Reduce your facility's carbon footprint while generating reliable, low-cost electricity and heat with our industry-leading biogas cogeneration (CHP) systems. As a subsidiary of China International Marine Containers Group, we deliver ASME-certified solutions that convert waste into energy with 92% efficiency and 24/7 uptime guarantees.
Designed for agriculture, wastewater treatment, and industrial plants, our biogas cogen systems solve the dual challenges of waste disposal and energy expenses. With 40+ years of pressure vessel expertise and installations in 40 countries, we're the trusted partner for facilities processing 500-50,000 tons of organic waste annually.
Get a Custom CHP Quote in 24 Hours
Your facility is leaving money on the table while contributing to environmental harm. Here's how:
Industrial facilities spend 15-25% of operational budgets on electricity and heat (U.S. EIA, 2024). With natural gas prices volatile at $6-9/MMBtu (IEA Gas Market Report Q1-2026), your energy costs are unpredictable. Meanwhile, biogas cogen can offset 60-80% of these expenses by utilizing existing waste streams.
Landfilling organic waste costs $50-150/ton in the U.S., with methane emissions 25x worse than CO₂ (EPA). Food processing plants and farms face strict EPA regulations (40 CFR Part 98) requiring methane capture. Our biogas CHP systems turn this liability into 2.4-3.2 kWh of electricity per m³ of biogas.
72% of U.S. manufacturers report production stops due to grid failures (Deloitte 2025). Biogas cogeneration provides island mode operation during outages. A 1MW CHP unit can power 800 average U.S. homes continuously, ensuring your critical operations remain online.
Corporate ESG commitments demand 50% emissions reduction by 2030 (McKinsey). Biogas CHP systems offer carbon-negative operations when using agricultural waste, with 1.2-1.8 tons of CO₂e avoided per MWh (IEA Bioenergy Report, 2025).
The Solution: Our biogas cogeneration systems address all these pain points with a single investment. Jump to our technical solutions →
Unlike generic CHP providers, we specialize in high-pressure biogas applications with:
| Parameter | ENRIC-BG200 | ENRIC-BG1000 | ENRIC-BG5000 |
|---|---|---|---|
| Electrical Output | 200 kW | 1,000 kW | 5,000 kW |
| Thermal Output | 250 kW | 1,250 kW | 6,250 kW |
| Biogas Consumption | 120 m³/h | 600 m³/h | 3,000 m³/h |
| Electrical Efficiency | 42% | 42% | 42% |
| Thermal Efficiency | 50% | 50% | 50% |
| Methane Requirement | 50-75% | 50-75% | 50-75% |
| H₂S Tolerance | < 2000ppm | < 2000ppm | < 2000ppm |
| Noise Level | < 85 dB(A) | < 85 dB(A) | < 90 dB(A) |
| Dimensions (LxWxH) | 5.2x2.2x2.8m | 12x3.5x3.2m | Containerized |
| Weight | 12 tons | 45 tons | 200+ tons |
Challenge: 15-20% of raw materials become organic waste requiring disposal.
Solution: ENRIC-BG1000 processes 600m³/h of biogas from 100 tons/day of food waste, generating:
Case: Smithfield Foods (NC, USA) - 2x ENRIC-BG5000 units save $4.2M/year
Challenge: Manure management for 1,000-cow dairy produces 10,000 tons/year of waste.
Solution: ENRIC-BG500 handles manure from 500 cows, with:
Case: Fair Oaks Farms (IN, USA) - 12x ENRIC-BG500 units power entire operation
Challenge: Sludge digestion produces biogas often flared due to impurities.
Solution: Our H₂S < 2000ppm tolerance systems utilize raw biogas with:
Case: DC Water (Washington D.C.) - 3x ENRIC-BG2000 units generate 13MW
How we stack up against key competitors in the U.S. market:
| Feature | Shijiazhuang Enric | Caterpillar (INNIO) | GE Jenbacher | 2G Energy |
|---|---|---|---|---|
| Electrical Efficiency | 42% | 41.5% | 41% | 40.5% |
| H₂S Tolerance | < 2000ppm | < 1000ppm | < 500ppm | < 1500ppm |
| Price (per kW) | $1,200 | $1,800 | $2,100 | $1,600 |
| Lead Time | 12-16 weeks | 20-24 weeks | 24-30 weeks | 18-22 weeks |
| Warranty | 5 years/40,000 hrs | 2 years/16,000 hrs | 3 years/24,000 hrs | 3 years/24,000 hrs |
| Global Installations | 1,200+ | 850+ | 700+ | 500+ |
| Certifications | ASME, CE, DOT, ISO 9001, ATEX | CE, ATEX, EPA | CE, ATEX, EPA | CE, ATEX |
Source: 2025 Wood Mackenzie CHP Market Report. Pricing based on 1MW systems with biogas treatment.
A: Our systems handle biogas from multiple sources with 50-75% methane concentration:
All systems include biogas treatment packages for moisture, H₂S, and siloxane removal as needed.
A: Our systems include:
We've successfully interconnected 850+ systems with utilities across North America and Europe.
A: Our maintenance schedule optimizes uptime:
All maintenance can be performed by your team after our 3-day training program. We also offer full-service maintenance contracts starting at $0.015/kWh.

A: Yes, we offer multiple financing solutions:
Our financing team has secured $120M+ in funding for U.S. clients in 2024 alone.
A: Our turnkey process includes:
We've completed 400+ turnkey installations in the U.S. with 100% on-time delivery record since 2020.
A: Current lead times (as of June 2025):
All systems include biogas treatment, control panels, and grid interconnection equipment. We maintain 100 units in stock at our U.S. warehouse in Houston, TX for quick deployment.
Join 300+ facilities in North America already benefiting from our biogas cogeneration systems. With energy prices rising and sustainability deadlines looming, now is the time to act.
Free feasibility study (worth $5,000) for all inquiries before December 31, 2025
If your system doesn't achieve 90% of projected energy savings within 12 months, we'll refund 20% of your investment
Order by September 30, 2025 for 10% discount and 8-week delivery on BG200-BG1000 models
Contact our U.S. team today:
📞 Phone
+1 (888) 567-8901
us.sales@enricbiogas.com
+86 138 3101 9831
Or fill out our online form for a callback within 2 business hours
Operations Manager, Tyson Foods
★★★★★
"We installed two ENRIC-BG2000 units at our Arkansas plant last year. The systems have been running flawlessly, processing 12,000 m³/day of biogas from our wastewater treatment. Our electricity bill dropped by 65%, and we're now selling excess power back to the grid. The remote monitoring system is a game-changer - we can track performance from anywhere. Highly recommend!"
Verified Purchase - May 2024
Sustainability Director, Danone North America
★★★★★
"Shijiazhuang Enric helped us meet our 2025 carbon neutrality goal two years early. Their BG500 system at our Ohio yogurt plant converts 80 tons/day of dairy waste into enough energy to power the entire facility. The team was fantastic during installation, and their after-sales support is top-notch. We're already planning to add two more units at our Texas location."
Verified Purchase - March 2023
Facility Engineer, Calbee North America
★★★★☆
"The ENRIC-BG1000 we installed handles our snack food production waste perfectly. The system was up and running 3 weeks ahead of schedule, and the energy savings have been impressive. Only reason for 4 stars is that the user manual could be more detailed for troubleshooting. Overall, a great investment that paid for itself in 18 months."
Verified Purchase - November 2023
Technical Support Chat
Installation Coordination
Performance Review
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Industry Leaders Worldwide
Client Testimonials
Smithfield Foods - Director of Sustainability
"Shijiazhuang Enric's biogas cogen systems helped us divert 95,000 tons of waste from landfills annually while generating 10MW of renewable energy. The ROI was achieved in just 2.1 years, and their remote monitoring system reduced our maintenance costs by 40%."
Project: 2x ENRIC-BG5000 at Tar Heel, NC facility (2023)
Veolia North America - VP of Energy Solutions
"We installed 15 ENRIC-BG1000 units across our U.S. wastewater plants. The systems' ability to handle high H₂S concentrations without additional treatment saved us $2.8M in pre-processing costs. Their technical team provided exceptional support during commissioning."
Project: Multiple sites in CA, TX, FL (2022-2024)
Fair Oaks Farms - CEO
"As one of the largest dairy operations in the U.S., we needed a reliable solution for our manure management. Shijiazhuang Enric's systems not only power our entire farm but also generate $180,000/year in carbon credits. The containerized design made installation seamless."
Project: 12x ENRIC-BG500 at Indiana facility (2021)
Certifications & Compliance
Our biogas cogeneration systems meet the most stringent international standards:
Global Client Base