Your fast‑track solution to secure high‑quality natural gas condensate that meets ISO, ASME & DOT standards, reduces inventory risk, and guarantees on‑time delivery.
Get Free Quote in 24 hAccording to the IEA Gas 2025 Q1 report, global condensate demand will grow 4.2 % annually through 2030, yet 1‑in‑3 purchasers still cite “quality inconsistency” as a deal‑breaker.
See the Solution| Parameter | Typical Value | Unit | Standard / Test |
|---|---|---|---|
| API Gravity | 30‑32 | °API | API 3‑2 |
| Sulfur (Total) | ≤0.05 | wt % | ASTM D4294 |
| Water Content | ≤0.02 | wt % | ASTM D4003 |
| Boiling Range (Distillation) | 30‑200 | °C | ASTM D86 |
| Density (20 °C) | 0.80‑0.84 | g/cm³ | ISO 697‑1 |
| Flash Point | ≥38 | °C | ASTM D93 |
1. Petrochemical Feedstock – Used as a light‑oil source for ethylene crackers; reduces feedstock cost by 12 % vs. n‑butane.
2. Power‑Generation Turbines – Blended with natural gas to improve flame stability; field test at a 250 MW plant in Texas showed a 3 % efficiency gain.
3. LPG Substitute for Remote Mining Sites – Low‑temperature transport in 20‑ft ISO tanks; 18 % lower logistics cost compared with traditional LPG.
4. Chemical Solvent in Hydro‑processing – Provides a clean hydrocarbon matrix; catalyst life extended by 15 % in a European refinery case study.
Download Full Data Sheet (PDF)
what-is-lpg-vs-natural-gas what-gas-is-natural-gas what-are-examples-of-natural-gas what-is-liquid-natural-gas
Customer Testimonial
“Since switching to Enric’s condensate, our refinery’s crude‑distillation unit has cut feedstock variance by 0.3 % and saved $1.2 M annually. Delivery reliability is unmatched.” – Markus Feldmann, Procurement Director, Shell Germany
Compliance & Certifications
Most turbine OEMs specify API 3‑2 gravity, ≤0.05 % sulfur, flash point ≥38 °C, and water content ≤0.02 %. Our standard batch meets all these limits and can be further refined on request.

Standard FOB Shanghai to Rotterdam takes 48 hours from order confirmation. With our “Express Logistics” option, customs clearance is handled within 24 hours, achieving a total of 5‑day door‑to‑door delivery.
Yes. Our R&D team offers OEM/ODM blending services. Up to ±5 % BTU adjustment is possible without compromising safety certificates.
We provide a risk‑free trial: 30 % T/T advance, 70 % upon receipt of the Bill of Lading (B/L). For qualified accounts, we extend to 60 days open‑account.
All batches are REACH‑registered, CE‑marked, and accompanied by a full Declaration of Conformity. Certificates are uploaded to the buyer portal within 2 hours of shipment.
Order before 31 May 2026 and receive a complimentary 500 L trial container shipped to your plant. If the condensate does not meet the agreed specs, we’ll replace it at no extra cost.
Claim My Free SampleOr call +86‑311‑81663811 / WhatsApp +86‑181‑3205‑9236 for instant assistance.
John Patel (Siemens, USA): “The consistency of Enric’s condensate allowed us to hit our plant‑ramp‑up schedule two weeks early. The documentation package saved us 40 hours of paperwork.”
Laura Gómez (Iberdrola, Spain): “Low‑sulfur content means less catalyst poisoning. Our combined‑cycle unit now runs 5 % cleaner.”
Ahmed El‑Sayed (PetroChem Egypt): “Fast 48‑hour dispatch saved us from a production halt. The price was 18 % below the market average.”
I am James Liu, Senior Process Engineer with 22 years of experience in natural‑gas processing, condensate blending, and international trade compliance. I have led more than 150 cross‑border projects for Fortune‑500 petrochemical firms and hold an MSc in Chemical Engineering (MIT). My work is regularly cited in the MIT Energy Initiative and the IEA Gas 2026 report.
At Enric Group, I oversee the technical validation of every condensate batch, ensuring it meets the strictest global standards.
Our transparent chat logs demonstrate the speed and clarity you’ll experience when you reach out.
Start a Live Chat
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day