For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with soaring hydrogen costs, slow‑delivery tanks, and compliance headaches.
Get Free Quote in 24 hEven in 2026, hydrogen in refineries remains a bottleneck for more than 70 % of global oil‑processing sites. The most common pain points you hear about on the shop floor are:
According to the Global Hydrogen Review 2025, worldwide refinery hydrogen demand will hit 48 Mt by 2030, yet only 7 % will be low‑emission. The gap translates directly into higher OPEX for every refinery manager.
If you keep buying off‑grid, you will keep paying extra.
See how we solve it →Our hydrogen in refineries platform combines OEM‑grade compressors, on‑site electrolyzers, and ISO‑certified storage vessels into a single, fully‑integrated package. Below are the core advantages that matter to a purchasing manager:
| Parameter | Value | Unit | Standard / Cert. |
|---|---|---|---|
| Production Capacity | 1 000‑100 000 | Nm³ h⁻¹ | ISO 9001, ASME |
| Purity (after PSA) | 99.999 | % | ISO 14687 |
| Pressure Rating | 200‑450 | bar | DOT‑6A, CE |
| Energy Consumption | 4.5‑5.2 | kWh/Nm³ | ISO 50001 |
| Operating Temperature | ‑20 ~ +50 | °C | CE, FCC |
| Safety Relief Valve | Yes | ‑ | ASME‑BPVC |
Below are three typical refinery modules where our hydrogen system delivers measurable ROI:
Our clients also benefit from integrated hydrogen‑ready pipelines that reuse existing natural‑gas lines after a simple retro‑fit, cutting infrastructure spend by up to 40 % (see IEA 2024 Review).
Standard production is 3 weeks; expedited 48‑hour on‑site assembly is available for an additional 12 % of the contract value.
Yes. Adding a secondary cryogenic adsorption stage brings purity to 99.9999 % at a marginal 0.4 % increase in energy consumption.
A simple 3‑inch stainless‑steel retrofit kit, compliant with ASME‑BPVC Section III, enables up to 30 % hydrogen blending without pressure loss.
Standard 30 % upfront, 40 % on‑site start‑up, 30 % after performance acceptance. Letter of Credit (L/C) and open‑account are also supported.
A 24/7 global service hotline, on‑site maintenance contracts, and a 5‑year warranty on critical components are included in every contract.
Still have questions? Contact us now.

Free 30‑day trial, money‑back guarantee, and zero‑risk sample shipment. Secure your allocation before the next price surge (expected Q4 2026).
Request Sample & QuoteOr call +86‑311‑81663811 / WhatsApp +86‑18132059236 (Europe) / +86‑13831019831 (NA)
“The on‑site hydrogen generation cut our LNG‑derived hydrogen purchase by 40 % and saved $1.2 M annually.”
— Carlos Mendoza, Operations Manager, Petronas (Mexico)
“Installation was finished in 5 days, well under the 2‑week target. No downtime, zero safety incidents.”
— Hannah Lee, Technical Director, TotalEnergies (France)
“The compliance package (CE, ISO 9001, ASME) removed the need for a third‑party audit, saving us 3 weeks of paperwork.”
— James O’Connor, Purchasing Manager, ExxonMobil (USA)
Shijiazhuang Enric Gas Equipment Co., Ltd. – No. 169 Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
Europe Contact: Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America Contact: Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
General Inquiries: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Contact Form
All information complies with local regulations, CE, ISO, ASME, DOT, and industry safety standards.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
“Enric’s modular hydrogen plant cut our HDS catalyst cost by 18 % and delivered on‑time despite a global container shortage.” – Dr. Lena Kovács, Technical Director, Shell Energy Europe
“The 30‑day free sample proved 99.999 % purity, letting us approve the full‑scale order within a week.” – Mark Thompson, Purchasing Manager, Chevron USA
tank-container transport-hydrogen-as-ammonia use-of-green-hydrogen use-of-hydrogen-gas