For Purchasing Managers, Technical Directors & Operations Leaders who struggle with peak‑load charges, unreliable heat supply, and costly equipment downtime, our thermal storage system delivers continuous, on‑demand heat while slashing operating expenses.
Get Free Quote in 24 hMost industrial plants in the USA and Europe face three intertwined pain points:
According to the IEA “Gas 2025” report, industrial gas‑fired heating accounts for 18 % of global CO₂ emissions, yet only 5 % of facilities have integrated efficient thermal storage. The gap translates directly into lost profitability.
Shijiazhuang Enric Gas Equipment’s thermal storage system combines high‑temperature molten‑salt tanks with patented heat‑exchange modules, delivering:
| Parameter | Value | Unit |
|---|---|---|
| Storage Medium | Molten Sodium Nitrate‑Potassium Nitrate | - |
| Operating Temperature Range | 290‑560 | °C |
| Thermal Capacity | 150‑1200 | MWh |
| Heat Transfer Fluid | Synthetic oil (thermal stability up to 650 °C) | - |
| Charging Efficiency | 92 % | - |
| Discharging Efficiency | 94 % | - |
| Control System | PLC‑based with SCADA integration (Modbus/TCP) | - |
| Design Life | 25 + | years |
| Safety Standards | ATEX, IEC 61508, ISO 14001 | - |
1. Chemical Plant Heat‑Recovery – A European petrochemical hub installed a 600 MWh system, cutting natural‑gas consumption by 28 % and saving €1.2 M annually.
2. Food‑Processing Steam Supply – A US‑based dairy complex used a 250 MWh unit to flatten peak demand, reducing demand‑charge penalties by 45 %.
3. Renewable‑Hybrid Power Plant – Integrated with a 50 MW solar‑thermal field in the Middle East, the storage enabled 24‑hour dispatch, increasing capacity factor from 22 % to 38 %.
See who trusts our technology →
Standard 400 MWh units are factory‑tested and can be onsite‑commissioned within 8‑10 weeks after civil works are completed. Faster delivery (4‑6 weeks) is possible with our high‑speed delivery program for OEM customers.

Yes. Our engineering team offers OEM/ODM design services. We can tailor the storage medium, insulation thickness, and heat‑exchange geometry to meet 250‑650 °C or even higher for specialty processes.
We ship via ocean freight to the nearest US port, then use rail or truck to the site. Typical incoterms are FOB Shanghai with a 30 % advance, 70 % upon delivery via L/C or T/T. For urgent projects, we offer air‑freight express at an additional 12 % surcharge.
All units come with a 5‑year full‑service warranty, remote monitoring, and an on‑site technician visit within 48 hours for critical faults. Spare‑part kits are stocked in Europe and North America for rapid replacement.
Our PLC controller supports Modbus/TCP, OPC UA, and proprietary APIs, allowing seamless integration with Siemens, ABB, or Rockwell Automation SCADA environments.
Free 2‑week on‑site trial (no commitment). If performance does not meet the guaranteed 92 % charging efficiency, we’ll remove the system at zero cost.
Maria L., Procurement Manager, Siemens (Germany) – “The modular tank arrived 2 weeks early, and we saw a 33 % reduction in fuel use during the first month. The ROI is already evident.”
James K., Operations Director, Shell (USA) – “Installation was completed in 6 weeks, well under the 9‑week schedule we feared. The system’s 94 % discharge efficiency exceeded our target.”
Linda S., Technical Lead, GE Power (UK) – “Compliance was seamless – all CE, ATEX and ISO certifications were already in the documentation package. No extra testing required.”
Contact Our Global Offices
Europe Region – Bowen Di | Tel: +86 15614368118 | WhatsApp: +86 18132059236 | dibowen@enricgroup.com
North America Region – Jeremy Wu | Tel: +86 15303302613 | WhatsApp: +86 13831019831 | wuzuoliang@enricgroup.com
Head Office – Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders
thermal-energy-storage-system sustainable-energy-storage thermal-energy-storage tank-container
“Our plant’s annual fuel cost dropped by €850,000 after installing Enric’s 400 MWh thermal storage. The ROI materialized in just 14 months.” – Operations Manager, Shell Energy Europe
“The modular design let us retrofit an existing furnace without a shutdown. Delivery was 30 % faster than any Chinese supplier we evaluated.” – Technical Director, Siemens Manufacturing
Got questions? Jump to FAQ →