Struggling with high biogas purification costs or failing to meet RNG pipeline standards? Our biogas upgrading membrane delivers 99.9% CH₄ purity at 30% lower OPEX than amine scrubbing—with zero chemical waste. ASME/CE-certified, deployed in 40+ countries.
Get Free Membrane Sample in 5 Days✉️ gasequipment@enricgroup.com | 📞 +86-311-81663811
Biogas projects face three critical bottlenecks that erode profitability and compliance:
Membrane separation solves all three. Our biogas upgrading membrane achieves:
“Membrane systems are the only technology that can simultaneously reduce costs and improve purity at industrial scale.” — MIT Future of Natural Gas Study
| Feature | Enric Membrane | Competitor A (US) | Competitor B (EU) |
|---|---|---|---|
| CH₄ Purity | 99.9% | 98.5% | 99.0% |
| CO₂ Rejection Rate | 99.5% | 98.0% | 98.8% |
| Membrane Lifespan | 5+ years | 3 years | 4 years |
| OPEX vs. Amine Scrubbing | -30% | -20% | -25% |
| Pressure Drop | <0.5 bar/y | 1.2 bar/y | 0.8 bar/y |
| Certifications | ASME, CE, ISO 9001, ATEX | CE, ISO 9001 | CE, ASME |
Proprietary Advantages:
Breakdown of Savings (1,000 Nm³/h Plant):
| Cost Factor | Amine Scrubbing | Enric Membrane | Savings |
|---|---|---|---|
| Chemical Consumption | $0.045/Nm³ | $0.00 | $0.045/Nm³ |
| Wastewater Treatment | $0.022/Nm³ | $0.001/Nm³ | $0.021/Nm³ |
| Energy Use | 0.35 kWh/Nm³ | 0.20 kWh/Nm³ | 43% less |
| Maintenance | $0.015/Nm³ | $0.008/Nm³ | 47% less |
“At a 10 MW RNG plant in Germany, our membrane system saved $2.1M/year vs. amine scrubbing, with a 14-month payback.” — Bowen Di, Europe Sales Director, Shijiazhuang Enric
ISO 9001
CE Mark
ASME
ATEX
Meets Standards:
Project: 5 MW Landfill Gas-to-RNG
Results:
“The membranes handled high H₂S levels (3,000 ppm) without degradation. Zero failures in 24 months.”
— Mark Johnson, Plant Manager
Project: 10 MW Agricultural Biogas Upgrading
Results:
“Certified for injection into the German gas grid (DVGW G 260). No methane slip detected in 18 months of operation.”
— Klaus Schmidt, Technical Director
| Biogas Source | Methane Content | Enric Membrane Performance | Typical Plant Size |
|---|---|---|---|
| Landfill Gas | 45-60% | 99.8% CH₄ purity, H₂S-resistant | 1-10 MW |
| Agricultural (Manure) | 50-75% | 99.9% CH₄ purity, low fouling | 0.5-5 MW |
| Wastewater Sludge | 55-70% | 99.7% CH₄ purity, humidity-tolerant | 0.1-2 MW |
| Industrial Waste | 60-80% | 99.9% CH₄ purity, high flux | 2-20 MW |
“Biomethane production is projected to grow 15% annually through 2030, with membrane separation as the fastest-growing technology.” — Fortune Business Insights, 2025
Our membranes are guaranteed for 5 years under normal operating conditions (≤80°C, ≤10 bar, <5,000 ppm H₂S). In real-world applications, 70% of clients exceed 6 years with proper maintenance. Compare this to competitors’ 3-4 year ratings.
Yes. Our ENRIC-GM-2026 membrane is optimized for 30-70% CO₂ feed gas. At 50% CO₂, it achieves 99.5% rejection with a methane recovery rate of 98%. For higher CO₂ levels, we offer multi-stage configurations.
| Factor | Membrane | Water Scrubbing |
|---|---|---|
| Methane Purity | 99.9% | 98-99% |
| Chemical Use | None | High (water + additives) |
| Wastewater | Minimal | High (requires treatment) |
| Energy Use | 0.20 kWh/Nm³ | 0.25-0.30 kWh/Nm³ |
| Footprint | Compact | Large (tall columns) |

Yes. We provide:
Test our biogas upgrading membrane risk-free at your facility:
Eligibility: Projects with ≥500 Nm³/h biogas flow. Only 5 spots available per quarter.
Reserve Your Free Pilot →💡 Money-Back Guarantee: If our membrane doesn’t meet your purity targets, we’ll refund 100% of your order (terms apply).
Biogas Plant Manager, Texas USA
“We replaced our amine scrubber with Enric’s membranes 2 years ago. Savings: $1.2M/year. The best part? No more chemical handling—our safety incidents dropped to zero.”
⭐⭐⭐⭐⭐
RNG Project Developer, France
“Certified for French grid injection on the first try. Other suppliers required costly pre-treatment—Enric’s membranes handled our raw landfill gas directly.”
⭐⭐⭐⭐⭐
Director, Green Energy India
“Delivered in 8 weeks—half the time of EU suppliers. The anti-fouling coating works: no cleaning in 18 months. Highly recommend for high-H₂S biogas.”
⭐⭐⭐⭐⭐
Get a free quote, sample, or pilot test in 5 business days.
Regional Contacts:
🇺🇸 North America: Jeremy Wu
Tel: +86-15303302613 | WhatsApp: +86 13831019831
Email: wuzuoliang@enricgroup.com
Shijiazhuang Enric Gas Equipment Co., Ltd.
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
www.enricgroupsjz.com
© 2026 Shijiazhuang Enric. All rights reserved. | Privacy Policy | Terms of Service
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day