Transform raw biogas into pipeline-quality biomethane with 98%+ methane purity using Shijiazhuang Enric's industry-leading upgrading systems. Reduce CO₂ emissions by 80% while unlocking revenue streams from waste-to-energy projects.
For municipal waste plants, agricultural digesters, and industrial biogas producers seeking compliant, scalable, and cost-effective solutions.
Get a Custom Quote in 24 HoursRaw biogas contains 30-50% CO₂, traces of H₂S, moisture, and other impurities that limit its applications. Without upgrading, you're missing out on:
Unprocessed biogas can't be injected into natural gas grids or used as vehicle fuel due to purity requirements (typically 96-98% CH₄). Source: IEA Global Hydrogen Review 2024
Combusting raw biogas in engines or boilers loses 20-30% efficiency compared to upgraded biomethane, increasing operational costs.
Stringent emissions standards (e.g., EPA's RFS Program or EU's RED II) require biomethane to meet >97% methane purity for incentives.
H₂S and moisture in raw biogas accelerate corrosion in pipes and engines, leading to costly maintenance (up to $50,000/year for large plants).
Biomethane qualifies for renewable fuel credits (RINs, LCFS), which can add $1.50–$3.00/mmbtu to your revenue. Source: AGF Renewable Natural Gas Study 2025
Raw biogas has 60% lower energy density than biomethane, making compression and transport economically unviable.
Solution: Our biogas upgrading systems address all these pain points with 99%+ methane recovery and near-zero downtime.
With 50+ years of gas equipment expertise and 200+ global installations, Enric delivers turnkey biogas-to-biomethane solutions that are:
Our systems operate in 40+ countries, processing 1+ billion Nm³ of biogas annually. Certified for compliance with EPA, EU, and ASME standards.
Exceeds ASTM D7842 and EN 16723-1 standards for grid injection and vehicle fuel.
Minimizes waste with proprietary membrane separation or pressure swing adsorption (PSA).
Solutions for 50 Nm³/h to 5,000 Nm³/h biogas flow rates, with plug-and-play containerized units.
$0.02–$0.05/Nm³ operating cost—30% lower than competitors. Energy-efficient designs reduce power consumption by 20%.
Environmentally friendly with no wastewater—ideal for sensitive ecosystems.
Our upgrading systems integrate seamlessly with your existing anaerobic digesters, landfills, or wastewater treatment plants, delivering pipeline-ready biomethane or compressed biomethane (CBM) for vehicles.
Enric's 2,000 Nm³/h Biogas Upgrading Plant in Germany (2024)
Not all biogas upgrading technologies are created equal. Below is a comparison of the three most common methods, with Enric's proprietary enhancements highlighted:
| Feature | Pressure Swing Adsorption (PSA) | Membrane Separation | Water Scrubbing | Enric's Hybrid PSA+Membrane |
|---|---|---|---|---|
| Methane Purity | 96-98% | 95-98% | 97-99% | 98-99.9% |
| Methane Recovery Rate | 90-95% | 92-97% | 98-99% | 99%+ |
| Energy Consumption (kWh/Nm³) | 0.25-0.35 | 0.20-0.30 | 0.30-0.40 | 0.18-0.22 |
| Capital Cost | $$$ | $$ | $$ | $ (20% lower) |
| Operational Complexity | Moderate | Low | High (chemical handling) | Low (automated) |
| Wastewater Generation | No | No | Yes | No (Zero Liquid Discharge) |
| Scalability | Good | Excellent | Limited | Excellent (Modular) |
| H₂S Removal Efficiency | 95% | 90% | 99% | 99.9% |
| Maintenance Requirements | Moderate | Low | High | Low (Remote Monitoring) |
Why Enric's Hybrid System Leads the Market:
Below are the specifications for our flagship models, designed for agricultural, municipal, and industrial biogas applications:
| Model | ECU-50 | ECU-500 | ECU-2000 | ECU-5000 |
|---|---|---|---|---|
| Biogas Input Capacity (Nm³/h) | 50 | 500 | 2,000 | 5,000 |
| Biomethane Output (Nm³/h) | 30-35 | 300-350 | 1,200-1,400 | 3,000-3,500 |
| Methane Purity (%) | 98 | 98-99 | 99 | 99.9 |
| Methane Recovery Rate (%) | 98 | 98.5 | 99 | 99.5 |
| Energy Consumption (kWh/Nm³) | 0.22 | 0.20 | 0.19 | 0.18 |
| CO₂ Emissions Avoided (tons/year) | 200 | 2,000 | 8,000 | 20,000 |
| H₂S Removal (ppm) | <0.1 | <0.1 | <0.1 | <0.1 |
| Dimensions (L×W×H) (m) | 6×2×2.5 | 12×3×3 | 20×4×4 | 30×6×5 |
| Weight (tons) | 5 | 20 | 40 | 80 |
| Installation Time (weeks) | 2 | 4 | 6 | 8 |
| Warranty | 5 years (extended to 10 with maintenance contract) | |||
Customization Options:
From small farms to large-scale municipal projects, Enric's technology is deployed across diverse applications:
Challenge: Farmers with anaerobic digesters struggle to monetize biogas beyond on-site electricity.
Solution: Enric's ECU-500 upgrades manure-derived biogas to biomethane, which is:
ROI: 2–3 years with government incentives (e.g., USDA REAP grants or EU CAP subsidies).
Challenge: Wastewater plants flare excess biogas due to limited storage and low purity.
Solution: Enric's ECU-2000 integrates with digesters to produce pipeline-quality biomethane, enabling:
Case Study: Los Angeles WWTP – Reduced flaring by 90% and generated $3M/year in RNG credits.
Challenge: Large landfills and industrial facilities produce high-volume, low-quality biogas with variable composition.
Solution: Enric's ECU-5000 handles 5,000 Nm³/h of raw biogas, delivering:
Case Study: Shanghai Landfill – Processes 10,000 Nm³/day of landfill gas, powering 5,000 homes with biomethane.
Our biogas upgrading systems meet the highest global standards for safety, performance, and environmental compliance:
Enric's biogas upgrading solutions are deployed by Fortune 500 companies, municipalities, and energy leaders worldwide:
Biogas is the raw gas produced from anaerobic digestion, containing 50–70% methane (CH₄), 30–50% CO₂, and traces of H₂S, moisture, and other impurities.
Biomethane is upgraded biogas with 96–99.9% methane purity, meeting the same standards as natural gas. It can be:
The cost depends on capacity, technology, and customization:
| Capacity (Nm³/h) | Estimated Cost (USD) | Cost per Nm³/h |
|---|---|---|
| 50–100 | $200,000–$400,000 | $4,000–$6,000 |
| 100–500 | $400,000–$1,500,000 | $3,000–$4,500 |
| 500–2,000 | $1,500,000–$5,000,000 | $2,500–$3,500 |
| 2,000+ | $5,000,000+ | $2,000–$2,800 |
Enric's Advantage: Our hybrid PSA+Membrane systems reduce costs by 15–25% compared to competitors, with faster ROI due to higher methane recovery.
The 4 primary methods are:
Enric's Hybrid System: Combines PSA + Membrane for 99%+ methane recovery with low energy consumption.
Installation timelines vary by system size and complexity:
| System Size | Installation Time | Commissioning |
|---|---|---|
| Small (50–500 Nm³/h) | 2–6 weeks | 1–2 weeks |
| Medium (500–2,000 Nm³/h) | 6–12 weeks | 2–4 weeks |
| Large (2,000+ Nm³/h) | 3–6 months | 4–6 weeks |
Enric's Advantage:
Operational costs (OPEX) typically range from $0.02–$0.08/Nm³ of biomethane produced, depending on:

Enric's Systems: Achieve $0.02–$0.05/Nm³ OPEX due to:
Governments worldwide offer subsidies, tax credits, and grants to promote biomethane. Key programs include:
| Region | Incentive Program | Value | Eligibility |
|---|---|---|---|
| 🇺🇸 United States | Renewable Fuel Standard (RFS) | $1.50–$3.00/mmbtu (D3 RINs) | Grid-injected or vehicle biomethane |
| 🇺🇸 California | Low Carbon Fuel Standard (LCFS) | $150–$250/ton CO₂e | Transportation biomethane |
| 🇪🇺 European Union | Renewable Energy Directive (RED II) | €50–€120/MWh | All biomethane projects |
| 🇬🇧 United Kingdom | Renewable Heat Incentive (RHI) | £0.05–£0.08/kWh | Biomethane for heating |
| 🇨🇦 Canada | Clean Fuel Regulations (CFR) | CAD $0.10–$0.20/liter | Transportation biomethane |
| 🇦🇺 Australia | Large-scale Renewable Energy Target (LRET) | AUD $20–$40/MWh | Grid-injected biomethane |
Enric's Support: Our team helps navigate application processes and maximize incentive capture.
Yes! Shijiazhuang Enric Gas Equipment Co., Ltd. offers full OEM/ODM services for:
Why Choose Enric for OEM/ODM?
Contact us at gasequipment@enricgroup.com to discuss your OEM/ODM requirements.
Our comprehensive after-sales service includes:
Client Satisfaction: 98% retention rate with 100+ repeat customers.
"We installed Enric's ECU-500 at our dairy farm in Wisconsin, and the results have been transformative. Our biogas, which was previously flared, now generates $1.2M/year in RIN credits. The system's 99% uptime and low maintenance have exceeded our expectations. Highly recommend!"
Project: 500 Nm³/h biogas from manure → 300 Nm³/h biomethane for grid injection.
"Enric's ECU-2000 was the only solution that met our strict EU standards for biomethane purity. The hybrid PSA+Membrane technology allowed us to achieve 99.9% methane with minimal energy use. The team's local support in Germany made installation seamless."
Project: 2,000 Nm³/h biogas from wastewater → 1,400 Nm³/h biomethane for CNG vehicles.
"In India's challenging climate, Enric's system has performed flawlessly. The containerized design made it easy to deploy at our remote landfill site, and the zero liquid discharge feature was critical for environmental compliance. We've reduced our CO₂ emissions by 15,000 tons/year."
Project: 1,500 Nm³/h landfill gas → 1,000 Nm³/h biomethane for power generation.
"Enric's OEM solution allowed us to white-label their technology for the Latin American market. The cost competitiveness and local certification support (e.g., ANP compliance) were key to our success. We've now deployed 10+ systems across Brazil and Argentina."
Project: OEM partnership for 50–500 Nm³/h biogas upgrading systems.
"Veolia has partnered with Enric for multiple wastewater treatment plants in France. Their modular systems allowed us to scale up as our biogas production grew. The remote monitoring has reduced our maintenance costs by 30%."
Project: 5× ECU-2000 systems across France, processing 10,000 Nm³/h of biogas.
Join 200+ satisfied customers worldwide who trust Enric for reliable, efficient, and cost-effective biogas upgrading solutions.
Free feasibility study and 10% discount on orders placed before December 31, 2025.
Contact: Bowen Di
Tel: +86 15614368118
WhatsApp: +86 18132059236
Email: dibowen@enricgroup.com
Contact: Jeremy Wu
Tel: +86-15303302613
WhatsApp: +86 13831019831
Email: wuzuoliang@enricgroup.com
Tel: +86-311-81663811
Email: gasequipment@enricgroup.com
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Website: www.enricgroupsjz.com
Response time: Within 24 hours for all inquiries.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day