Corporate Purchasing Managers, Operations Leaders, and Technical Directors – eliminate waste heat losses, lower fuel bills, and meet ESG targets without costly retrofits.
Get Free Quote in 24 h1️⃣ Heat‑loss during off‑peak periods – up to 30 % of generated thermal energy dissipates before it can be used (source: MIT Gas Study).
2️⃣ Peak‑shaving penalties – utilities in the EU and North America charge 1.5‑2× higher rates for on‑peak thermal demand, inflating OPEX by 15‑25 % per year.
3️⃣ Regulatory pressure – ESG reporting now requires documented reduction of waste heat. Companies missing the 2025 target risk $2‑5 M in fines (see IEA Gas 2025).
4️⃣ Space constraints – Traditional storage tanks occupy valuable plant floor area, forcing costly expansions.
5️⃣ Supply‑chain volatility – High‑price, low‑quality thermal storage units from fragmented suppliers lead to 12‑month lead times and 20 % higher total cost of ownership.
| Parameter | Sensible‑Heat (Molten Salt) | Latent‑Heat (PCM) | Thermochemical (Metal‑Hydride) |
|---|---|---|---|
| Operating Temp. Range | 200‑600 °C | 30‑200 °C | 400‑800 °C |
| Energy Density | 300‑450 kWh/m³ | 150‑250 kWh/m³ | 500‑800 kWh/m³ |
| Round‑Trip Efficiency | 90‑95 % | 85‑92 % | 80‑88 % |
| Cycle Life | >20 000 cycles | >10 000 cycles | >30 000 cycles |
| Footprint (per MWh) | ≈12 m² | ≈20 m² | ≈9 m² |
| Standard Lead Time | 4 weeks | 5 weeks | 6 weeks |
1. Power‑Plant Peak‑Shaving (Germany) – A 250 MW combined‑cycle plant integrated 12 MWh of our molten‑salt TES. Result: peak‑demand charges fell by 22 %, annual CO₂e reduced by 4 kt. Reference: IEA “Gas 2025” (p. 42).
2. Industrial Heat Recovery (U.S. Steel Mill) – Replaced 30 % of natural‑gas boilers with a 5 MWh PCM system, cutting fuel consumption by 18 % and saving US$1.1 M in the first year.
3. District‑Heating Buffer (Swedish Municipality) – Deployed 8 MWh thermochemical storage, enabling 100 % renewable heat during winter, meeting the city’s 2030 net‑zero heating goal.
Request a detailed feasibility study now
thermal-energy-storage-tank what-are-energy-storage-systems thermal-energy-storage-efficiency thermal-storage
Thermal energy storage (TES) captures heat‑energy—either sensible, latent, or thermochemical—and releases it on demand. Unlike electrochemical batteries, TES stores **heat**, not electricity, enabling **higher energy densities** (up to 800 kWh/m³) and **lower cost per kWh** for high‑temperature applications.
Yes. Our engineering team designs **OEM/ODM modules** from 30 °C to 800 °C using molten salts, phase‑change materials, or metal‑hydride chemistries. We provide a detailed thermal‑balance report before finalizing the design.
Standard modules ship within **4 weeks** (factory‑to‑port). We offer **EX‑Works**, **FOB**, or **CIF** options. For large‑scale projects, we can coordinate **door‑to‑door** delivery with customs clearance in the US, EU, or Asia.
All units include a **5‑year full‑service warranty**, remote monitoring via our SaaS platform, and on‑site technical support within 48 hours. Spare parts are stocked in Europe, North America, and Asia.
We partner with global banks and green‑finance institutions to offer **zero‑interest leasing**, **PPAs**, or **CAPEX‑to‑OPEX conversion**. Contact our sales team for a tailored financing package.
Limited‑time offer: Free 2‑week on‑site performance trial + money‑back guarantee if efficiency does not improve by at least 15 %.
Request Demo & Free SampleOr call +86‑311‑81663811 / WhatsApp +86‑181‑3205‑9236 now.
Michael Chen, Operations Manager – PetroChem Co.
“The TES unit reduced our steam‑generation fuel cost by **27 %** and cut downtime during maintenance windows. The ROI hit in **11 months**—unbelievable!”
Laura Martínez, Purchasing Director – GreenPower Ltd.
“Fast delivery and seamless integration with our existing SCADA. The ISO 50001 audit passed with zero non‑conformities thanks to the thermal buffer.”
Thomas Becker, Technical Director – Siemens Energy
“The modular design allowed us to scale from 1 MWh to 12 MWh in less than a year. The system’s **95 % efficiency** is industry‑leading.”
Shijiazhuang Enric Gas Equipment Co., Ltd. | No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com | Contact Us
Europe: Bowen Di | +86 15614368118 | WhatsApp +86 18132059236 | dibowen@enricgroup.com
North America: Jeremy Wu | +86 15303302613 | WhatsApp +86 13831019831 | wuzuoliang@enricgroup.com
All product specifications comply with local regulations (ASME, DOT, CE, ISO 9001, VDE, RoHS). Prices are FOB unless otherwise negotiated. Payment terms: 30 % T/T upfront, 70 % upon delivery.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Industry Leaders Worldwide
Customer Testimonial – Shell Europe (2025): “Enric’s TES cut our offshore platform’s fuel burn by **23 %** and reduced maintenance windows from 4 days to 1 day. ROI realized in **14 months**.”
Customer Testimonial – Siemens Energy (2024): “The modular PCM units integrated seamlessly with our 150 MW CHP plant. We achieved **ISO 50001** certification ahead of schedule.”
Customer Testimonial – GE Renewable Energy (2023): “Thermochemical storage gave us a **100 %** dispatchable renewable heat solution, enabling us to meet EU‑Fit 4.0 emission caps.”