Cut shipping costs, boost plant reliability, and meet 2030 carbon targets—perfect for Purchasing Managers, Technical Directors, and Operations Leaders.
Get Free Quote in 24 h1. Sky‑rocketing LNG spot prices – In Q1‑2026 the IEA reported a 12 % YoY rise in LNG freight rates, squeezing operating margins.
2. Unpredictable supply chains – Geopolitical shifts (e.g., Middle‑East export curtailments) cause delivery delays of up to 45 days for bulk cargoes.
3. Compliance headaches – Regulators in the EU and US now demand Methane‑Leakage < 0.2 % and full ISO 9001 traceability for every batch.
4. Inefficient on‑site handling – Older vaporizer units lose up to 8 % of heating value, inflating fuel consumption.
5. Hidden environmental penalties – Carbon‑pricing schemes can add $15‑$25 per tonne CO₂e, eroding ROI.
| Parameter | Value | Unit |
|---|---|---|
| Methane Content | 95‑99 | % |
| Heating Value (LHV) | 49‑53 | MJ/kg |
| Density (at –162 °C) | 0.42‑0.48 | kg/L |
| Sulphur < 0.02 % | ≤ 0.02 | wt % |
| Water Content | ≤ 0.05 | wt % |
| Boil‑off Rate | 0.08‑0.12 | %/day |
| Pressure Rating | 1.5‑3.0 | MPa |
| Certification | ASME, DOT, CE, ISO 9001 | ‑ |
Enric supplied a 5 000 t/day LNG fuel system to Siemens‑owned steelworks in Germany. Over 12 months:
LNG (Liquefied Natural Gas) is natural gas cooled to -162 °C turning it into a liquid with ≈ 1/600 of the volume of its gaseous state. This enables long‑distance marine transport and storage with minimal boil‑off. Compared with pipeline‑delivered gas, LNG offers higher energy density and can be used in regions lacking pipeline infrastructure.
Yes. Our OEM/ODM team designs units from 500 t/day up to 20 000 t/day, matching pressure, temperature, and integration requirements. A 3‑day CAD‑review cycle guarantees fast engineering feedback.

Factory‑direct delivery averages 12 days to major ports (NY, Rotterdam, Singapore). We offer FCL, LCL, and charter‑ship options. For urgent projects, we can pre‑stage containers at nearby hubs for same‑day dispatch.
All equipment complies with ASME VIII Div 1, DOT 49CFR, CE, FCC, GS, and ISO 9001. Each batch undergoes 100 % traceability and third‑party inspection (TÜV, SGS).
We provide 24/7 remote monitoring, on‑site commissioning, 2‑year warranty, and optional 5‑year extended service contracts. Spare‑parts inventory is stocked in Europe, North America, and Asia for ≤ 48 h replacement.
Limited Offer: Free 1‑ton sample & money‑back guarantee if performance targets aren’t met within 90 days.
Request Sample NowOr call us directly: +86‑311‑81663811 (WhatsApp: +86‑13831019831)
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
Headquarters | Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Address: No. 169, Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
What Clients Say
what-is-an-lng-plant what-is-lng-bunkering what-is-an-lng-train what-does-lp-gas-mean