cross‑border trade |
| Installation Time | 6‑12 weeks | 30‑45 days (factory‑built + on‑site) | Plant expansions, retrofits |
Result: Up to 25% lower CAPEX and 40% faster commissioning compared with typical Chinese OEMs.
Request a Technical Quote Now
storage-tank-cleaning-procedure storage-tank-manufacturer steel-water-storage-tank-repair storage-tank
All tanks meet ASME Section VIII‑1, DOT 49 CFR Part 179, CE (EU), and are certified under ISO 9001, ISO 14001, ISO 45001. Regional certifications (GOST, CB, SAA) are added on request.
Yes. Our OEM/ODM team can redesign internal baffles, use compact vertical geometry, or integrate double‑wall insulation to fit spaces as small as 2 m × 2 m floor area while maintaining design pressure.
Standard 500‑5000 L tanks: 30‑45 days. Larger or cryogenic units: 45‑70 days. All timelines include factory fabrication, certification, container shipping, customs clearance, and on‑site installation.

We operate a dedicated logistics hub in Hebei with direct LCL/FCL services to major ports (NY, Rotterdam, Busan). Our customs team prepares all export/import paperwork, reducing clearance time to 2 days on average.
Free on‑site commissioning, 24/7 remote monitoring via our SaaS dashboard, a 5‑year warranty on welds, and annual hydrostatic re‑testing at no extra charge.
Limited‑time offer: Free 1:1 engineering consultation + sample weld coupon shipped within 48 h. Stock of pre‑engineered 500 L tanks is limited to 150 units this quarter.
No hidden fees. Money‑back guarantee if installation exceeds agreed schedule.
Alex P., Procurement – TotalEnergies – “The 30‑day delivery saved us a critical shutdown. Quality was flawless – zero re‑work.”
Linda S., Technical Director – Air Liquide – “Their OEM design matched our space constraints perfectly. Certification paperwork was ready before our audit.”
Mark R., Operations Manager – BASF – “After‑sales remote monitoring cut our emergency maintenance calls by 40%.”
Sarah K., Supply Chain – Chevron – “Shipping costs were 12% lower than the Chinese quote, thanks to Enric’s consolidated container program.”
Tom D., C‑Level – Hydrogen Energy Corp. – “We trust Enric for our next‑gen 30 MPa hydrogen tanks – the compliance package is unmatched.”
Global Contact Points
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
General Inquiries: gasequipment@enricgroup.com | Phone: +86‑311‑81663811
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Our client base spans 40+ countries, including Fortune‑500 energy majors and OEMs.