Eliminate high‑price, low‑quality, slow‑delivery pain points and empower your plant, data‑center or mining operation with OEM‑grade power generation equipment.
Get Free Quote in 24 h1. High Capital Expenditure – Typical turnkey plants quote $1.2 M for a 5 MW gas‑turbine system, yet 30‑40 % of that budget disappears in hidden engineering fees and over‑specification.
2. Low Reliability & Downtime – Industry data from the IEA 2024 Hydrogen Review shows that un‑optimized power generation can cause up to 12 % annual production loss in chemical plants.
3. Slow Delivery & Shipping – Average lead‑times for imported generators exceed 90 days, inflating inventory costs by up to 18 %.
4. Regulatory Compliance Gaps – Missing CE, ASME or ISO‑9001 certification can halt projects in Europe or the U.S. within weeks.
5. Energy Inefficiency – Legacy units often run at 30‑35 % thermal efficiency, while modern combined‑cycle designs push >55 % (see the table below).
See the Solution →| Model | Rated Power (MW) | Fuel Type | Thermal Efficiency | Emissions (g CO₂/kWh) | Certifications |
|---|---|---|---|---|---|
| EN‑GT‑3 | 3.0 | NG / H₂ (≤30 %) | 52 % | ≈ 380 | ASME, CE, ISO‑9001 |
| EN‑GT‑5 | 5.0 | NG / H₂ (≤30 %) | 55 % | ≈ 350 | ASME, DOT, ISO‑9001, CE |
| EN‑REC‑10 | 10.0 | NG + Bio‑Methane | 58 % | ≈ 300 | CE, ISO‑50001, RoHS |
Standard stock units ship within 48 hours after order confirmation. Custom‑engineered packages require 30‑45 days for design, testing, and certification.
Yes. All models support up to 30 % hydrogen by volume without hardware modification, meeting the latest IEA 2024 hydrogen‑blending guidelines.
Every unit ships with CE, ISO‑9001, ISO‑14001, and, where required, ATEX and IECEx approvals. Documentation is provided in English and the local language of the destination.
We operate a 24/7 global service hub. Spare‑part kits are stocked in Europe and North America; typical replacement lead‑time is 7 days. Remote diagnostics are enabled via our SaaS platform.
We accept T/T, LC, and major credit cards. For large contracts, we offer 30‑day net terms after credit approval.
⚡ Order now and receive a free 3‑month performance monitoring package worth €8,500. Money‑back guarantee if the system does not meet the quoted efficiency within the first 90 days.
Email Quote Request | WhatsApp Us | Online Form

Offer expires 30 days from page view or until inventory of 5 units per model is exhausted.
Laura M., Procurement Manager – ABC Metals (Germany)
“The EN‑REC‑10 reduced our fuel bill by **22 %** and the on‑site commissioning team finished two weeks ahead of schedule. The CE and ATEX certificates saved us weeks of paperwork.”
Michael T., Technical Director – GreenTech Solutions (USA)
“We needed a hybrid NG‑hydrogen system for a remote data‑center. Enric delivered a 3 MW unit that runs 30 % hydrogen with zero retro‑fit. Downtime dropped from 12 h/month to 2 h.”
Sarah K., Operations Lead – PetroLink (UK)
“The fast 48‑hour dispatch saved us from a production halt. The built‑in IoT module (via IBM Cloud) gives us real‑time efficiency data – +5 % over baseline.”
Contact Our Global Offices
Europe Region – Bowen Di | Tel: +86 15614368118 | WhatsApp: +86 18132059236 | Email: dibowen@enricgroup.com
North America Region – Jeremy Wu | Tel: +86 15303302613 | WhatsApp: +86 13831019831 | Email: wuzuoliang@enricgroup.com
General Inquiries – Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
All product data comply with local regulations, pricing methods, and payment terms. For detailed compliance documents, request a PDF via the contact form.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
“Enric’s modular turbines cut our commissioning time from 120 days to 45 days and reduced fuel costs by 22 %.” – Operations Manager, Shell Europe
“The dual‑fuel capability allowed us to blend 20 % green hydrogen without redesigning the plant.” – Technical Director, Siemens Energy
what-is-distributed-power types-of-energy-storage-system what-does-cng-stand-for sustainable-energy-storage