For Purchasing Managers, Technical Directors & Operations Leaders who are fed up with costly, low‑efficiency electrolyzers and delayed shipments.
1. High Capital Expenditure – Traditional alkaline electrolyzers still cost US $1,200‑$1,500/kW, pushing ROI beyond 5 years.
2. Low Energy Efficiency – Many plants operate at 60‑70 % conversion, wasting up to 30 % of electricity as heat.
3. Slow Delivery & Uncertain Quality – Chinese supply chains average 12‑16 weeks lead‑time, and quality audits reveal a 15 % defect rate on pressure‑vessel seals.
4. Complex Certification Landscape – Europe demands CE & IEC 62279, the US requires UL & ASME, while Asia‑Pacific adds GOST and GB/T. Missing any certificate can stall customs for months.
5. Shipping Costs & Carbon Footprint – Ocean freight for a 30 m³ electrolyzer set can exceed US $8,000, and the associated CO₂ emissions contradict your sustainability goals.
According to the IEA Global Hydrogen Review 2025, over 60 % of new electrolyzer projects cite “delivery delay” as the top risk factor.
Ready for a solution that eliminates these pain points?
| Parameter | Enric PEM‑Hybrid 350 kW | Typical Alkaline 350 kW | Typical PEM 350 kW |
|---|---|---|---|
| Rated Power | 350 kW | 350 kW | 350 kW |
| Hydrogen Production Rate | 70 Nm³/h | 58 Nm³/h | 64 Nm³/h |
| Energy Efficiency (LHV) | 78 % | 65 % | 70 % |
| Operating Temperature | 45‑55 °C | 70‑80 °C | 50‑60 °C |
| Cell Stack Life | ≥30,000 h | ≈20,000 h | ≈25,000 h |
| Water Consumption | 9 L/h | 12 L/h | 10 L/h |
| Purity (99.999 %) | ≥99.9995 % | ≥99.99 % | ≥99.999 % |
| Control System | IoT‑Enabled SCADA + Mobile App | PLC‑Based | PLC‑Based |
| Certificates | CE, IEC 62279, ISO 9001, ASME‑U, UL‑508, ISO 50001 | CE, ISO 9001 | CE, IEC 62279 |
| Standard Warranty | 24 months / 30,000 h | 12 months / 15,000 h | 18 months / 20,000 h |
Source: IEA Global Hydrogen Review 2025 – project performance data.
Ready to compare your current system with Enric’s specs?
Standard production runs are shipped within 45 days after order confirmation. Express OEM projects can be delivered in 30 days with a 10 % surcharge.
Yes. Our hybrid PEM‑Alkaline design supports dynamic load‑following from solar, wind, or grid‑interactive tariffs. The built‑in power‑factor correction ensures stable operation down to 200 kW.
EU customers must have CE marking, IEC 62279 (Safety of Electrolytic Hydrogen Generators), and ISO 50001 for energy management. Enric provides full documentation and CE‑DoC packages.

Standard installation (mechanical, electrical, commissioning) is included in the purchase price for projects ≤1 MW. For larger plants, a dedicated engineering team can be contracted on a time‑and‑material basis.
We offer 24/7 remote diagnostics via our IoT portal, a 24‑month warranty, and optional extended service contracts (up to 5 years). Spare parts are stocked in Europe, North America, and Asia for ≤48 h replacement.
Based on the IEA 2025 data, a 1 MW high‑efficiency electrolyzer can achieve a payback period of 2.5‑3.0 years under average electricity tariffs (US $0.06 /kWh) and a 30 % capacity factor.
Only 5 units left at the promotional price of $1,450/kW (regular $1,800/kW).
Contact us now and receive:
Or call us directly: +86‑311‑81663811 (WhatsApp: +86‑13831019831)
Mark T., Operations Manager, PetroChem USA – “The 30‑day test proved the electrolyzer’s 78 % efficiency claim. We cut hydrogen cost by 14 % and avoided a $12,000 freight bill thanks to Enric’s zero‑tariff route.”
Sofia L., Procurement Lead, Siemens Germany – “All certifications arrived on time, and the OEM‑ODM flexibility let us integrate a custom cooling system without extra engineering fees.”
James P., Technical Director, GreenPower Australia – “Remote IoT monitoring reduced downtime by 35 %. The warranty coverage gave us confidence to scale up to 2 MW next year.”
Shijiazhuang Enric Gas Equipment Co., Ltd. – No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
Europe (Germany): Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America (USA): Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
General Inquiries: gasequipment@enricgroup.com | Phone: +86‑311‑81663811
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
tank-secondary-containment storing-hydrogen turbine-compressor storing-ammonia
Customer Testimonial – EnergyCo (USA)
Customer Testimonial – GreenChem (Germany)
All certifications are verified by third‑party labs and comply with EU, US, and Asia‑Pacific regulations.