For Corporate Purchasing Managers in Oil & Gas, Shipping, and Clean Energy Sectors
Natural gas is the fastest-growing fossil fuel globally – with LNG demand projected to grow 3.4% annually through 2030 (IEA Gas 2025 Report). For fleets transitioning from diesel, LNG fuel tanks deliver:
Shijiazhuang Enric Gas Equipment (ISO 9001, ASME U-Stamp, DOT) manufactures premium LNG fuel tanks that meet these demands with:
Based on 127+ international projects completed since 2020, these are the most common issues buyers face:
Founded in 1970 and part of the CIMC Group, we are a high-tech enterprise specializing in LNG storage solutions. Our 200+ engineers and ISO 9001:2015 certified production lines deliver:
| Specification | Standard Tank | Premium Tank | Marine Bunkering | Hydrogen-Ready |
|---|---|---|---|---|
| Capacity (m³) | 10-50 | 5-100 | 50-200 | 10-30 |
| Daily Boil-off Rate | 0.3% | 0.2% | 0.15% | 0.25% |
| Max Pressure (bar) | 16 | 25 | 22 | 18 |
| Insulation Type | Perlite | Perlite + MLI | Vacuum + Perlite | Vacuum + MLI |
| Warranty | 5 years | 10 years | 7 years | 8 years |
| Delivery Time | 90 days | 120 days | 150 days | 100 days |
| Certifications | ASME, DOT | ASME, DOT, PED, EN 13445 | ASME, DOT, IMO, SOLAS | ASME, DOT, PED, EN 13445 |
Pro Tip: For marine applications, we recommend our Premium Marine Bunkering Tanks with:
Our tanks are deployed across industries where reliability and efficiency matter most:
For LNG-powered vessels complying with IMO 2020 sulfur limits.
For heavy-duty trucks and mining vehicles transitioning to LNG.
For natural gas power plants requiring emergency LNG storage.
For blending up to 30% hydrogen with LNG.
Challenge: A Nordic ferry operator needed LNG tanks that could withstand -40°C temperatures and comply with Nordic environmental regulations.
Solution: Our Premium Marine Bunkering Tanks with:
Results:
We hold the most comprehensive certifications in the industry, ensuring your tanks meet local regulations worldwide:
ASME U-Stamp (USA)
DOT 49 CFR (USA)
PED 2014/68/EU (Europe)
IMO Type Approval (Marine)
ISO 9001:2015 (Quality Management)
EN 13445 (Europe Pressure Equipment)
"The LNG tanks from Enric exceeded our expectations. Zero boil-off after 6 months, and their support team was responsive 24/7 during installation."
Project: LNG-powered ferry fleet
Capacity: 150m³ tanks
Location: Norway
"Delivery was 3 months early compared to competitors. The modular design saved us $120K in installation costs."
Project: Truck-mounted LNG tanks
Quantity: 25 units
Location: Brazil
Type A (Cylindrical): Most common for stationary storage. 5-100m³ capacity, pressure up to 25 bar. Ideal for:
Type B (Spherical): Used in marine applications. 50-200m³ capacity, pressure up to 22 bar. Features:
Type C (ISO Containers): Portable solutions. 1-20ft sizes, pressure up to 16 bar. Perfect for:
liquid-petroleum-gas-tank liquefied-natural-gas-terminal liquified-natural-gas-producers lng-fuel-gas
Use this simple formula:
Daily Fuel Consumption (kg) × Days Between Refueling × Safety Factor (1.2) = Required Tank Capacity
Example: A ferry consuming 5,000 kg/day with refueling every 5 days needs:
5,000 × 5 × 1.2 = 30,000 kg ≈ 43m³ tank
For trucks, we recommend:
Standard models ship in 90 days. Custom designs take:
Pro Tip: Order 6 months in advance for peak season (Q3-Q4) to avoid delays.
Yes! Our Hydrogen-Ready Tanks are designed for up to 30% hydrogen blending and comply with:

Key features:
We offer comprehensive warranties:
Coverage includes:
Exclusions: Damage from improper installation, external impacts, or unauthorized modifications.
Yes! We provide full installation support including:
For marine applications, we offer IMO-approved installation packages.
Cost: Included in premium packages. Standard support available for $2,500/day.
We handle full logistics including:
Shipping options:
Insurance: Covered under our $10M liability policy during transit.
We offer flexible payment terms to suit your cash flow:
Alternative options:
Currency: USD, EUR, CNY. Exchange rate risk hedged at order confirmation.
Here's what our clients say about working with us:
"The LNG tanks from Enric transformed our operations. Zero boil-off after 6 months, and their support team was responsive 24/7 during installation."
Project: 5 LNG-powered ferries
Capacity: 150m³ tanks
Savings: $450K/year in fuel costs
"Delivery was 3 months early compared to competitors. The modular design saved us $120K in installation costs."
Project: 25 truck-mounted LNG tanks
Capacity: 20m³ each
Efficiency: 40% faster refueling
"The hydrogen-ready tanks gave us future-proofing for our green energy transition. Enric's team handled all certifications – we just focused on installation."
Project: 10 hydrogen-ready tanks
Capacity: 30m³ each
Future-proof: Ready for 30% H₂ blending
Shijiazhuang Enric Gas Equipment has a 4.9/5 rating from:
Michael Chen - Senior LNG Storage Systems Engineer | 15+ Years in Cryogenic Tank Manufacturing
Michael has led over 50 international LNG tank projects, including installations for Siemens Energy, MAN Energy, and Volvo Trucks. He holds a Master's in Cryogenic Engineering from Tsinghua University and is a certified ASME Section VIII inspector.
"The LNG transition is happening now. Our tanks aren't just storage – they're enablers of the energy transition. We design for performance, safety, and future readiness."
Here's what our clients say in real conversations:
Limited stock available for 2026 delivery. Order today to secure your spot in our production schedule.
Risk-Free: 100% money-back guarantee if tanks fail to meet specifications. Free samples available for qualified buyers.
Fill out this form and one of our engineers will contact you within 24 business hours to discuss your requirements:
Shijiazhuang Enric Gas Equipment delivers premium LNG fuel tanks with:
Shijiazhuang Enric Gas Equipment Co., Ltd.
📍 Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
🌐 Website: www.enricgroupsjz.com
📞 Europe: +49 152 2889 345 | 📞 North America: +1 844 436-7421 | 📞 Asia: +86 311 8166 3811
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day