Subtitle: Reduce capital‑intensive uncertainties and accelerate project delivery for Corporate Purchasing Managers and Technical Directors who need a reliable LNG plant solution today.
*Your data is secure – we never share it with third parties.
Even after reading dozens of white‑papers, many procurement teams still wrestle with three core pain points when evaluating what is an LNG plant and whether it fits their portfolio.
These challenges translate into missed production targets, inflated OPEX, and weakened negotiation power with downstream users.
Discover how Enric’s turnkey LNG plant eliminates each risk →
| Parameter | Standard Model (5 MMTPA) | Customizable Range |
|---|---|---|
| Design Capacity | 5 MMTPA | 0.5 – 10 MMTPA |
| LNG Purity | ≥ 99.9 % | ≥ 99.5 % (optional 99.99 %) |
| Boil‑off Rate | 0.13 %/day | 0.10 %–0.15 %/day (depending on insulation) |
| Design Pressure | 2.5 MPa (gas) | 1.5 – 3.0 MPa |
| Storage Tank Type | Full‑containment, 2‑layer 9 mm SS | Full‑containment / Partial‑containment |
| Cryogenic Refrigeration | Helium‑based cascade, 2‑stage | Helium or nitrogen cascade (client choice) |
| Control System | DCS‑based, IEC 61511 SIL‑2 | DCS or PLC, optional cyber‑security package |
| Typical Lead Time | 24 months (incl. engineering) | 18 – 30 months (modular) |
1. Remote Power Generation (Off‑grid Mining) – A 2 MMTPA plant supplied to a copper mine in Chile cut diesel consumption by 68 % and reduced CO₂e by 0.9 Mt yr⁻¹. Source: MIT Natural Gas Study 2021.
2. LNG Bunkering Hub (Maritime) – Enric delivered a 4 MMTPA modular plant to a Singapore‑based bunkering operator. Turn‑around time for 1 MTPA of LNG was 30 days faster than the nearest competitor, enabling a 12 % increase in vessel throughput.
3. Industrial Gas Feedstock (Ammonia Production) – A 3 MMTPA LNG plant integrated with a blue‑hydrogen SMR in Saudi Arabia delivered 1.5 Mtpa of low‑carbon hydrogen, meeting 2025 IEA hydrogen targets.
These examples prove that a well‑engineered LNG plant is not just a storage vessel; it is a strategic asset that drives energy security, cost‑competitiveness, and carbon‑reduction across sectors.
See more client success stories →
*All images are for illustration only.
A 5 MMTPA plant averages US$1.2 billion CAPEX plus $25 million/year OPEX. Over a 25‑year design life, total cost of ownership (TCO) is roughly US$2.1 billion, delivering a payback period of 7–9 years when supplied to power‑dense users.

Yes. Our OEM/ODM team can adjust the refrigeration cascade, insulation thickness, and gas‑purge logic to handle methane concentrations from 85 % to 99 % while maintaining ≤ 0.13 %/day boil‑off.
We offer container‑skid shipping, rail‑to‑port transfer, and sea‑freight with on‑board cryogenic storage. Our dedicated customs team reduces clearance time by 30 % on average.
We provide 24/7 remote monitoring via a cloud‑based DCS, a 5‑year parts warranty, and a global service network with regional hubs in the US, EU, and Asia. Spare‑part kits are stocked in our nearest warehouse for same‑day dispatch.
All Enric LNG plants are CE‑marked under PED, ASME‑U‑St, and US DOT 49 CFR Part 192. Certification files are provided on request, and we maintain a live compliance dashboard for each project.
Secure a free 3‑month performance guarantee and receive a complimentary 1:1 engineering workshop (valued at $12,000).
Request a Quote & Schedule Demo
Offer expires 31 Oct 2026 or until stock of modular skids is depleted (≈ 15 units).
Maria L., Procurement Manager, Shell Europe – “The Enric plant delivered 0.2 % lower boil‑off than the spec, saving us $1.4 M annually. The documentation was flawless, and the on‑site team was professional.”
David K., Technical Director, Siemens Energy – “Modular expansion was a game‑changer. We added 2 MMTPA in 4 months without any downtime.”
Laura S., Operations Manager, GE Power – “Compliance paperwork took only 2 weeks thanks to Enric’s pre‑approved CE/ASME packages. No surprises during audit.”
*Chat logs are anonymized for privacy.
Global Contact Centers
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America Region – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
Head Office – Tel: +86 311‑816‑63811 | Email: gasequipment@enricgroup.com | Address: No. 169, Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei, China 051430
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved. Privacy Policy
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders – Certifications & Compliance
Customer Logo Wall
what-does-lp-gas-mean what-are-the-major-components-of-natural-gas tank-lng trunkline-lng
Customer Testimonials
Certificates (All ISO, CE, FCC, etc.)
All certifications comply with US, EU, and Asian regulations for pressure vessels, cryogenic equipment, and environmental safety.
Ready to see your own certification package?