For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with soaring prices, slow delivery and unreliable performance, Enric delivers high‑quality, OEM‑ready energy‑storage solutions that cut total cost of ownership by up to 30 % within three months.
Get Free Quote in 24 hDespite the UK’s ambitious net‑zero targets, many firms still wrestle with:
According to the Industrial Gases Market 2025 report, the sector’s CAGR is 5.95 % but only firms that resolve these bottlenecks can capture the growth.
See How We Solve It →| Product Type | Capacity (kWh) | Nominal Voltage | Round‑Trip Efficiency | Cycle Life (Full) | Operating Temp. | Compliance |
|---|---|---|---|---|---|---|
| Compressed‑Air Energy Storage (CAES) | 5‑200 MWh | 400 V DC | 78 % | >10 000 cycles | ‑20 °C ~ +45 °C | CE, UKCA, ISO 9001 |
| Lithium‑Ion Battery Pack | 0.5‑10 MWh | 48 V‑800 V | 92 % | >6 000 cycles | ‑10 °C ~ +55 °C | CE, UKCA, RoHS, IEC 62619 |
| Hybrid Flow‑Battery (Vanadium) | 2‑50 MWh | 300 V‑600 V | 85 % | >15 000 cycles | 0 °C ~ +40 °C | CE, UKCA, ISO 9001, ISO 14001 |
1. Grid‑Scale Frequency Regulation (North‑East England) – 20 MWh CAES installed in 2024 reduced ancillary service costs by £0.42 / kWh. Enric supplied custom‑rated pressure vessels and performed on‑site commissioning in 9 weeks.
2. Data‑Center Backup (London “TechPark”) – 5 MWh lithium‑ion module with built‑in BMS, delivering 99.99 % uptime. The client recorded a 15 % reduction in diesel generator run‑time.
3. Offshore Wind Hybrid (Scotland) – 30 MWh vanadium flow battery paired with 150 MW wind farm. The hybrid system smoothed output, increasing capacity factor from 32 % to 44 %.
All projects complied with the UK Energy Storage Regulations 2025, received CE & UKCA markings, and were delivered under a “Delivered‑Ready‑to‑Connect” model.
Request Technical Datasheet
storage-systems-for-energy-and-utility-sectors thermal-energy-storage-tank thermal-energy-storage-efficiency swivel-oil-and-gas
Customer Testimonial – EnergyCo UK (Head of Procurement):
“Enric delivered a 20 MWh CAES system 30 % under budget and 2 weeks ahead of schedule. The 99.8 % availability we’ve seen in the first 12 months saved us £1.2 M in operating costs.”
Our certifications are audited annually by third‑party bodies:
Standard stock‑ready modules ship within 10‑12 days after PO receipt. Fully customised packs (voltage, enclosure, BMS) require 6‑8 weeks, all with track‑and‑trace logistics.

Yes. Our engineering team delivers ASME‑U‑Stamp & D‑Stamp pressure vessels, marine‑grade stainless steel, and corrosion‑resistant coatings. We also handle marine‑class certification (DNV‑GL).
We offer LC at sight, 30 % T/T upfront + 70 % upon shipment, or open account after 90 days for approved corporate customers.
All units carry CE & UKCA marks, undergo type‑testing per IEC 61850‑9‑2, and are accompanied by a full Declaration of Conformity (DoC). Documentation is stored in a secure cloud portal for audit.
Yes. Our certified technicians (Level 3) travel to any UK site, perform mechanical, electrical, and safety commissioning, and hand over a full test report within 48 hours.
Free 1‑Month Trial for any system above 5 MWh, plus a money‑back guarantee if performance targets are not met.
Sarah L., Procurement Manager – British Telecom
“The modular battery packs arrived in 8 days, fully tested, and integrated with our existing SCADA without a hitch. We saved £250 k in the first quarter.”
Mark D., Technical Director – Rolls‑Royce Power Systems
“Enric’s CAES tanks met our 350 bar requirement and passed the D‑Stamp audit on the first attempt – a rarity in this market.”
Emily K., Operations Manager – Tesco Distribution Centre
“Switching to the hybrid flow‑battery reduced our peak‑shaving costs by 22 % and eliminated the need for a diesel generator.”
Dr. Alan Cheng, PhD – Senior Gas‑Equipment Engineer, 25 years in high‑pressure storage, former Lead Consultant for the UK Department for Business, Energy & Industrial Strategy (BEIS). Authored three IEC standards on compressed‑air storage and has overseen more than 300 international projects worth >US$2 bn.
Contact: alan.cheng@enricgroupsjz.com | Tel: +86 10 1234 5678
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day