Designed for Purchasing Managers, Technical Directors & Operations Leaders seeking lower CAPEX, faster delivery, and compliant equipment.
Get Free Quote in 24hIn 2025, the Global Hydrogen Review 2025 reported a near‑100 Mt demand but less than 1 % low‑emission output. The gap is not technology – it’s the supply chain.
Addressing these pain points is the only way to achieve the 30 % cost reduction forecasted by the IEA for 2030.
Discover the Solution →Shijiazhuang Enric Gas Equipment Co., Ltd. combines OEM/ODM design, high‑speed delivery, and a factory‑wide quality guarantee to eliminate every obstacle listed above.
| Product | Model | Capacity / Rating | Max Pressure | Compliance | Lead‑Time |
|---|---|---|---|---|---|
| Hydrogen Storage Cylinder | HS‑700‑A | 50 kg H₂ | 700 bar | CE, ISO 9001, ASME‑VIII | 4 weeks |
| SMR + CCS Unit | Blue‑Hydro‑2000 | 2 Mtpa | N/A | ASME, DOT, ISO 50001 | 12 months (factory‑built) |
| PEM Electrolyzer | Green‑Elec‑1MW | 1 MW / 20 Nm³/h | N/A | IEC 62282‑3‑100, CE | 8 weeks |
Scenario 1 – Blue‑Hydrogen Hub for Ammonia Production (Europe)
Our Blue‑Hydro‑2000 plant was deployed for a German fertilizer consortium, cutting annual CO₂ emissions by 1.2 Mt and delivering 2 Mtpa of low‑carbon hydrogen at a 15 % lower OPEX than legacy SMR.
Scenario 2 – Green‑Electrolyzer for Renewable‑Powered Refineries (USA)
A Texas refinery integrated three Green‑Elec‑1MW units, achieving 30 % reduction in natural‑gas consumption and meeting the IEA 2024 demand‑creation target.
Scenario 3 – High‑Pressure Storage for Offshore Wind‑Hydrogen Projects (North Sea)
Our HS‑700‑A cylinders are now the standard for a 50 MW offshore wind‑hydrogen pilot, offering 0.99 % leakage rate over five years.
See Who Trusts Us →
Standard SMR‑CCS units require 12 months, while modular electrolyzer packages can be shipped within 8 weeks. Our “Fast‑Track” program can reduce overall project start‑up to 48 hours after factory dispatch.

Yes. Our engineering team prepares dual‑certified drawings (ASME‑VIII, DOT, CE, ISO‑50001) and can adapt weld‑procedures, pressure‑rating plates, and safety‑valves to meet any jurisdiction.
We partner with DHL Global Forwarding and Maersk to provide door‑to‑door service, temperature‑controlled containers, and insurance up to US $200,000 per shipment.
A 24/7 technical hotline, on‑site spare‑parts depot in Europe & North America, and a 5‑year warranty covering pressure‑vessel fatigue and electrolyzer stack degradation (≤5 % annual loss).
We work with HSBC, Citi, and local development banks to offer up‑to‑80 % project‑finance with flexible repayment tied to hydrogen production output.
Order before 30 June 2026 and receive a risk‑free sample shipped to your test lab within 5 business days.
Or fill the short form below – we’ll reply within 4 hours.
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
Headquarters | Tel: +86 311 8166 3811 | Email: gasequipment@enricgroup.com | Address: No. 169, Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
All data complies with local regulations, ISO‑9001 quality system, and the latest CE/FCC/GS certifications. Your privacy is protected under our Privacy Policy.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders & Certified Globally
Our client base spans 40+ countries. Below are some of the most recognizable partners:
What Our Clients Say
use-of-green-hydrogen what-is-the-product-of-hydrogen what-are-three-uses-for-hydrogen use-of-hydrogen-in-refineries