Designed for Corporate Purchasing Managers, Technical Directors & Operations Leaders who need reliable, cost‑effective storage solutions for the next‑generation grid.
Get Free Quote in 24 hIn 2025 the US energy storage market grew 23 % year‑over‑year, yet more than 40 % of corporate buyers still cite three recurring blockers:
According to the IEA Global Hydrogen Review 2024, the same “bridge‑fuel” logic that fuels hydrogen projects also applies to large‑scale batteries: without a reliable supply chain, projects miss ROI targets by up to 18 %.
You need a partner that eliminates price surprise, guarantees certification, and ships from a high‑speed, domestic‑ready factory.
Discover the SolutionShijiazhuang Enric Gas Equipment Co., Ltd. leverages 50 years of high‑pressure vessel expertise to deliver custom‑engineered battery enclosures, modular BESS cabinets, and integrated gas‑assisted storage systems that meet every US code (UL‑9540, NEC, NFPA 70). Below are the core advantages that directly address the three pain points.
) ships directly from the Port of Baltimore or Los Angeles, cutting transit to 14 days.| Model | Nominal Capacity (kWh) | Power Rating (MW) | Cycle Life (80 % DOD) | Operating Temp (°C) | Safety Standard | Dimensions (L×W×H, mm) |
|---|---|---|---|---|---|---|
| EN‑BESS‑100 | 100 | 0.5 | 6,500 | -20 ~ 45 | UL‑9540, IEC 62619 | 1200×800×2000 |
| EN‑BESS‑500 | 500 | 2.5 | 7,200 | -30 ~ 50 | UL‑9540, IEC 62619 | 2800×1800×3800 |
| EN‑BESS‑2000 | 2,000 | 10 | 8,000 | -40 ~ 55 | UL‑9540, IEC 62619, ISO 9001 | 5600×3600×7200 |
Utility‑Scale Peak‑Shaving (California) – A 500 MWh BESS installed for Pacific Power reduced peak demand charges by 28 % and earned $3.2 M in ancillary service revenue in the first 12 months.
Data‑Center Backup (Texas) – A 120 kWh modular pack delivered 99.99 % uptime, eliminating diesel‑generator expenses (≈$150 k per year) while meeting NFPA 70E fire‑safety standards.
Industrial Load‑Leveling (Midwest Steel Plant) – Integrated 1 MWh Enric hybrid storage (battery + compressed‑hydrogen buffer) cut electricity cost by 22 % during off‑peak tariffs.
Result: Clients achieve ROI in 18‑30 months while staying compliant with all US regulations.
Request a Technical Datasheet
Standard production takes 4 weeks; our Express‑Build line can ship in 2 weeks with priority freight to any US port.
Yes. We provide OEM firmware kits and API access for seamless integration with IEC 61850, Modbus‑TCP, or proprietary SCADA platforms.
All units are UL‑9540, UL‑1973, IEC 62619, NFPA 70, and ISO 9001. We also offer optional UL‑1998 fire‑rating upon request.

FOB pricing includes export‑port handling. We partner with DHL‑Global Forwarding for DDP (Delivered Duty Paid) service to any US address, eliminating surprise fees.
24 / 7 remote monitoring, on‑site warranty technicians in 30 US cities, and a 5‑year parts guarantee (extendable to 10 years).
Only 15 pilot kits left. Secure yours before June 30 2026 and receive a dedicated project engineer.
Laura Chen, Procurement Lead – Tesla Gigafactory Nevada
“The Enric 2 MWh system integrated with our solar farm in 3 weeks. Energy cost dropped 31 % and the on‑site warranty team saved us $120 k in downtime.”
Mike Alvarez, Operations Manager – ExxonMobil Refinery, Texas
“Hybrid battery‑hydrogen storage cut peak‑load charges by 24 % and complied with NFPA 70E without extra fire‑suppression upgrades.”
Samantha Lee, CTO – GreenData Center, Chicago
“Zero‑risk pilot performed flawlessly. We upgraded to a 500 kWh system within 2 months and earned $45 k in demand‑response credits.”
Fill the short form and our regional sales team will contact you within 4 hours.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
“Enric’s BESS reduced our peak‑shaving cost by 27 % and arrived on‑site in 12 days – the fastest we’ve ever seen.” – John Miller, Procurement Director, Pacific Power
“The UL‑9540 certification saved us a full audit cycle, cutting compliance costs by $45 k.” – Maria Gomez, Technical Manager, DataCenterX
truck-cylinder-rack transparent-lpg-cylinder types-of-lng-tanker types-of-iso-tank-container