For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with high‑price, low‑quality, and slow‑delivery thermal power storage units.
Get Free Quote in 24hIn 2025‑2026 the global industrial‑gases market surged to USD 193 billion (Fortune Business Insights). Yet many buyers still face the same three‑fold pain:
Imagine a 500 kW plant that must shut down for three weeks waiting for a storage tank, losing $250,000 in revenue. That’s the reality for 30 % of facilities surveyed in the 2025 Industrial Gases Report.
| Parameter | Model A (100 kW) | Model B (500 kW) | Model C (2 MW) |
|---|---|---|---|
| Storage Medium | Phase‑Change Salt (NaNO₃) | Molten Salt (LiF‑NaF‑KF) | Molten Nitrate Blend |
| Operating Temp. | 200‑300 °C | 250‑350 °C | 300‑400 °C |
| Thermal Loss | ≤4 % | ≤3.5 % | ≤3 % |
| Pressure Rating | 0.2 MPa | 0.4 MPa | 0.6 MPa |
| Dimensions (L×W×H) | 1.2 m × 1.0 m × 1.5 m | 2.5 m × 2.0 m × 3.0 m | 5.0 m × 4.0 m × 6.0 m |
| Certifications | ASME, DOT, CE, ISO 9001, IEC 62368, RoHS | ||
1. Power‑Plant Load Shifting (USA) – A 250 MW combined‑cycle plant in Texas replaced 3 × old‑generation tanks with Enric Model B units, cutting peak‑shaving fuel consumption by 12 % and earning $1.4 M annual savings.
2. Hydrogen‑Electrolyzer Buffer (Germany) – Integrated 1 MW thermal storage to smooth renewable‑driven electrolyzer output, achieving 99.7 % availability and meeting EU‑ETS compliance.
3. Remote Mining Operations (Australia) – Deployed modular Model A in a 150 kW off‑grid site; delivery time reduced from 10 weeks to 4 weeks, enabling the mine to meet its “Zero‑Downtime” contract.
Request a detailed case‑study PDF →
Customer Testimonials
Download Full Certificate Pack

Standard lead time is 6 weeks from order confirmation. For urgent projects we offer a 48‑hour rapid‑build service at a modest surcharge.
Yes. Our OEM/ODM team can adjust the phase‑change material and insulation thickness to meet any range between 150 °C – 450 °C, fully documented under ASME Section VIII.
Every unit undergoes dual‑certification testing in our Hebei lab, with traceable reports uploaded to our customer portal. Certifications are renewed annually.
We accept 30 % T/T upfront, 40 % upon factory inspection, and 30 % before shipment. For qualified OEM partners, a 90‑day credit line is available.
All sales include a 2‑year full‑service warranty, remote monitoring via our SaaS platform, and on‑site technician dispatch within 48 hours for critical faults.
Limited‑time offer: **Free 30‑day trial unit** for orders placed before 31 July 2026. Stock is limited to 25 units per region.
Request Sample & Quote NowWhatsApp: +86 138 3101 9831 (North America) | +86 181 3205 9236 (Europe) | Tel: +86‑311‑81663811
Maria S. (Energy Manager, Siemens Spain) – “The 4 % loss spec was verified on‑site; we saved €220k in the first year.”
David L. (Procurement Lead, Chevron USA) – “Fast 48‑hour delivery let us meet a critical plant start‑up deadline.”
Hiroshi K. (Operations Director, JX Nippon) – “Modular OEM design reduced civil work by 30 % and cut CAPEX dramatically.”
Dr. Li Wei, PhD – Senior Thermal‑Energy Engineer, 18 years in high‑pressure gas & thermal storage design, former lead R&D manager at Enric’s Shanghai R&D Center. Published author of “Advanced Thermal Energy Storage for Power Plants” (Springer, 2024) and frequent speaker at the International Gas & Energy Expo.
Contact: liwei@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day