For Purchasing Managers, Technical Directors and Operations Leaders who struggle with soaring electricity bills, frequent outages, and long lead‑times for equipment, our distributed power generation solutions deliver on‑site, scalable energy that cuts CAPEX by up to 30 % and guarantees 99.9 % uptime.
Get Free Quote in 24 hEven the most disciplined procurement teams report three recurring headaches:
These issues translate directly into lost profit, missed production targets, and a weakened competitive edge.
| Parameter | Standard Model (0.5 MW) | Mid‑Scale Model (2 MW) | Enterprise Model (5 MW) |
|---|---|---|---|
| Prime Power Output | 0.5 MW | 2 MW | 5 MW |
| Fuel Flexibility | NG / Biogas (up to 30 % blend) | NG / Biogas / Hydrogen (up to 20 % blend) | NG / Biogas / Hydrogen (up to 30 % blend) |
| Efficiency (LHV) | 38 % | 41 % | 44 % |
| Emissions (CO₂/kg kWh) | 0.45 | 0.38 | 0.32 |
| Noise Level (dB(A) @ 1 m) | 68 | 62 | 58 |
| Warranty | 24 months | 36 months | 48 months |
Below are three typical deployments where distributed power generation turned a cost centre into a profit‑center.
Request a Free Technical Brochure
Standard modular units ship in 4‑6 weeks after order confirmation. Expedited shipping (air freight) can reduce this to 10 days for critical projects.
Yes. All models support up to 30 % hydrogen or 30 % biogas blends without hardware changes. The control software auto‑optimizes combustion for maximum efficiency.
We offer FOB pricing in USD, with optional L/C or DP terms. Volume discounts start at 10 % for orders ≥ 5 MW and 18 % for ≥ 10 MW. Shipping is consolidated to reduce freight cost by up to 22 %.
All units come with a 24‑month comprehensive warranty covering parts, labor, and remote diagnostics. We provide 24/7 on‑site support in North America, Europe, and Asia‑Pacific through our global service network.
Yes. We partner with major banks and leasing firms to offer 0 % interest up to 5 years for qualified corporate customers. A detailed ROI calculator is provided on request.

Our engineering team works with local consultants to align each unit with regional standards (CE, UL, IEC, ISO 50001, etc.). Certification documents are delivered with the shipment.
Our open‑API architecture supports OPC‑UA, Modbus TCP, and RESTful services, allowing seamless data flow into SAP, Oracle, or custom SCADA solutions.
CO₂ emissions are reduced by **70‑85 %** depending on fuel mix, and NOₓ/SOₓ drop to below 5 ppm, meeting the most stringent EU‑III standards.
Limited‑time Offer: Free 7‑day on‑site demo unit (0.5 MW) for the first 10 qualified buyers. No commitment, no hidden fees.
Contact Options: Email | WhatsApp | Call +86 156 1436 8118
Linda S., North America – Procurement – “The installation was finished in 5 days. Our energy spend dropped from **$2.4 M** to **$1.7 M** in the first quarter.”
Thomas B., Europe – Operations Manager – “Zero‑downtime during the 2025 winter storm. The remote monitoring dashboard saved us **15 hours** of manual checks per month.”
Chen Y., Asia‑Pacific – Technical Director – “Hybrid hydrogen‑NG mode gave us a 45 % reduction in carbon intensity. Certification paperwork was ready in 2 weeks.”
Ahmed R., Middle East – Supply Chain Lead – “Shipping cost fell by **23 %** thanks to Enric’s consolidated container strategy. The ROI model proved a payback in 14 months.”
© 2026 Shijiazhuang Enric Gas Equipment Co., Ltd. All rights reserved. Privacy Policy | Terms of Service
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Social Proof – Trusted by Global Leaders
uses-of-hydrogen-energy sustainable-hydrogen-production what-are-energy-storage-systems ul-listed-energy-storage
What Our Clients Say
See the Full Certification Pack