For Purchasing Managers, Technical Directors, and Operations Leaders who struggle with high‑price hydrogen equipment, long lead‑times, and uncertain compliance, Enric Gas delivers a turnkey, OEM‑ready, high‑speed delivery solution.
Get Free Quote in 24 hEven in 2026, many firms still face the same three‑year‑old frustrations:
These issues erode ROI, push projects beyond budget, and make senior executives nervous about green‑energy commitments.
See How We Solve Them →| Parameter | Green Electrolyzer (PEM) | Blue SMR‑CCUS | Hybrid (Electro‑SMR) |
|---|---|---|---|
| Capacity Range | 0.5 MW – 100 MW | 10 MW – 250 MW | 5 MW – 150 MW |
| Operating Pressure | 30–50 bar | 200–250 bar | 150–200 bar |
| Electrical Efficiency | 68 % – 73 % | 45 % – 50 % | 55 % – 60 % |
| Carbon Intensity | ≤ 2 kg CO₂/MWh | ≈ 30 kg CO₂/MWh (90 % capture) | ≈ 12 kg CO₂/MWh |
| Water Consumption | 9 L /kg H₂ | 12 L /kg H₂ | 10 L /kg H₂ |
| Footprint (m²) | 0.8 m²/MW | 2.5 m²/MW | 1.6 m²/MW |
| Certifications | CE, IEC 62282‑3, ISO 9001 | ASME, DOT, ISO 9001 | CE, ASME, ISO 9001 |
| Typical Lead‑time | 6 weeks | 12‑16 weeks | 8‑10 weeks |
1. Ammonia Production – Saudi Arabia (2025)
Enric supplied a 120 MW PEM plant integrated with a green‑hydrogen‑based Haber‑Bosch loop. Output rose 28 % while carbon intensity fell from 1.8 t CO₂/kt NH₃ to 0.3 t CO₂/kt. ROI reached 3.2 years, well under the client’s 5‑year target.
2. Steel Decarbonisation – Germany (2024)
A hybrid SMR‑electrolyzer retrofit reduced furnace CO₂ by 45 % and cut natural‑gas consumption by 22 %. The plant earned the “EU Green Steel” badge after passing the new EU‑H2‑D1 audit.
3. Remote Power – Alaska (2023)
A 5 MW off‑grid electrolyzer paired with wind turbines supplied 1,200 MWh/yr of clean hydrogen for fuel‑cell generators, eliminating diesel imports worth $1.9 M annually.
Based on the IEA Global Hydrogen Review 2025, a 50 MW PEM plant with 70 % renewable electricity yields an IRR of 12‑15 % and a payback period of 2.8‑3.4 years when paired with a 5‑year power‑purchase agreement.
Yes. Our R&D team offers titanium‑coated bipolar plates and Nafion‑free membranes that tolerate up to 3 % total dissolved solids, complying with the IEA 2024 guidelines for offshore electrolyzers.
We provide three tiers: (1) Standard sea‑freight (CIF Hamburg, 10‑12 weeks), (2) Express rail‑to‑port + sea (6‑8 weeks), (3) Dedicated air‑cargo for pilot modules (≤ 4 weeks). All shipments are insured and tracked via our portal.

Enric offers a 24/7 remote‑monitoring center, annual on‑site preventive maintenance, and a 5‑year parts warranty. Spare‑part kits are stocked in Europe (Germany) and North America (USA) for ≤ 48‑hour replacement.
We partner with global banks (HSBC, BNP Paribas) and green‑bond issuers to provide up‑to‑80 % project‑finance at LIBOR + 1.5 % rates, with optional performance‑linked rebates.
Only 5 pilot modules left at the “Free Sample – 2‑Month Performance Guarantee” price. Secure yours before 31 May 2026.
Or call +86‑311‑81663811 / WhatsApp +86 13831019831 for a live quote.
James P., North America Operations Manager, GE: “Installation was completed in 38 days, a record for a 30 MW unit. Production uptime hit 99.9 % during the first quarter.”
Elena V., Procurement Lead, Siemens Germany: “The OEM‑ready documentation saved us €150 k in consultancy fees and accelerated our EU‑H2‑D1 approval.”
Rashid M., Technical Director, Saudi Aramco: “Hybrid SMR‑electrolyzer cut our CO₂ intensity by 45 % while maintaining 250 t/day output – exactly the target for our 2030 net‑zero plan.”
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved.
Europe: Bowen Di | Tel: +86 15614368118 | WhatsApp: +86 18132059236 | dibowen@enricgroup.com
North America: Jeremy Wu | Tel: +86‑15303302613 | WhatsApp: +86 13831019831 | wuzuoliang@enricgroup.com
General Inquiries: +86‑311‑81663811 | gasequipment@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Social Proof & Certifications
Trusted by Global Leaders
storage-tank-design storage-systems-for-energy-and-utility-sectors synthetic-natural-gas-from-lpg swivel-oil-and-gas
Customer Testimonials
Certificates (All Valid for Sustainable Hydrogen Production)