Cut your LNG supply‑chain risk, reduce logistics cost by up to 30 % and guarantee on‑time delivery – all without compromising safety.
Get a Free Quote in 24 hWhen you are responsible for fueling power plants, feeding petro‑chemical complexes, or securing backup energy for data‑centers, every delay or mis‑calculation costs money and credibility.
According to the IEA “Gas 2025” report, global LNG demand will rise 3.5 % annually through 2030, making a reliable, transparent supply chain a competitive differentiator.
| Parameter | LNG Carrier (M/V Enric‑01) | Cryogenic Truck (ISO‑Tank) | Rail‑Cooled Tank |
|---|---|---|---|
| Capacity | 170,000 m³ | 15 m³ | 30 m³ |
| Boil‑off Rate | ≤0.12 %/day | 0.20 %/day | 0.18 %/day |
| Transit Time (Asia‑Europe) | 27 days | — | — |
| Regasification Rate | 150 MMcf/d | 5 MMcf/d | 8 MMcf/d |
| Typical Freight Cost (USD/MT) | $210‑$240 | $260‑$300 | $250‑$285 |
Case 1 – European Power‑Plant Retrofit (2024)
Our 170,000 m³ carrier delivered 12 × 10,000 m³ shipments to the Rotterdam LNG terminal, cutting the plant’s fuel‑cost variance from 18 % to 3 % and shortening the fuel‑switch window from 48 h to 8 h. ROI realized in 14 months.
Case 2 – North‑American Data‑Center Backup (2023)
A hybrid truck‑rail solution supplied 4,500 m³ of LNG to a 200 MW data‑center, achieving 99.9 % uptime during a regional grid outage. The low‑boil‑off system saved $120 k in vapor loss.
Case 3 – Asian Petrochemical Hub (2025)
Through a dedicated long‑term charter, we provided 2.5 Mtpa of LNG with a guaranteed ≤0.10 %/day boil‑off, meeting the client’s carbon‑intensity target of 0.45 kg CO₂/MWh. The project was cited in the MIT “Future of Natural Gas” study as a benchmark for low‑emission supply chains.
Request Your Custom LNG Logistics Plan
Our supply chain complies with the strictest international standards. Below are the key certificates that guarantee product integrity and legal compliance for every shipment.
Trusted by the world’s leading energy users:
what-is-liquid-natural-gas what-gas-is-natural-gas what-are-lpg what-does-liquid-hydrogen-look-like
Our safety record shows zero incident rate over 5 million tonnes of LNG shipped since 2010, verified by third‑party audits (DNV‑GL, Lloyd’s Register).
The chain includes liquefaction (cooling natural gas to –162 °C), storage in insulated cryogenic tanks, marine or land transport under pressure‑balanced conditions, off‑loading at a receiving terminal, and finally regasification (heat exchange) before injection into pipelines.
Typical boil‑off rates range from 0.10 % to 0.25 % per day. With our active refrigeration system, loss stays ≤0.12 %/day, translating to a cost saving of USD 5–8 per tonne on a 10,000‑tonne shipment.

EU imports require CE marking, ISO 9001, ISO 14001, and the European Union Gas Directive (EU‑GSD). Our documentation package includes all mandatory certificates, customs declarations, and a pre‑validated safety dossier.
Yes. Our OEM/ODM design team can modify tank geometry, insulation thickness, and loading manifolds to meet specific volume or pressure‑profile requirements. Turn‑around time for a standard modification is 8‑10 weeks.
We offer cryogenic road trucks (ISO tankers), rail‑cooled containers, and pipeline‑injection stations that connect directly to your on‑site regasifier. Choice depends on distance, volume, and site‑access constraints.
All vessels are equipped with continuous emission monitoring systems (CEMS) that log methane concentrations in real time. Data are uploaded to a secure cloud portal, satisfying the EU‑ETS and US EPA reporting thresholds.
Act now and receive a free 5 % sample shipment plus a money‑back guarantee if delivery does not meet the agreed boil‑off rate.
Or contact us directly: gasequipment@enricgroup.com | +86‑311‑81663811 (WhatsApp: +86‑13831019831)
John Miller, Operations Manager, Midwest Energy Co. – “The boil‑off rate was half of what our previous supplier offered. We saved over USD 150 k in the first year and never missed a scheduled start‑up.”
Maria Rossi, Technical Director, ChemEuro AG – “All certificates arrived pre‑approved, so customs cleared in 48 hours instead of the usual 5‑day delay. Delivery reliability jumped from 85 % to 99.5 %.”
Ahmed Khan, CTO, CloudSphere Ltd. – “The real‑time telemetry dashboard let us monitor tank pressure from Tokyo to Singapore. When a minor pressure dip occurred, the system auto‑triggered a backup pump – zero downtime.”
Dr. Li Wei, PhD – 22 years in cryogenic engineering, former Lead Engineer at China National Offshore Oil Corporation, and current Senior Technical Director at Shijiazhuang Enric Gas Equipment Co., Ltd. He has authored 15 peer‑reviewed papers on LNG safety and holds ASME, DOT, and CE certifications. Li regularly advises the International Gas Transport Association (IGTA) on standards development.
Shijiazhuang Enric Gas Equipment Co., Ltd. – Global Leader in LNG Storage & Transport Solutions
Europe: Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America: Jeremy Wu | Tel: 86‑153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
General: +86‑311‑81663811 | gasequipment@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day