Designed for Corporate Purchasing Managers, Technical Directors and Operations Managers who need a reliable, low‑cost energy buffer that can handle peak‑load, renewable‑grid smoothing and backup power—all while meeting CE, ISO 9001 and ASME standards.
According to the Industrial Gases Market 2025 report, the global demand for high‑performance storage in the chemical sector alone will grow 6 % YoY, yet 45 % of projects are delayed by inadequate storage tech.
Discover the hybrid solution that eliminates these pain points →
Our hybrid system couples high‑energy density lithium‑ion modules with high‑power flow‑battery banks and a smart BMS (Battery Management System). The result is a storage platform that delivers up to 4 × higher round‑trip efficiency and 10‑year guaranteed cycle life under industrial conditions.
| Parameter | Hybrid System (Typical) | Pure Li‑ion | Pure Flow |
|---|---|---|---|
| Nominal Energy | 5 MWh | 5 MWh | 5 MWh |
| Power Rating | 4 MW (continuous) / 5 MW (peak) | 2 MW | 3 MW |
| Round‑Trip Efficiency | 92 % | 85 % | 80 % |
| Cycle Life @ 80 % DOD | 15 000 cycles | 5 000 cycles | 8 000 cycles |
| Operating Temperature | -30 °C ~ +55 °C | -10 °C ~ +45 °C | -20 °C ~ +50 °C |
| Footprint | 1.2 m²/kWh | 1.5 m²/kWh | 1.0 m²/kWh |
| Safety Standard | UL 9540, IEC 62619 | UL 9540 | IEC 61800‑5‑1 |
| Lead Time | 8‑10 weeks (factory‑ready) | 12‑18 weeks | 10‑14 weeks |
All units are manufactured at our Shijiazhuang Enric Gas Equipment facility, leveraging >30 years of pressure‑vessel expertise and a fully automated assembly line.
A hybrid system integrates two or more storage chemistries—typically lithium‑ion for high energy density and flow‑type (vanadium or zinc‑bromine) for high power output. The combination yields superior round‑trip efficiency, longer cycle life, and modular scalability that pure Li‑ion cannot achieve.
Yes. Our engineering team offers OEM/ODM design services. Modules are stacked in a container‑based architecture, allowing you to add 0.5 MW blocks until the desired capacity is reached.
Standard terms are 30 % T/T deposit, 40 % upon factory acceptance test, and 30 % after shipment. We also support LC, open account for vetted partners, and PayPal for sample orders.
Factory‑ready units ship within 8‑10 weeks. Ocean freight to US East Coast averages 21 days; to Europe 18 days. We handle customs clearance and provide DAP or DDP options.
A 24/7 remote monitoring service, on‑site warranty technician visits (first year), and a 10‑year warranty on the power‑module hardware. Spare parts are stocked in North America and Europe for rapid replacement.

Limited‑time offer: Free 1‑month trial of our cloud‑based Energy Management SaaS (valued at $9,999) when you place a purchase order before 31 Oct 2026. Plus, we’ll ship a free 5 kWh demo pack to your site—no risk, no obligation.
Emily Chen – Procurement Lead,
“The hybrid system delivered 4 MW instantly during a grid fault. We avoided a $250k production loss. The installation was finished in 3 weeks—exactly as promised.”
Raj Patel – Technical Director,
“Our OPEX dropped 22 % thanks to predictive maintenance alerts. The CE and UL certifications made the internal approval process painless.”
Alice Morgan – Operations Manager,
“We needed a fast‑track solution for a new solar‑plus‑storage project in Sweden. Enric delivered a ready‑to‑run hybrid unit in 8 weeks—well ahead of schedule.”
Contact Us
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America Region – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
Head Office – Tel: +86 311 8166 3811 | Email: gasequipment@enricgroup.com | Contact Form
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved. Privacy policy: Read here.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
“Our plant’s energy cost dropped 28 % after Enric’s hybrid system was commissioned. Lead time was 9 weeks – half of our original schedule.” – John Liu, Operations Manager, Shell China
“The AI‑driven BMS gave us real‑time insights that cut OPEX by 18 %.” – Maria García, Technical Director, Siemens Energy
types-of-energy-storage-system utility-scale-energy-storage-systems utility-energy-storage sustainable-energy-storage