For Purchasing Managers, Technical Directors & Operations Leaders who struggle with costly leaks, long lead‑times, and regulatory compliance, Enric’s modular storage tank farms deliver instant ROI and a guaranteed on‑time delivery.
Get Free Quote in 24 hAcross the USA and Europe, procurement teams report three recurring pain points that inflate total cost of ownership:
Result: Your supply chain becomes a bottleneck, eroding profit margins and jeopardizing compliance.
See the SolutionOur modular farms combine ASME‑certified pressure vessels, ISO‑9001‑validated manufacturing, and a plug‑and‑play design that can be expanded in 3‑month increments.
| Parameter | Standard Model (150 m³) | Custom Model (Up to 2 000 m³) |
|---|---|---|
| Design Pressure | 15 bar (gauge) | ≤ 30 bar (gauge) |
| Material | SA‑516 Gr 70 carbon steel, 3‑layer epoxy coating | SA‑312 304L SS or Duplex, PTFE inner lining (optional) |
| Operating Temperature | ‑40 °C ~ +80 °C | ‑60 °C ~ +120 °C (hydrogen‑compatible) |
| Internal Surface Finish | Ra ≤ 0.8 µm | Ra ≤ 0.4 µm (high‑purity gases) |
| Leak‑Detection System | Ultrasonic sensor, 0.1 % LEL sensitivity | Dual‑redundant laser‑based, 0.01 % LEL |
| Certification | CE, DOT, ASME‑U, ISO 9001 | CE, DOT, ASME‑U, ISO 9001, ISO 14001, IEC 61508 |
| Typical Lead‑Time | 6 weeks (factory‑ready) | 8‑10 weeks (custom engineering) |
| Warranty | 24 months or 2 000 operating hours | 36 months or 3 000 operating hours |
Enric’s farms have been deployed in four distinct market segments:
Client:
Siemens Energy Facility, Germany
Challenge: Frequent corrosion‑related leaks in 10 × 200 m³ carbon‑steel tanks, leading to $1.2 M annual loss.
Solution: Replacement with Enric’s duplex‑steel, PTFE‑lined modular tanks, integrated with dual‑laser leak detection.
Result: 30 % reduction in unplanned downtime, $0.9 M cost avoidance in year‑one, and full CE/DOT compliance.
storage-tank steel-water-storage-tank-repair steel-tank-repair storage-as-transmission
State‑of‑the‑art fabrication hall – ISO 9001 certified
Standard models ship within 6 weeks after PO receipt; custom designs require 8‑10 weeks, including engineering approval.

Yes. We offer duplex‑steel or 304L‑SS shells with PTFE lining, meeting IEC 61508 and ASME‑U standards for up to 30% hydrogen by volume.
30% T/T upon order, 40% after engineering approval, and 30% on shipment. Letters of credit (L/C) are also accepted.
We coordinate FCL/LCL container loads, provide HS‑code classification, and offer DDP (Delivered Duty Paid) service for the USA, EU, and Canada.
A 24‑month warranty covers material defects, plus optional 5‑year service contracts that include remote monitoring and on‑site inspections.
Limited‑time offer: Free 1:1 engineering consultation + complimentary 1‑month trial of our remote leak‑monitoring SaaS.
Request a Quote & SampleOr call us now: +86‑311‑81663811 (WhatsApp +86 181 3205 9236)
Laura M., North America Operations Manager – “The delivery was 2 weeks ahead of schedule. Installation took only 4 days, and the SCADA integration was plug‑and‑play.”
Peter S., EU Procurement Lead – “Compliance paperwork was flawless – CE, DOT, and ISO certifications arrived in a single packet, saving us weeks of admin.”
Yusuf A., Middle East Supply‑Chain Director – “The modular design allowed us to double capacity within three months without a new foundation. ROI hit 18 % in the first year.”
Shijiazhuang Enric Gas Equipment Co., Ltd. | No. 169 Yuxiang St., Equipment Manufacture Base, Shijiazhuang, Hebei 051430, China
Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Contact Us
Europe Contact – Bowen Di: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | dibowen@enricgroup.com
North America Contact – Jeremy Wu: +86‑153‑0330‑2613 | WhatsApp: +86 138 3101 9831 | wuzuoliang@enricgroup.com
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
What Our Clients Say