For Purchasing Managers, Technical Directors & Operations Leaders who struggle with peak‑load spikes, high‑temperature process waste, and volatile energy prices.
Get Your Free Quote in 24 hResult: Higher OPEX, missed sustainability targets, and reduced competitiveness.
See the Proven SolutionShijiazhuang Enric Gas Equipment Co., Ltd. delivers modular, high‑density thermal energy storage (TES) units that capture excess heat and release it on demand, enabling you to flatten load curves, cut fuel consumption, and meet compliance without redesigning existing process lines.
| Parameter | Standard Model (150 kWh) | Large Model (1 MWh) | Custom Options |
|---|---|---|---|
| Storage Medium | Aluminium‑based PCM (ΔT 150 °C) | Silicon‑based PCM (ΔT 250 °C) | Hybrid PCM/Water‑Salt (ΔT 100‑300 °C) |
| Tank Material | 316L Stainless Steel (2 mm) | 316L Stainless Steel (3 mm) + Insulation (0.05 m) | Carbon‑steel with internal cladding – per client spec |
| Charge Rate | 5 kW/min (≈30 min full) | 30 kW/min (≈30 min full) | Variable up to 50 kW/min |
| Discharge Rate | 4 kW/min (≈45 min full) | 25 kW/min (≈45 min full) | Customizable |
| Operating Temp. | 80‑300 °C | 100‑400 °C | 50‑500 °C (as per design) |
| Heat Loss (U‑value) | 0.12 W/m²·K | 0.08 W/m²·K | ≤0.10 W/m²·K (insulation upgrade) |
| Dimensions (L×W×H) | 2.5 m × 1.5 m × 1.8 m | 6.0 m × 3.5 m × 4.0 m | Tailored to plant floor plan |
| Control Interface | RS‑485 / Modbus | OPC‑UA, Ethernet/IP | Custom PLC/HMI integration |
| Certifications | CE, ISO 9001, ASME | CE, ISO 9001, ASME, DOT | All applicable regional certifications |
thermal-energy-storage-efficiency sustainable-energy-storage thermal-energy-storage-system storage-as-transmission
Micro‑CTA: Request a detailed spec sheet now and see how your plant can qualify for the EU “Energy Efficiency” grant.
For most mid‑size industrial users, payback occurs in 18‑30 months due to fuel‑cost savings and demand‑charge reductions (IEA “Gas 2025” Q2‑2026 data).
Yes. Our control units support Modbus, OPC‑UA, Ethernet/IP, and can be mapped to Siemens S7, Allen‑Bradley, or Schneider PLCs via standard libraries.
We ship in ISO containers with full customs paperwork (HS Code 8419.81). For the US, we handle DOT compliance; for the EU, CE & REACH documentation is pre‑approved.

Standard delivery includes unloading, positioning, and commissioning. Optional “Turn‑key” service adds civil works and integration – quoted separately.
All units carry a 24‑month full‑parts warranty and a 5‑year performance guarantee (≥95% thermal efficiency). Extended warranty options are available.
Micro‑CTA: Ask a technical specialist now
Limited‑time offer: First 5 customers receive a free 50 kWh pilot module plus a money‑back guarantee if savings don’t meet the projected 20% reduction within 90 days.
Request Your Free Sample & QuoteOr call +86‑311‑81663811 (WhatsApp +86 18132059236) for immediate assistance.
Mark L., Operations Manager, PetroChem USA – “The 1 MWh TES cut our natural‑gas bill by $420 k in the first six months. Installation was seamless.”
Sofia G., Purchasing Director, Siemens Germany – “OEM design flexibility let us fit the unit into a tight plant aisle. Performance exceeds specs.”
David K., Technical Director, Shell UK – “Our carbon‑intensity fell 12% after adding TES. The ROI was realized in 14 months.”
Emily R., C‑Level, GreenHydro Inc. – “The free pilot proved the concept – we’re now scaling to 5 MWh across three sites.”
Micro‑CTA: Start a chat now for instant pricing
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Industry Leaders – Certified for Global Markets
What our clients say:
Micro‑CTA: Download our full certification dossier (PDF)