Subtitle: Eliminate low‑quality gas, reduce operating costs, and meet EU/US emissions standards – tailored for Purchasing Managers, Technical Directors, and Operations Leaders.
1. High CO₂ & H₂S Content – Up to 60 % CO₂ reduces methane calorific value, inflating fuel costs by 25 % on average (IEA Gas 2025 report).
2. Unreliable Pressure & Flow – Fluctuations cause plant shutdowns; a 2024 MIT study shows a 15 % downtime loss for facilities lacking proper upgrading.
3. Regulatory Penalties – EU RED II and US EPA enforce ≤ 5 % CO₂ in biomethane; non‑compliance can cost up to $150 k per annum in fines.
4. Expensive Shipping & Storage – Low‑grade biogas requires larger tank volumes; a 2023 Fortune Business Insights analysis estimates a 30 % increase in logistics cost.
5. Limited ROI on Existing Equipment – Older absorbers have 30 % lower methane recovery efficiency, extending payback beyond 7 years.
Discover the proven upgrade that eliminates these pain points →
Envision a single‑line system that removes CO₂, H₂S, and water vapor while boosting methane concentration to > 98 %. Below are the core advantages that matter to you.
| Parameter | Range | Unit | Typical Value |
|---|---|---|---|
| Feed Gas Flow | 200‑5,000 | Nm³/h | 1,200 |
| Methane Purity (post‑upgrade) | ≥ 95‑≥ 99.5 | % | 98.8 |
| CO₂ Removal Efficiency | ≥ 98 | % | 99.2 |
| H₂S Removal | ≤ 1 ppm | ppm | 0.5 |
| Operating Pressure | 1‑5 | bar | 3.2 |
| Power Consumption | 0.10‑0.20 | kWh/Nm³ | 0.14 |
| Temperature Range | 5‑45 | °C | 25 |
| Material | Stainless‑Steel 316L, PTFE‑coated membranes | ||
Application Scenarios
Client:
Shell Europe Biogas Hub (Germany)
Challenge: Existing amine scrubber delivered only 92 % methane, causing pipeline rejection.
Solution: Deployed a 2,500 Nm³/h modular upgrading unit with dual‑membrane stages.
Result: Methane purity rose to 99.1 %, enabling full pipeline integration and delivering a $1.2 M annual savings on gas sales.
Request a similar ROI analysis →
For projects between 500‑3,000 Nm³/h, payback ranges from 12‑18 months when methane sales price exceeds $0.40 Nm³ and CO₂‑related penalties are avoided (see IEA Gas 2025, p. 12).
Yes. Our pre‑treatment module uses iron‑based sorbents capable of reducing H₂S to <1 ppm, complying with OSHA and EU directives.
Absolutely. Our R&D center in Shijiazhuang offers tailored membrane pore sizes, control‑system SCADA integration, and branding options.
We ship via sea‑container (20 ft) or rail, with DDP incoterms to the EU, US, and Canada. Typical lead time: 4‑6 weeks from order confirmation.
24/7 remote monitoring, annual on‑site preventive maintenance, and a 24‑month spare‑parts guarantee. Emergency response within 48 hours.
Limited‑Time Offer: Free 30‑day performance trial + complimentary on‑site feasibility study.
Schedule Demo & Get Free Sample
Or call +86‑311‑81663811 / WhatsApp +86‑181‑3205‑9236 now.
Alex P., Energy Manager, Siemens AG – “The modular upgrade cut our CAPEX by 22 % and delivered 99.3 % methane on day 1.”
Linda G., Procurement Lead, GE Renewable Energy – “Compliance with EU RED II was a make‑or‑break factor; Enric’s system passed audit on first try.”
Mohamed S., Operations Director, Saudi Green Power – “Fast installation saved us 3 weeks of lost production – ROI realized in 10 months.”
Europe Region – Bowen Di
Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236
Email: dibowen@enricgroup.com
North America Region – Jeremy Wu
Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831
Email: wuzuoliang@enricgroup.com
General Inquiries: gasequipment@enricgroup.com | Phone: +86‑311‑81663811
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted Worldwide – Certifications & Partnerships
Global Brand Logos
Customer Testimonials
Certificates
tank-container super-lpg-gas tank-lpg storage-tanks-underground
Our certifications comply with EU RED II, US EPA, and ISO 9001 standards, guaranteeing safety, quality, and cross‑border trade compatibility.
Download the full certification pack →