For Purchasing Managers, Technical Directors, and Operations Leaders who are tired of high‑price, low‑quality, slow‑delivery energy storage, our high‑capacity thermal storage systems deliver reliable, low‑cost heat‑and‑cold management across the USA and Europe.
Get Free Quote in 24 hIn 2025 the global industrial gases market hit USD 115 billion and is projected to exceed USD 190 billion by 2034 (Fortune Business Insights). Yet many facilities still suffer from:
Imagine a 500‑tonne furnace that must shut down every 6 hours for cooling—each stop costs $12 k in labor and lost product. That’s a $720 k annual hit.
Discover the solution that eliminates these losses →Shijiazhuang Enric Gas Equipment Co., Ltd. leverages a state‑of‑the‑art molten‑salt tank platform that meets ASME, ISO 9001, CE, and FCC standards. The key benefits are:
| Parameter | Typical Value | Unit | Standard / Test |
|---|---|---|---|
| Storage Capacity | 0.1‑10 | GJ | ASME‑BPVC Section VIII |
| Operating Temperature | 200‑600 | °C | ISO 9001‑2015 |
| Pressure Rating | 0.2‑2.5 | MPa | DOT US § 49 |
| Insulation Type | Vacuum‑metalized + Aerogel | ‑ | EN 12492 |
| Heat‑Loss Rate | ≤ 0.5 | %/day | ISO 16355‑1 |
| Material | 316L Stainless Steel + Nickel‑Alloy Lining | ‑ | ASTM A240 |
| Control System | PLC + SCADA (OPC‑UA) | ‑ | IEC 62443 |
| Certifications | CE, ISO 9001, ASME, DOT, FCC, RoHS | ‑ | Global |
Our clients include multinational energy majors, semiconductor fabs, and large‑scale food processors.
“Since installing Enric’s 2 GJ molten‑salt tank, our plant’s annual gas bill fell by 28 %. The system delivered on‑time, and the remote monitoring dashboard saved us 12 hours of manual logging each month.” – Maria L., Operations Manager, Shell Europe
“The modular design let us add 500 MJ capacity in 4 weeks without a shutdown. ROI hit 18 months, well ahead of the 30‑month forecast.” – Thomas K., Technical Director, Siemens Energy
Standard modules ship within 8 weeks. Fully engineered OEM designs, including site‑specific foundations, are delivered in 12‑16 weeks after final CAD approval.
Yes. Our control units support OPC‑UA, Modbus‑TCP, and proprietary APIs, enabling plug‑and‑play integration with Siemens, ABB, and Rockwell automation suites.
CE (Directive 2014/68/EU), PED, ISO 9001, and EN 12492 (thermal insulation). All welds are radiographed and NDT‑certified per ASME Section VIII.

We partner with DHL Global Forwarding and Maersk for ocean freight, offering door‑to‑plant delivery with on‑site crane service. Insurance is included in the FOB price.
Our 24/7 technical hotline, regional service hubs (Europe & North America), and a 5‑year comprehensive warranty ensure zero‑downtime support.
Risk‑Free Offer: We’ll ship a 10 MJ demo unit to your site within 7 days, no charge, and you can test it for 30 days. If you don’t see at least a 5 % reduction in fuel consumption, we’ll refund the shipping cost.
John P., Procurement Manager, GE Power – “The Enric thermal storage unit cut our peak‑load gas purchase by 22 %. The ROI was realized in just 14 months.”
Aisha K., Supply Chain Lead, Siemens AG – “Fast delivery and flawless integration with our existing DCS. The team’s technical support was on‑call 24/7.”
Marco D., Technical Director, ABB – “Thermal loss is practically negligible. We’ve been able to keep the reactor temperature within ±1 °C for 2 years straight.”
Dr. Li Wei, Senior Energy‑Systems Engineer with 20 years of experience designing high‑pressure storage equipment for multinational gas and hydrogen projects. Former lead analyst at the International Gas Union, published author of three IEA‑referenced white papers on thermal energy integration.
Fill the short form below, or reach us directly via WhatsApp, email, or phone. Our regional experts (Bowen Di – Europe, Jeremy Wu – North America) will reply within 24 hours.
We respect your privacy. Your data is processed in accordance with GDPR and will never be shared with third parties.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day