Subtitle: Corporate purchasing managers and operations leaders can finally eliminate peak‑price shocks, boost grid resilience, and meet ESG targets with a single, proven storage solution.
Even the most efficient factories still face three silent cost‑eaters that erode margins:
These pain points translate directly into lost productivity, higher procurement spend, and missed sustainability goals.
Our high‑pressure, modular storage systems combine proven ASME‑certified pressure‑vessel technology with intelligent BMS (Battery Management System) software. The result is a turnkey solution that delivers:
| Parameter | Typical Value | Applicable Standard |
|---|---|---|
| Energy Capacity | 0.5 – 20 MWh (modular) | IEC 62933‑1‑1 |
| Round‑trip Efficiency | 92 % (Li‑ion) / 85 % (Vanadium Redox) | UL 9540‑A |
| Maximum Continuous Power | 1 MW per 5 MWh module | ASME BPVC‑III |
| Operating Temperature | -20 °C to +45 °C | ISO 9001‑2015 |
| Safety Certifications | CE, FCC, IECEx, ISO 45001 | Multiple |
| Lifecycle (Full‑depth cycles) | ≥ 6,000 cycles (Li‑ion) / ≥ 15,000 cycles (RFB) | IEC 62933‑2‑1 |
| Control Interface | Modbus TCP/IP, OPC‑UA, REST API | IEC 61850‑7‑4 |
All modules are manufactured at our Shijiazhuang factory (see image below) and shipped FOB Shanghai with full export documentation.
Typical ROI comes from demand‑charge reduction (30‑45 %), frequency‑regulation income ($0.02‑$0.04/kWh), and avoided diesel‑generator fuel ($0.60/MMBtu). A 3 MWh system in a mid‑size plant usually reaches payback in 1.5‑2 years.
Yes. Our high‑pressure vessels meet ASME‑BPVC‑III and are certified for hydrogen‑blended gas (up to 20 % H₂). The BMS can coordinate with SCADA systems to balance gas‑to‑electric conversion in real time.

Our units carry CE, FCC, GS, ISO 9001, ISO 45001, IECEx, and regional CE‑Mark equivalents. For the U.S., we hold UL 9540‑A and DOT hazardous‑material approvals.
Standard 5‑10 week lead‑time for 1‑5 MWh modules (factory‑ready). Expedited 3‑week shipping is available for an additional 8 % surcharge.
24/7 remote monitoring, on‑site commissioning, 5‑year parts warranty, and optional performance‑guarantee contracts (up to 99.9 % availability).
Free 30‑day trial unit for qualified buyers. No upfront capital required – we offer lease‑to‑own financing at 0 % APR.
Offer expires 31 Oct 2026 or until inventory runs out.
David K., Procurement Manager, PetroChem Co. – “The Enric storage solution cut our annual energy bill by $250 k and gave us the flexibility to participate in the German “Flex‑Power” market.”
Linda S., CTO, Renewable Energy Ltd. – “Zero‑downtime during our solar‑farm expansion, thanks to the modular UPS capability.”
Ahmed R., Operations Director, North Africa Mining Corp. – “We replaced diesel generators with Enric storage and saved $1.1 M in fuel costs within the first year.”
Europe Region – Bowen Di
Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America Region – Jeremy Wu
Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
Head Office
Tel: +86 311 8166 3811 | Email: gasequipment@enricgroup.com
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Contact Form
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders Worldwide
Our systems are deployed in over 40 countries, backed by a portfolio of certifications that guarantee safety, quality, and regulatory compliance.
types-of-energy-storage-system utility-scale-energy-storage-systems sustainable-energy-storage thermal-energy-storage-system
Certificates & Compliance
Customer Testimonials