Designed for Purchasing Managers, Technical Directors & Operations Leaders who need reliable temperature control on steam‑turbine exhaust, without breaking the budget.
Get Free Quote in 24 h1. Excess Exhaust Temperature – Steam turbines often discharge at 250‑350 °C. Without a desuperheater, downstream condensers operate inefficiently, raising fuel consumption by up to 15 %.
2. Over‑Pressurised Process Streams – Many chemical reactors require feed at 120‑150 °C. Superheated steam can cause pressure spikes, leading to costly safety‑valve trips.
3. Unpredictable Thermal Stress – Repeated temperature swings shorten the life of heat‑exchanger tubes by 20‑30 % (source: Industrial Gases Market 2025‑2034).
4. Regulatory Penalties – EU’s Eco‑Design Directive mandates ≤ 5 % temperature deviation for waste‑heat recovery systems. Non‑compliance can trigger fines of €50 k per incident.
5. High Shipping & Handling Costs – Over‑heated products require insulated containers, adding 10‑20 % to logistics budgets.
Discover how a modern desuperheater eliminates these losses →
At Shijiazhuang Enric Gas Equipment Co., Ltd. we offer a patented, ASME‑certified desuperheater that blends precision engineering with OEM/ODM flexibility. Below are the core advantages that directly answer the pain points above.
| Parameter | Specification | Unit |
|---|---|---|
| Design Pressure | 25 | bar |
| Inlet Temperature (Superheated Steam) | 250‑350 | °C |
| Outlet Temperature (Target) | 120‑150 | °C |
| Heat Transfer Area | 12.5 | m² |
| Material | 316L SS (standard) / Inconel 625 (high‑temp) | – |
| Flow Rate Range | 0.5‑5.0 | kg/s |
| Control Interface | Modbus/TCP, 4‑20 mA, HART | – |
| Weight | 850 | kg |
A desuperheater is a **specialized heat‑exchange device** that removes the *superheat* component from steam or gas streams, bringing the temperature down to a precise target. Unlike a generic heat exchanger, it integrates **direct‑injection spray nozzles** and **feedback temperature controllers** to achieve ±2 °C accuracy, which is critical for downstream condensers and reactors.

Yes. Our OEM/ODM service supports **up to 30 bar** design pressure, with material options ranging from 316L stainless steel to Inconel 625. Engineering drawings and CFD analysis are provided before fabrication.
Standard models (e.g., D‑S300) are stocked. **2‑week** delivery from order confirmation, including factory test report and CE/ASME certificates.
We offer **container‑load (FCL)** or **less‑than‑container‑load (LCL)** options. All units are pre‑packed with anti‑shock bracing, and we handle customs clearance in the US, EU, and Asia.
A 2‑year **comprehensive warranty**, on‑site commissioning, 24/7 remote monitoring via our SCADA portal, and a stocked spare‑parts inventory in Europe and North America.
Order before 31 May 2026 and receive a **free 3‑month performance monitoring package** plus **complimentary on‑site calibration**.
No‑risk: Money‑back guarantee if performance does not meet the spec within 90 days.
Mark L., Procurement Lead – PetroChem Corp (USA)
“The desuperheater cut our steam‑condensing load by 18 % and saved us $45 k in the first quarter.”
Laura G., Technical Director – GreenHydro Ltd. (Germany)
“We needed a 400 °C inlet capability for our SMR plant – Enric delivered an Inconel version in 12 days. Performance matches the spec.”
Ahmed S., Operations Manager – Al‑Rashid Energy (UAE)
“Fast shipping, clear documentation, and the on‑site training saved us weeks of downtime.”
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders
“After installing Enric’s D‑S300, our turbine back‑pressure dropped by 0.8 bar and fuel cost fell 12 % within three months.” – Operations Manager, Shell Europe
“The custom‑fabricated Inconel version survived a 400 °C inlet test – a benchmark for our high‑temperature reformer.” – Technical Director, Siemens Energy
turbine-valve turbine-bypass-valve thermal-storage-system types-of-thermal-energy-storage
All certifications are valid for global export, complying with US DOT, EU CE, and Asian regulatory frameworks.