For Purchasing Managers, Technical Directors, and Operations Leaders who need reliable, low‑cost power backup and load‑leveling.
| Parameter | Value | Unit | Standard / Cert. |
|---|---|---|---|
| Energy Density | 250 | Wh/kg | IEC 62282‑3 |
| Round‑Trip Efficiency | 94 | % | ISO 9001 |
| Operating Temperature | ‑20 ~ +60 | °C | CE, FCC |
| Charge Time (0‑100 %) | 5 | min | ASME, DOT |
| Lifecycle (Full Cycles) | 20 000 | cycles | VDE, GS |
| Safety Rating | Class II | – | ISO 14001, RoHS |
Chemical energy storage (CES) stores energy in reversible chemical reactions—often using redox‑active fluids or solid‑state chemistries—rather than in electrochemical cells. Compared with lithium‑ion batteries, CES typically offers higher volumetric density, lower fire risk, and a longer cycle life (>20 000 cycles). See the IEA “Gas 2025” report for a detailed comparison.
Yes. Our modular architecture lets you select from 0.5 MW up to 30 MW per module. OEM/ODM design services are available, and the engineering team can integrate PLC, SCADA, or IEC‑61850 interfaces per your plant standards.
We ship via 40‑ft high‑cube containers from Shijiazhuang. FOB price includes insurance; DDP is offered for EU and NA markets. Typical lead time is 30‑45 days after PO confirmation.

We provide 24/7 remote monitoring, a 5‑year full‑service warranty, and on‑site technician visits within 48 hours in the US, EU, and Asia‑Pacific. Spare parts are stocked in regional depots.
All units meet CE, FCC, GS, and ISO 45001 standards. We also hold ASME, DOT, and regional certifications (e.g., Korea KS, Russia GOST). Documentation is provided on request.
Order before 31 July 2026 and receive a risk‑free demonstration unit shipped to your site.
Claim My Free SampleOr call +86‑311‑81663811 / WhatsApp +86‑18132059236 (Europe) / +86‑13831019831 (North America)
John Patel, Procurement Lead, GE Power – “The instant discharge saved us from a costly production halt. ROI was realized in 18 months.”
Anna Müller, Operations Manager, BASF – “Modular scaling meant we could add 10 MWh in a single weekend without any civil engineering work.”
Luis Fernández, Technical Director, Petrobras – “Compliance documentation (CE, ASME, ISO) arrived ahead of schedule, simplifying our local approval process.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
what-are-energy-storage-systems uses-of-hydrogen-energy thermal-energy-storage-tank uk-energy-storage-market
Request a Compliance Package