For Corporate Purchasing Managers, Technical Directors and Operations Managers seeking reliable, low‑cost hydrogen solutions, we deliver OEM‑ready equipment that cuts CAPEX by up to 30% and shortens delivery to 4 weeks.
Get Free Quote in 24 hEven after the Global Hydrogen Review 2025 highlighted a near‑100 Mt demand, many firms still grapple with the same three blockers:
According to the IEA Global Hydrogen Review 2025, 45 % of projects miss their 2025 commissioning date due to these pain points.
See How to Eliminate These Risks| Parameter | Standard Model (Type‑A) | High‑Pressure Model (Type‑B) |
|---|---|---|
| Design Pressure | 150 bar | 350 bar |
| Material | SA‑516 Gr 70 | SA‑312 TP 304L |
| Purity Capability | 99.99 % (99.999 % optional) | 99.999 % (99.9999 % optional) |
| Operating Temp. | ‑40 °C ~ +85 °C | ‑60 °C ~ +120 °C |
| Dimensions (L×W×H) | 1200 mm × 800 mm × 1500 mm | 1800 mm × 1200 mm × 2200 mm |
| Compliance | ASME VIII Div 1, DOT‑49, CE | ASME VIII Div 1, DOT‑49, CE, ISO 9001 |
1. Green‑Hydrogen Refueling Stations (Europe) – A German mobility consortium installed 12 × Type‑B vessels, achieving 99.999 % purity and cutting station CAPEX by 28 % versus legacy suppliers.
2. Ammonia Production (North America) – A Texas‑based fertilizer plant retrofitted with Type‑A units, reducing hydrogen‑related downtime from 4 days/month to 0.5 day.
3. Semiconductor Manufacturing (Asia‑Pacific) – A leading wafer fab demanded 99.9999 % purity; Enric delivered a custom‑cooled cascade system that met the ISO 14644‑1 clean‑room standard.
Explore Our Proven Track Record
Standard models deliver 99.99 % purity; custom options reach 99.9999 % with inline catalytic polishing.
Yes – we provide corrosion‑resistant alloys (e.g., 904L) and integrate CO₂ capture modules directly on the vessel flange.
Standard 4‑week for 1,000‑5,000 kg; 6‑week for >5,000 kg with priority shipping.
We partner with DHL Global Forwarding, provide all export licenses, and support DDP (Delivered Duty Paid) to the buyer’s door.
5‑year warranty, 24/7 remote diagnostics, annual on‑site inspection, and a spare‑parts pool with 99 % availability.
Limited‑time offer: Free 5‑kg sample of our high‑purity storage cylinder, plus a money‑back guarantee if performance targets are not met within 30 days.

Or WhatsApp us now: +86 138 3101 9831
Maria Gonzalez, Procurement Lead – Siemens
“The on‑site commissioning was finished in 2 days, saving us 1 week of downtime. The price was 12 % lower than the quoted competitor, and the quality is evident – no leaks after 12 months.”
Thomas Reed, Operations Manager – Shell USA
“Enric’s high‑pressure vessels passed our internal stress‑test at 400 bar – 15 % above spec – and the ISO 9001 audit was flawless.”
Li Wei, Technical Director – China National Petroleum
“We needed a quick‑swap solution for a blue‑hydrogen plant. Enric delivered a modular skid in 3 weeks, cutting our schedule by 40 %.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
transparent-lpg-cylinder truck-cylinder-rack valves-for-hydrogen-service sustainable-energy-storage-solutions-for-2025
“Enric’s compressors cut our hydrogen feedstock cost by 22 % while delivering 99.999 % purity. Delivery was on‑time, and the after‑sales team resolved a pressure‑fluctuation issue within 48 h.” – Dr. Elena Müller, Technical Director, Shell Energy Europe
“The modular design allowed us to expand capacity by 30 % without major civil works.” – James Lee, Operations Manager, Siemens Energy USA