For Purchasing Managers, Technical Directors, and Operations Leaders who wrestle with high‑energy bills, unreliable flow, and delayed shipments, our compressors turn pressure into profit.
Get Free Quote in 24 hEven the most reputable plants face the same three‑to‑six chronic issues:
Imagine a plant that burns 25 % less power while keeping pressure within ±0.5 % of set‑point – that’s the difference a purpose‑built compressor makes.
See the Solution| Model | Max Flow (Nm³/h) | Max Pressure (bar) | Power (kW) | Drive | Materials | Certifications |
|---|---|---|---|---|---|---|
| EN‑C100 | 100 | 30 | 45 | VFD (0‑100 %) | 316 SS | CE, ISO 9001, ASME |
| EN‑C250 | 250 | 45 | 110 | VFD + Smart‑Control | Hastelloy C‑276 | CE, ISO 9001, DOT, FCC |
| EN‑C500 | 500 | 70 | 210 | Dual‑VFD, Redundant Sensors | Carbon Steel + Coating | CE, ISO 9001, ASME, RoHS |
1. Green‑Hydrogen Production (Electrolyzer Feed‑stock)
Our EN‑C250 was installed at a 120 MW electrolyzer plant in Texas. Pressure stability improved from ±1.2 % to ±0.4 %, cutting hydrogen‑purity re‑circulation by 18 % and saving US$ 0.9 M annually.
2. Natural‑Gas Transmission (LNG Pre‑Compression)
A European LNG terminal adopted three EN‑C500 units, achieving a 22 % reduction in compressor‑fuel consumption versus legacy oil‑driven units, enabling compliance with EU‑ETS carbon caps.
3. Specialty Gas Distribution (Semiconductor Manufacturing)
In a Singapore fab, the EN‑C100 supplied ultra‑pure nitrogen at 0.02 % O₂. The precision control reduced wafer defect rates by 0.7 % – equivalent to a US$ 1.2 M yield gain.
Request a Custom Quote
what-are-energy-storage-systems vapour-recovery-compressor uses-of-hydrogen-energy what-can-hydrogen-be-used-for
They raise low‑pressure hydrogen from the electrolyzer to storage‑grade pressure (typically 30‑70 bar), ensuring a steady flow to downstream compression or blending units while minimising energy loss.
Yes. Our OEM/ODM service allows flange dimensions from ½ inch up to 24 inch, material selection (316 SS, Hastelloy, carbon steel), and optional magnetic‑seal couplings.
Standard stock ships in 14 days. For bespoke designs, the engineering‑to‑production window averages 28 days after CAD approval.
Our global engineering team offers optional turnkey services: site survey, mechanical erection, electrical integration, and performance validation – all covered under a single contract.
We comply with CE, REACH, and EU‑type‑approval rules. Freight is arranged via FCL or RORO with customs brokerage included; typical port‑to‑door time is 7‑10 days.
We provide 24/7 remote monitoring, a 2‑year spare‑parts warranty, and optional extended service contracts (up to 5 years) with on‑site preventive maintenance.

Limited‑time Offer: Free 30‑day performance trial + complimentary on‑site pressure audit. No‑risk, money‑back guarantee if your plant does not meet the promised efficiency.
All inquiries are handled by our certified engineering team within 24 hours. Act before 31 Oct 2026 – stock for the EN‑C500 series is limited to 150 units.
James Lee, Procurement Manager – GlobalChem (USA)
“The EN‑C250 reduced our nitrogen‑purge cost by **22 %** and arrived in two weeks. The ISO‑9001 paperwork was flawless, making customs a breeze.”
Maria González, Technical Director – Hidrógeno Verde S.A. (Spain)
“Our electrolyzer feed‑stock pressure stability improved from ±1.2 % to ±0.4 % after installing the EN‑C250. The ROI hit in 13 months, well ahead of the forecast.”
Ahmed Al‑Saadi, Operations Lead – Al‑Riyadh LNG (Saudi Arabia)
“Fast delivery saved us $60 k in demurrage. The compressor ran 99.8 % uptime during the first six months – exactly what we needed for our export contracts.”
Contact Us Today
Europe: Bowen Di | +86 156 1436 8118 | dibowen@enricgroup.com | WhatsApp +86 181 3205 9236
North America: Jeremy Wu | +86 153 0330 2613 | wuzuoliang@enricgroup.com | WhatsApp +86 138 3101 9831
Global: +86‑311‑81663811 | gasequipment@enricgroup.com
Address: No. 169, Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
All data are based on publicly available market reports (MIT 2011; IEA 2025; Fortune Business Insights 2025) and Enric’s own test labs.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders – Certifications & Results
Our compressors power facilities for more than 40 countries, including the United States, Germany, South Korea, and Nigeria.