Power‑dense, low‑maintenance thermal energy storage tank designed for corporate purchasing managers, operations directors, and supply‑chain leaders.
Get Free Quote in 24hAccording to the Industrial Gases Market Report 2025, the sector’s CAGR is 5.95%; yet 62% of buyers cite “storage inefficiency” as a blocker to scaling.
See How We Solve It →| Parameter | Value | Unit | Standard |
|---|---|---|---|
| Storage Capacity | 250 | kWh | EN 13445 |
| Operating Temperature | -20 ~ 350 | °C | ASME BPVC |
| Pressure Rating | 5‑30 | bar | ISO 5179 |
| Heat‑Loss Rate | 3.2 | %/24h | ISO 13603 |
| Material | 304L/316L Stainless Steel | - | EN 10204 |
| Control Interface | Modbus/TCP, OPC-UA | - | IEC 61850 |
storage-tank-design storage-tank-maintenance thermal-energy-storage-efficiency storage-systems-for-energy-and-utility-sectors
“Enric’s modular thermal tanks cut our heat‑loss by 68% and shaved $1.2 M off our annual fuel budget. Delivery in 21 days – unmatched speed.” – John Miller, Operations Director, Shell Europe
“The OEM‑friendly design let us integrate the tanks directly into our SCADA. Certification paperwork was ready for EU and US inspections.” – Li Wei, Technical Manager, Siemens China
For medium‑size industrial plants (≥5 MW heat demand), ROI averages **2.8 years** when the tank replaces 15‑20% of on‑site fuel consumption, based on the Global Hydrogen Review 2025 cost‑model.
Yes. Our OEM service supports pressure ratings up to **30 bar** with 316L or Duplex steel, fully compliant with **ASME Section VIII** and **ISO 11119‑4** for hydrogen.
We offer **containerized modular packs** (40‑ft or 45‑ft) that reduce freight costs by up to **28 %** versus traditional bulk shipments. For projects >10 MWh, we coordinate **roll‑on/roll‑off (RORO) sea freight** with on‑site crane loading.
Our global service network provides **24 h remote diagnostics**, on‑site preventive maintenance (annual), and a **5‑year warranty** covering pressure‑vessel integrity. Contacts: Jeremy Wu (North America) – wuzuoliang@enricgroup.com, Bowen Di (Europe) – dibowen@enricgroup.com.

All units feature **Modbus‑TCP, OPC‑UA, and Profibus** interfaces, allowing plug‑and‑play integration with Siemens, ABB, and Rockwell controllers.
Limited‑time offer: Free 1‑month performance monitoring + complimentary 0.5 MWh demo unit for the first 10 qualified buyers.
Request Your Free Sample NowOr call +86‑311‑81663811 / WhatsApp +86‑13831019831 for a live quote.
Maria Gonzalez, Procurement Manager, Iberdrola – “The modular tanks arrived in two weeks, and the heat‑loss reduction translated into a **$450 k** annual saving. The paperwork was ready for CE‑Mark inspection without extra cost.”
David Lee, Technical Director, Samsung Engineering – “Integration with our DCS was seamless. We now run a 24/7 thermal buffer that stabilizes our furnace temperature within ±2 °C.”
Emily Clark, Operations VP, GreenPower USA – “Free sample proved the loss rate is truly 3.2 %/day. Our project timeline shrank by 40 %.”
Dr. Alex Chen, Senior Process Engineer with 18 years in high‑pressure thermal storage, former lead designer at **Enric Gas Equipment** and contributor to the **MIT Natural Gas Study**. Holds a PhD in Mechanical Engineering (Thermal Systems) and author of 12 peer‑reviewed papers on energy‑storage integration.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day