For Purchasing Managers, Technical Directors & Operations Leaders who need reliable, high‑efficiency power without the price‑tag.
Get Free Quote in 24 hReady to see how distributed power can transform your plant?
Corporate purchasing teams across the US and Europe report three recurring pain points:
Imagine a scenario where a 2 MW plant in Texas loses 80 MWh each month due to grid instability. That translates to ≈ $12,000 in lost revenue per month – a figure that compounds quickly.
Solution? Distributed power that brings generation right to the load.
Explore the Solution →| Parameter | Model A (0.5 MW) | Model B (2 MW) | Model C (5 MW) | Model D (10 MW) |
|---|---|---|---|---|
| Engine Type | Turbo‑charged Diesel | Turbo‑charged Diesel | Dual‑fuel (Diesel / CNG) | Dual‑fuel (Diesel / CNG) |
| Thermal Efficiency | 40 % | 42 % | 45 % | 45 % |
| Power Factor (PF) | 0.95 | 0.96 | 0.97 | 0.98 |
| Noise Level (dB(A)) | 78 | 75 | 72 | 70 |
| Emission (NOx, g/kWh) | 0.3 | 0.28 | 0.25 | 0.22 |
| Operating Temp. Range | -30 °C ~ +45 °C | -30 °C ~ +50 °C | -40 °C ~ +55 °C | -40 °C ~ +55 °C |
| Control System | PLC‑based | PLC‑based + Remote I/O | SCADA‑ready | SCADA‑ready + Cloud‑monitor |
| Dimensions (L×W×H) | 2.0 × 1.5 × 1.8 m | 3.8 × 2.2 × 2.5 m | 5.5 × 3.0 × 3.5 m | 8.0 × 4.5 × 4.5 m |
| Weight | 4 t | 12 t | 28 t | 55 t |
| Standard Warranty | 24 months | 36 months | 36 months | 48 months |
Key Performance Highlights
Distributed power is not a one‑size‑fits‑all concept. Below are three typical deployments:
Ready to see a live demo?
Book a Demo →
Distributed power refers to small‑to‑mid‑size generation units (0.5‑10 MW) located close to the load, reducing transmission losses, improving reliability, and enabling modular scaling.
Yes. Our OEM/ODM service supports 400 V‑480 V, 50 Hz‑60 Hz, and can integrate with SCADA, PLC, or cloud‑based control platforms.
Standard models ship within 30 days after PO confirmation; custom designs add 2‑4 weeks for engineering. Full on‑site commissioning is usually completed within 7 days of delivery.

We work with global freight forwarders and provide DDP (Delivered Duty Paid) options for the US, EU, and major Asian markets. All paperwork complies with local regulations (e.g., EU REACH, US EPA).
A 24/7 technical hotline, remote diagnostics, annual preventive maintenance contracts, and a 48‑month warranty on core components.
We partner with global banks to offer CAPEX‑friendly leasing, OPEX‑based pay‑per‑use, and green‑loan options for projects meeting carbon‑reduction targets.
Our units can operate in hybrid mode with solar PV or wind, providing seamless load‑following and grid‑support functions, as highlighted in the MIT natural‑gas bridge study.
Order before 31 May 2026 and receive:
Choose the contact method that suits you best:
Laura M., Procurement Lead, GE Healthcare – “The 5 MW unit delivered 99.99 % uptime during our critical sterilization phase. ROI realized in 8 months.”
Tomás R., Technical Director, Iberdrola – “Hybrid operation with solar cut our diesel consumption by 18 % and earned us carbon‑credit incentives.”
Sarah J., Operations Manager, Nestlé USA – “Fast installation meant we avoided a costly production halt. The remote monitoring dashboard is a real time lifesaver.”
Shijiazhuang Enric Gas Equipment Co., Ltd. | No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
North America Contact: Jeremy Wu | Tel: +86‑153‑0330‑2613 | WhatsApp: +86‑138‑3101‑9831 | Email: wuzuoliang@enricgroup.com
Europe Contact: Bowen Di | Tel: +86‑156‑1436‑8118 | WhatsApp: +86‑181‑3205‑9236 | Email: dibowen@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
Customer Testimonials
sustainable-energy-storage types-of-energy-storage-system tank-container utility-scale-energy-storage-systems
Regulatory Compliance
- ASME Section VIII Division 1
- DOT 49 CFR 178
- EU Machinery Directive 2006/42/EC
- ISO 9001:2015, ISO 14001:2015, ISO 45001:2018
Get a Personalized Quote