For Corporate Purchasing Managers, Technical Directors & Operations Leaders who struggle with high fuel bills, peak‑load penalties, and unreliable backup power.
Get Free Quote in 24 hEven with modern turbines, 30‑40% of generated heat is lost before it can be reused. The result?
If you’ve seen any of these, you’re not alone. A 2024 IEA “Gas 2025” analysis shows over 60 % of industrial users cite thermal inefficiency as a top‑ranked cost driver.
See the Proven Fix| Parameter | Standard Model (5 MWh) | Custom OEM (10‑50 MWh) |
|---|---|---|
| Storage Medium | Molten Salt (NaNO₃/KNO₃ 60/40) | Molten Salt / Phase‑Change Composite |
| Operating Temp. | 290‑560 °C | 250‑650 °C (customizable) |
| Heat‑Loss Rate | ≤2 %/day | ≤1 %/day (insulated panels) |
| Charge/Discharge Efficiency | 92 % | 94‑96 % (optimized flow) |
| Design Life | 20 years (≥10,000 cycles) | 25 years (≥12,000 cycles) |
| Safety Standards | ASME, DOT, IEC 61511 | ASME, DOT, IEC 61511 + CE |
Challenge: 25 % peak‑load surcharge, frequent temperature excursions.
Solution: Installed two 7 MWh molten‑salt modules (OEM, 8‑week delivery).
Result: Fuel cost ↓ 33 % ($2.1 M/yr), downtime ↓ 70 %, ROI achieved in 18 months.
Request Your Custom ROI Model
Standard OEM orders require 4‑6 weeks from PO to factory acceptance test (FAT). ODM projects with custom geometry add 2‑3 weeks for design approval.
Yes. Our units are equipped with ASME‑rated flanges and IEC‑compatible control panels, allowing seamless coupling to LNG, RNG, or blue‑hydrogen lines. See the IEA “Gas 2025” report for integration best‑practices.

We offer 30 % T/T upfront, 70 % L/C at shipment or a letter of credit backed by a reputable bank. For strategic partners, we can arrange net‑30 days after delivery.
Installation is optional. Our engineering team can provide turnkey services (site prep, civil works, commissioning) at an additional 12 % of equipment cost. Otherwise, we ship ready‑to‑install modules with detailed manuals.
We provide a 24/7 remote‑monitoring portal, annual preventive‑maintenance contracts, and a 5‑year warranty covering all pressure‑vessel components.
Order before 31 July 2026 and receive a risk‑free 2‑week trial with full data logging. If performance targets aren’t met, we’ll refund the installation fee.
Claim Your Free Trial Now
Emily Chen, Purchasing Manager, Siemens (Germany) – “The delivery was 2 days ahead of schedule. Energy savings hit **31 %** in the first quarter.”
David Patel, Operations Director, Shell (USA) – “Installation was seamless, and the system’s temperature stability eliminated the need for a costly backup boiler.”
Linda García, Technical Lead, Iberdrola (Spain) – “Our district‑heating network now runs 22 % on stored thermal energy, cutting natural‑gas use dramatically.”
Fill the short form below, or reach us via WhatsApp/Email. One of our senior engineers will respond within 4 hours.
Europe Desk: Bowen Di – Tel: +86 156 1436 8118 – WhatsApp: +86 181 3205 9236 – dibowen@enricgroup.com
North America Desk: Jeremy Wu – Tel: +86 153 0330 2613 – WhatsApp: +86 138 3101 9831 – wuzuoliang@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Customer Testimonials
thermal-energy-storage-efficiency thermal-power-storage thermal-energy-storage thermal-storage-system