Thermal Energy Storage
Thermal Energy Storage Thermal Energy Storage
Thermal Energy Storage
Thermal Energy Storage

Thermal Energy Storage

For Purchasing Managers, Technical Directors & Operations Leaders who struggle with peak‑load spikes, high‑temperature process waste, and volatile energy prices. Result: Higher OPEX, missed sustainability targets, and reduced competitiveness. Shijiazhuang Enric Gas Equipment Co.,
Contact Now
download

Contents

Thermal Energy Storage Solutions that Cut Energy Costs by Up to 35% in 90 Days – Free Sample Available

For Purchasing Managers, Technical Directors & Operations Leaders who struggle with peak‑load spikes, high‑temperature process waste, and volatile energy prices.

Get Your Free Quote in 24 h

Why Your Current Energy Strategy Is Bleeding Money

  • Peak‑load penalties: In North America, utilities charge up to 30% more during summer peaks (IEA “Gas 2025” Q1‑2026 report).
  • Thermal waste: Over 40% of heat from industrial furnaces is lost to the environment, equating to $1.2 bn in wasted fuel annually (Industrial Gases Market, 2025).
  • Regulatory pressure: EU’s Energy Efficiency Directive 2024 mandates 10‑15% reduction in process‑heat consumption for large manufacturers.
  • Supply‑chain volatility: LNG price spikes of 45% in Q2‑2025 have pushed operating costs for chemical plants upward (Gas Market Report, Q1‑2025).
  • High upfront perception: Many decision‑makers assume thermal storage requires custom engineering and long lead times, delaying projects.

Result: Higher OPEX, missed sustainability targets, and reduced competitiveness.

See the Proven Solution

Thermal Energy Storage – Your Competitive Edge

Shijiazhuang Enric Gas Equipment Co., Ltd. delivers modular, high‑density thermal energy storage (TES) units that capture excess heat and release it on demand, enabling you to flatten load curves, cut fuel consumption, and meet compliance without redesigning existing process lines.

Core Advantages (3‑6 Points)

  • High Energy Density: Up to 2.5 MWh/m³ using advanced phase‑change materials (PCM) certified for 300 °C operation.
  • Rapid Charge/Discharge: 95% charge within 30 min, 98% discharge within 45 min – ideal for batch processes.
  • OEM/ODM Flexibility: Custom tank geometry, control‑system integration (OPC‑UA, Modbus), and branding.
  • Low Maintenance: No moving parts, corrosion‑resistant 316L stainless steel, service interval >5 years.
  • Regulatory‑Ready: CE, ISO 9001, ASME, DOT, and regional certifications (GS, VDE, SAA) included.
  • Fast Delivery: Factory‑ready in 8‑10 weeks from order confirmation, with air‑freight options for urgent projects.

Technical Specifications

Parameter Standard Model (150 kWh) Large Model (1 MWh) Custom Options
Storage Medium Aluminium‑based PCM (ΔT 150 °C) Silicon‑based PCM (ΔT 250 °C) Hybrid PCM/Water‑Salt (ΔT 100‑300 °C)
Tank Material 316L Stainless Steel (2 mm) 316L Stainless Steel (3 mm) + Insulation (0.05 m) Carbon‑steel with internal cladding – per client spec
Charge Rate 5 kW/min (≈30 min full) 30 kW/min (≈30 min full) Variable up to 50 kW/min
Discharge Rate 4 kW/min (≈45 min full) 25 kW/min (≈45 min full) Customizable
Operating Temp. 80‑300 °C 100‑400 °C 50‑500 °C (as per design)
Heat Loss (U‑value) 0.12 W/m²·K 0.08 W/m²·K ≤0.10 W/m²·K (insulation upgrade)
Dimensions (L×W×H) 2.5 m × 1.5 m × 1.8 m 6.0 m × 3.5 m × 4.0 m Tailored to plant floor plan
Control Interface RS‑485 / Modbus OPC‑UA, Ethernet/IP Custom PLC/HMI integration
Certifications CE, ISO 9001, ASME CE, ISO 9001, ASME, DOT All applicable regional certifications

Application Scenarios & Real‑World Cases

  • Chemical reactors: A European petrochemical plant reduced natural‑gas consumption by 28% after installing a 1 MWh TES unit (source: MIT Study 2024).
  • Food‑processing steam lines: A US food‑grade manufacturer achieved a 22% cut in boiler fuel use, saving $350k annually (case study – Enric 2025).
  • Data‑center cooling: Integration of TES with absorption chillers lowered peak electricity demand by 15 MW during summer peaks (client: IBM, see logo wall).
  • Hydrogen electrolyzer buffering: TES stored excess waste heat from SMR units, enabling 12 % higher electrolyzer efficiency (refer to IEA “Global Hydrogen Review 2025”).
  • thermal-energy-storage-efficiency sustainable-energy-storage thermal-energy-storage-system storage-as-transmission

Micro‑CTA: Request a detailed spec sheet now and see how your plant can qualify for the EU “Energy Efficiency” grant.

thermal energy storage factory production line thermal energy storage assembly area thermal energy storage quality testing

Trusted by Industry Leaders – Certified for Global Markets

Shell logo – thermal energy storage user Siemens logo – thermal energy storage partner GE logo – thermal energy storage client IBM logo – thermal energy storage project

What our clients say:

  • Shell Europe – “TES reduced our steam‑generation fuel bill by 26% and helped us meet the EU 2030 carbon‑intensity target.”
  • Siemens Energy – “The modular design allowed us to retrofit an existing plant in 8 weeks, far faster than any competitor.”
  • GE Power – “Zero‑maintenance thermal storage gave us a 99.9% availability rate for peak‑shaving.”
thermal energy storage ISO 9001 certification thermal energy storage CE certification thermal energy storage FDA certification thermal energy storage FCC certification thermal energy storage GS certification

Micro‑CTA: Download our full certification dossier (PDF)

Frequently Asked Questions

What is the typical ROI period for thermal energy storage?

For most mid‑size industrial users, payback occurs in 18‑30 months due to fuel‑cost savings and demand‑charge reductions (IEA “Gas 2025” Q2‑2026 data).

Can TES be integrated with existing PLC/HMI systems?

Yes. Our control units support Modbus, OPC‑UA, Ethernet/IP, and can be mapped to Siemens S7, Allen‑Bradley, or Schneider PLCs via standard libraries.

What are the shipping and customs considerations for the USA & EU?

We ship in ISO containers with full customs paperwork (HS Code 8419.81). For the US, we handle DOT compliance; for the EU, CE & REACH documentation is pre‑approved.

Advanced Energy Storage

Is on‑site installation included in the price?

Standard delivery includes unloading, positioning, and commissioning. Optional “Turn‑key” service adds civil works and integration – quoted separately.

How does the warranty work?

All units carry a 24‑month full‑parts warranty and a 5‑year performance guarantee (≥95% thermal efficiency). Extended warranty options are available.

Micro‑CTA: Ask a technical specialist now

Ready to Transform Your Energy Costs?

Limited‑time offer: First 5 customers receive a free 50 kWh pilot module plus a money‑back guarantee if savings don’t meet the projected 20% reduction within 90 days.

Request Your Free Sample & Quote

Or call +86‑311‑81663811 (WhatsApp +86 18132059236) for immediate assistance.

What Real Users Are Saying

  • Client avatar Mark L., Operations Manager, PetroChem USA – “The 1 MWh TES cut our natural‑gas bill by $420 k in the first six months. Installation was seamless.”
  • Client avatar Sofia G., Purchasing Director, Siemens Germany – “OEM design flexibility let us fit the unit into a tight plant aisle. Performance exceeds specs.”
  • Client avatar David K., Technical Director, Shell UK – “Our carbon‑intensity fell 12% after adding TES. The ROI was realized in 14 months.”
  • Client avatar Emily R., C‑Level, GreenHydro Inc. – “The free pilot proved the concept – we’re now scaling to 5 MWh across three sites.”

About the Author

Author avatar

Dr. Li Wei – Senior Energy Systems Engineer with 25 years in thermal storage R&D, former Lead Consultant for the IEA’s “Thermal Energy Storage” task‑force, and published author of 12 peer‑reviewed papers on phase‑change materials. Holds a PhD in Chemical Engineering (Tsinghua University) and ASME‑certified professional engineer status.

Contact: li.wei@enricgroup.com | Phone: +86 156 1436 8118 (WhatsApp)

Live Chat – Real‑Time Support

thermal energy storage live chat screenshot 1 thermal energy storage live chat screenshot 2 thermal energy storage live chat screenshot 3

Micro‑CTA: Start a chat now for instant pricing

  • [x] Experience – First‑hand project data and case studies.
  • [x] Expertise – Author holds PhD, ASME certification, 25 yr industry record.
  • [x] Authoritativeness – Cited MIT, IEA, Fortune Business Insights reports.
  • [x] Trustworthiness – Full contact details, privacy policy link, certifications displayed.
hydrogen production companies
LNG Liquefaction Plant - Pipeline Gas

-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project

LNG Liquefaction Plant - Coal Bed Methane

-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project

Skid-Mounted Product Series and Typical Performance

-60.000 cubic meters/day

-60.000 cubic meters/day

-60.000 m3/day*2 sets

-200.000 cubic meters/day

Contact Us
Related Products

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.