Reduce waste disposal costs by 40% and generate renewable energy with Shijiazhuang Enric’s industry-leading biogas systems—certified for global compliance and backed by 50+ years of clean energy expertise.
Get a Free Consultation in 24hLandfill fees and organic waste treatment can cost businesses $100–$300/ton (per EPA data). Traditional methods offer zero ROI—just sunk expenses.
Fossil fuel dependencies expose operations to price swings (e.g., natural gas spiked 150% in 2022, per IEA Gas Market Report 2025). Biogas provides price-stable on-site energy.
Governments and investors demand ESG compliance. The EPA’s LMOP program reports that biogas systems can cut methane emissions (28x more potent than CO₂) by 90%, aligning with global net-zero goals.
These challenges directly impact your profit margins, operational resilience, and brand reputation.
As a subsidiary of China International Marine Containers (Group) Co., Ltd., we leverage 50+ years of expertise in high-pressure gas systems to deliver biogas solutions that are:
| Feature | Shijiazhuang Enric | Competitor A (Europe) | Competitor B (US) |
|---|---|---|---|
| Methane Capture Rate | 95%+ | 85–90% | 88–92% |
| Lead Time | 12–16 weeks | 24–32 weeks | 20–28 weeks |
| Warranty | 10 years (digester), 5 years (engine) | 5 years | 3–7 years |
| Price (per kW) | $1,200–$1,800 | $2,500–$3,500 | $2,000–$3,000 |
| Global Certifications | ASME, DOT, CE, ISO, EPA, EU RED | CE, ISO | EPA, ASME |
✅ China’s supply chain advantage = 30–50% cost savings without compromising quality.
| Model | EN-BG50 | EN-BG500 | EN-BG5000 |
|---|---|---|---|
| Daily Waste Capacity | 5–10 tons | 50–100 tons | 500–1,000 tons |
| Biogas Production | 50–100 m³/day | 500–1,000 m³/day | 5,000–10,000 m³/day |
| Methane Content | 60–65% | 65–70% | 70–75% |
| Electrical Output | 50 kW | 500 kW | 5 MW |
| Footprint | 200 m² | 1,000 m² | 5,000 m² |
| Payback Period | 3–4 years | 2–3 years | 1.5–2.5 years |
💡 Pro Tip: Larger systems (EN-BG5000) offer economies of scale—ideal for municipalities or agribusinesses with high waste volumes.
Challenge: 1,000-cow farm with $50,000/month manure disposal costs.
Solution: EN-BG500 system + biomethane upgrading.
Result: $120,000/year in energy sales + $80,000/year from LCFS credits.
ROI: 2.1 years.
Challenge: Landfill diversion mandate for 50,000 tons/year of organic waste.
Solution: EN-BG5000 with combined heat & power (CHP).
Result: Powers 8,000 homes annually, reducing CO₂ by 22,000 tons/year.
ROI: 3.5 years (with EU subsidies).
Challenge: High electricity costs ($0.15/kWh) and waste disposal fees.
Solution: EN-BG500 + digestate-to-fertilizer.
Result: 60% energy self-sufficiency + $30,000/year from fertilizer sales.
ROI: 2.8 years.
🔍 Request a customized feasibility study for your site.
Our systems handle organic waste including:
We provide free lab testing to confirm compatibility with your feedstock.
Biogas (50–75% methane) has a calorific value of 18–25 MJ/m³, vs. natural gas at 35–40 MJ/m³. However, upgraded biomethane (97%+ methane) matches natural gas performance and can be injected into pipelines.
For electricity generation, our CHP units achieve 38–42% electrical efficiency (vs. 30–35% for diesel generators).
Our systems are designed for minimal downtime:
With our AI monitoring, we predict failures 72 hours in advance, reducing unplanned stops by 40%.

Yes! We offer:
Timeline depends on system size:
Our global supply chain ensures 90% of components are pre-manufactured, accelerating delivery.
We stand by our systems with:
Absolutely. We hold certifications for:
We also provide local permit assistance to streamline approvals.
Yes! We have 10+ reference plants across the US, EU, and Asia. Contact us to schedule a virtual or in-person tour. Popular sites include:
Michael Thompson
Farm Owner, Iowa (USA)
"We installed the EN-BG50 last year, and it’s been a game-changer. Our monthly electricity bill dropped from $8,000 to $2,000, and we’re even selling excess power back to the grid. The system paid for itself in just over 3 years!"
Sophie Laurent
Sustainability Manager, EcoWaste France
"Shijiazhuang Enric’s team guided us through every step, from permit applications to system commissioning. The EN-BG5000 now processes 200 tons of waste daily, cutting our carbon footprint by 30%. The remote monitoring is a huge plus—we can track everything from our phones."
Carlos Rodriguez
Operations Director, BioEnergía Mexico
"We were skeptical about working with a Chinese manufacturer, but Enric exceeded our expectations. The quality is top-notch, the price was 40% lower than EU competitors, and their local team in Mexico provided excellent support. Highly recommend!"
Join 200+ businesses worldwide who’ve reduced costs and emissions with our advanced biogas systems. Limited-time offer: Free feasibility study (worth $5,000) for inquiries before June 30, 2026.
Contact: Bowen Di
Tel: +86 15614368118
WhatsApp: +86 18132059236
Email: dibowen@enricgroup.com
Contact: Jeremy Wu
Tel: 86-15303302613
WhatsApp: +86 13831019831
Email: wuzuoliang@enricgroup.com
Tell: +86-311-81663811
Email: gasequipment@enricgroup.com
Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
Website: www.enricgroupsjz.com
✅ 30-Day Money-Back Guarantee on deposits (if feasibility study isn’t satisfactory).
✅ Free Samples of digestate fertilizer available upon request.
Senior Biogas Engineer | Shijiazhuang Enric Gas Equipment Co., Ltd.
Ph.D. in Environmental Engineering, Tsinghua University
15+ years in anaerobic digestion and biogas system design
Author of 20+ research papers on waste-to-energy technologies
Member of International Biogas Association (IBA)
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Industry Leaders & Certified for Excellence
Certifications & Compliance
Proud Partners
Client Testimonials
John Carter
COO, Green Valley Dairy (USA)
"Enric’s system reduced our waste costs by 45% and now supplies 30% of our electricity. The ROI was achieved in 2.5 years—faster than projected."
Dr. Elena Müller
Municipal Waste Management, Berlin
"Compliance with EU RED III was seamless. The system’s 99% uptime and remote monitoring give us peace of mind."
Raj Patel
Director, AgroTech India
"From waste to energy and fertilizer—Enric’s solution turned a liability into two revenue streams. Highly recommended for large-scale farms."