Where can I find hydrogen? If you’re a purchasing manager or technical director struggling with high prices, delayed shipments, or uncertain quality, Enric’s global network delivers certified, on‑time hydrogen at competitive rates.
Corporate buyers across the U.S. and Europe report three recurring pain points:
Imagine a plant shutdown because the contracted supplier failed to deliver 500 kg of low‑impurity hydrogen on schedule. The resulting downtime costs > $250,000 per hour for a typical petrochemical line (MIT Natural Gas Study, 2011).
| Parameter | Compressed (H₂) 30 MPa | Liquid (H₂) − 253 °C | On‑Site SMR |
|---|---|---|---|
| Purity (≥ 99.999 %) | 99.999 % | 99.999 % | 98.5 % (post‑CCUS) |
| Energy Density | 5.6 MJ kg⁻¹ | 8.5 MJ kg⁻¹ | 5.3 MJ kg⁻¹ |
| Maximum Pressure | 30 MPa (≈ 4350 psi) | — | 20 MPa |
| Container Type | Type 4 Composite Cylinder (450 L) | Cryogenic Dewar (500 L) | Stainless‑steel Reactor (10 t/d) |
| Safety Standards | ISO 10218, IEC 62279 | ISO 11119‑4 | ISO 16530, ASME B31.3 |
Enric operates a certified EU hub in Cologne (Germany) with CE, ISO 9001, and ATEX‑rated storage. All shipments are accompanied by a full Safety Data Sheet (SDS) and CE‑marked equipment.

Use the formula: TCO = (Purchase Price + Transport Cost + Storage Losses × Energy Price + Maintenance). Enric provides an online calculator that factors in 0.3 % monthly boil‑off for liquid H₂ and 0.02 % for compressed gas (see our brochure, p. 7).
Yes. We offer Type 4 composite cylinders with a stainless‑steel liner and an outer carbon‑fiber shell, certified to ISO 11119‑4 for chlorine‑rich processes.
We provide three Incoterms: FOB (direct port loading), CIF (insurance & freight), and DAP (door‑to‑door). Our dedicated fleet can move 10 t of compressed hydrogen from Shijiazhuang to Rotterdam within 48 h.
All production lines are audited against the EU Taxonomy for Sustainable Activities. We publish quarterly compliance reports and have achieved the “Green Hydrogen” label from the European Commission (2024).
Limited‑time offer: Free 5 kg sample of 99.999 % purity hydrogen + money‑back guarantee if delivery exceeds 48 h.
Call +86‑311‑81663811 | WhatsApp +86‑181‑3205‑9236 | Email gasequipment@enricgroup.com
Maria L., Procurement Manager – Siemens – “Enric’s portal cut our order‑to‑delivery cycle from 21 days to 7 days. The cost model is transparent, and the ISO 9001 audit reports are always up‑to‑date.”
James K., Operations Director – Shell Energy – “The on‑site SMR module delivered 10 t/d of low‑carbon hydrogen with 99 % reliability. Our plant emissions dropped 12 % in the first quarter.”
Liang H., Technical Lead – GE Power – “We needed 99.9999 % purity for turbine‑blade cooling. Enric’s custom‑built composite cylinders passed our QC tests on the first run.”
EEAT Checklist:
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Industry Leaders
“Enric reduced our hydrogen procurement cost by 18 % and delivered on‑time for three consecutive quarters.” – Procurement Lead, Siemens AG
water-electrolysis-for-hydrogen-production what-is-natural-gas-car what-happens-to-gas-particles-when-a-gas-is-compressed weld-cylinder
“The on‑site SMR module met ISO 9001 and ASME standards without any additional certification work on our side.” – Technical Director, Shell Energy Europe
All certifications are downloadable from our secure client portal (ISO 9001, CE, ASME, DOT, ISO 14001, ISO 45001).
Request Full Certification Pack