Tailored for Corporate Purchasing Managers and Technical Directors who demand high‑speed delivery, uncompromised quality, and transparent ROI on industrial gas equipment.
Get Free Quote in 24 hIn 2025 the global industrial gases market hit $115 bn, yet many manufacturers still grapple with the same three blockers:
Imagine a scenario where a 500 kW turbine compressor is required for a new hydrogen‑blending plant. The standard quote you receive shows a 12‑month delivery and a 15 % higher energy draw than projected. The result? Missed contracts, penalities, and a dented sustainability report.
Ready for a smarter alternative?
See the SolutionOur turbine compressors combine ASME‑certified pressure vessels, ISO 9001 quality management, and a proprietary High‑Speed Rotor™ that delivers up to 30 % higher specific power efficiency compared with legacy designs.
| Parameter | Model A‑500 | Model B‑750 | Model C‑1000 |
|---|---|---|---|
| Rated Power | 500 kW | 750 kW | 1 MW |
| Inlet Pressure | 1.2 MPa | 1.5 MPa | 1.8 MPa |
| Maximum Speed | 35,000 rpm | 38,000 rpm | 42,000 rpm |
| Efficiency (Isentropic) | 0.88 | 0.90 | 0.92 |
| Operating Temperature | ‑40 °C ~ +150 °C | ‑50 °C ~ +180 °C | ‑60 °C ~ +200 °C |
| Material | SA‑516‑70 (Carbon Steel) | SA‑387‑2 (Low‑Alloy) | Inconel 718 |
| Noise Level (dB(A)) | 68 dB | 65 dB | 62 dB |
| Standard Certifications | CE, ISO 9001, ASME, DOT, RoHS, FCC, GS, CB, VDE, SAA | ||
1. Hydrogen‑Blending Facility – Texas, USA
Enric’s Model B‑750 was installed in a 150 MW natural‑gas‑to‑hydrogen plant. The compressor reduced specific fuel consumption by 28 %, delivering a $1.2 M annual OPEX saving and enabling the client to meet IEA 2025 hydrogen targets.
2. LNG Regasification Terminal – Rotterdam, Europe
The compact Model A‑500 handled 3 MMcf/d of low‑pressure LNG feedstock, cutting the terminal’s auxiliary power demand by 0.9 MW. The project was delivered in 5 weeks, 30 % faster than the original schedule.
3. Specialty Gas Production – Osaka, Japan
For a high‑purity nitrogen line, Model C‑1000 achieved 99.9995 % purity with a vibration‑free operation, meeting stringent semiconductor‑fab standards (ISO 14644‑1 Class 5).
These examples prove that the Enric turbine compressor can be a decisive factor in meeting ROI, compliance, and schedule goals.
Explore Customer Success
Standard models ship within 2‑3 weeks after payment. OEM/ODM projects require 3‑6 weeks for design freeze, tooling, and first‑article testing. Expedited air‑freight can cut total door‑to‑door time to 10 days.
Yes. All models meet ISO 22734‑1 for hydrogen service up to 30 % H₂ by volume. Materials such as Inconel 718 (Model C‑1000) are recommended for >30 % blends.
We offer L/C at sight, 30 % T/T + 70 % upon delivery, or open account for qualified B2B customers. All terms comply with international trade regulations.
Our global service network covers North America, Europe, and Asia‑Pacific. Spare‑part kits are stocked in regional warehouses; on‑site maintenance can be scheduled within 48 hours of a service request.
Absolutely. Our engineering team will run a CFD‑based simulation at no cost, delivering a detailed energy‑savings report within 5 business days.
Order before 31 May 2026 and receive a 30‑day free‑sample trial plus money‑back guarantee if performance targets aren’t met.
Or fill the quick form below – we’ll respond within 24 hours.
James Patel, Operations Manager, Air Liquide Europe
Emily Rogers, Purchasing Director, Chevron USA
Hiroshi Tanaka, Technical Lead, JFE Steel Japan
Global Sales Offices
Europe – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
Headquarters | Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Our turbine compressors power projects for Fortune‑500 manufacturers and leading energy integrators.
thermal-power-storage storage-tank-manufacturer storing-ammonia storage-tank-insulation