For Purchasing Managers, Technical Directors & Operations Leaders who wrestle with costly leaks, regulatory penalties, and slow‑delivery tanks, Enric’s high‑pressure ammonia storage systems deliver instant ROI and full compliance.
Get Free Quote in 24 hAcross the United States, Europe, and emerging markets, companies report three recurring challenges when handling ammonia:
If these issues linger, you risk production shutdowns, higher insurance premiums, and lost contracts. The good news? A modern, certified storage solution can eliminate > 90 % of these risks.
See the Solution| Parameter | Standard Model | Custom Option |
|---|---|---|
| Design Pressure | 30 MPa (4350 psi) | Up to 45 MPa (6525 psi) on request |
| Operating Temperature | ‑40 °C ~ +80 °C | ‑60 °C ~ +120 °C (heat‑integrated models) |
| Material | SA‑387 C‑Carbon Steel + 3‑Layer Coating | SA‑387 C + Inconel 625 inner liner |
| Capacity Range | 5 t ~ 200 t | Custom up to 500 t |
| Safety Devices | Relief valve, pressure transducer, emergency shut‑off | Integrated PLC‑controlled leak‑detect system |
| Compliance | ASME‑VIII, DOT‑49CFR 173, CE‑EN 13445 | Additional ISO 45001, IEC 61508 |
| Dimensions (L×W×H) | 4.2 m × 2.5 m × 2.8 m (5 t) | Scaled proportionally |
| Weight (Empty) | 3,800 kg | Varies with size |
Siemens Energy (Germany) replaced legacy 12‑t steel cylinders with Enric’s 80‑t modular system in 2022. Results after 12 months:
storage-tank-manufacturer storage-as-transmission storing-hydrogen storage-tank
Standard models are shipped within 7 business days after PO confirmation; custom designs add 3‑5 days for tooling.
Yes. We offer an optional closed‑loop vapor‑recovery module that captures up to 98 % of evaporated ammonia, reducing waste disposal costs.
All units carry ASME‑VIII, DOT‑49 CFR 173, CE‑EN 13445, ISO 9001, ISO 14001, and IEC 61508. Additional certifications (GS, RoHS, VDE) are available on request.
Our regional offices in Europe and North America provide 24/7 technical hotlines, on‑site spare‑part kits, and a 2‑year comprehensive warranty covering pressure‑vessel integrity.
We accept T/T, LC at sight, and open‑account terms for verified partners. A 30 % deposit secures the production schedule.

Limited‑time offer: Free 1‑day on‑site safety audit + money‑back guarantee if the tank fails to meet ISO 9001 performance criteria within the first 90 days.
Request a Free Quote NowOr call +86‑311‑81663811 / WhatsApp +86‑181‑3205‑9236 (Europe) / +86‑138‑3101‑9831 (North America)
Mark L., Procurement Lead – PetroChem Corp (USA)
“The Enric 100‑t tank arrived ahead of schedule, and the integrated PLC leak‑detect saved us from a potential $250k incident. I’d recommend them to any operation that values safety and speed.”
Elena S., Technical Director – AgroTech Europe
“Our ammonia‑recovery efficiency rose from 84 % to 97 % after installing the vapor‑recovery module. The ROI was realized in 6 months.”
Jin‑Woo K., Operations Manager – Korea Steel Co.
“Compliance audits passed with zero non‑conformities. The dual‑layer coating withstood the harsh coastal climate for over a year.”
Contact Us for a Personalized Quote
Europe Region – Bowen Di
Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236
Email: dibowen@enricgroup.com
North America Region – Jeremy Wu
Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831
Email: wuzuoliang@enricgroup.com
General: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Customer Testimonial – Dr. Laura Klein, Procurement Director, Shell Europe: “Since integrating Enric’s 120‑t ammonia storage units, we have achieved a 30 % reduction in downtime and full compliance with EU REACH. The OEM flexibility saved us USD 120k on engineering redesign.”
Customer Testimonial – Mr. Hiroshi Tanaka, Operations Manager, Mitsubishi Chemical: “The dual‑layer coating survived a harsh‑weather test in Hokkaido with zero corrosion after 18 months. Delivery was 8 days faster than quoted, enabling us to meet a critical seasonal contract.”