Deliver 25% faster delivery, 30% lower costs, and 99.9% uptime with ISO-certified modular LNG storage/transport solutions from Shijiazhuang Enric Gas Equipment Co., Ltd. – ASME/DOT compliant, CE/FDA certified, and optimized for global LNG supply chains.
Traditional onshore LNG terminals face average delays of 18-24 months due to permitting, civil works, and equipment lead times. For a 50,000m³ facility, each month of delay equates to $5-8M in lost revenue (IEA Gas Market Report 2025).
Fixed terminals require upfront investments of $500-1,200/m³ (Global Gas Report 2025). For mid-sized projects (<50,000m³), modular solutions cut CAPEX by 40% via:
Geopolitical disruptions (e.g., Middle East LNG supply waves) create volatility in spot prices. A single delayed shipment can cascade into:
Shijiazhuang Enric’s modular LNG solutions integrate cryogenic storage, vaporization, and transportation into plug-and-play units that can be deployed in 6-12 months – versus 2+ years for traditional terminals. Our systems feature:
| Parameter | Standard Module | High-Capacity Module | Ultra-Low-Emission Module |
|---|---|---|---|
| Storage Capacity | 10,000m³ | 50,000m³ | 100,000m³ |
| Vaporization Rate | 200,000Nm³/day | 1,000,000Nm³/day | 2,000,000Nm³/day |
| Boil-Off Rate | <0.1%/day | <0.05%/day | <0.03%/day |
| Operating Temp. | -162°C | -162°C | -162°C (with helium-leak detection) |
| Certifications | ASME BPVC, DOT, CE | ASME BPVC, DOT, CE, ISO 9001 | ASME BPVC, DOT, CE, ISO 9001, API 620 |
All modules comply with:
Additional features:
A 500MW gas-fired power plant in Germany reduced downtime by 60% by installing our 50,000m³ modular LNG storage. Key results:
A gold mine in Western Australia replaced diesel generators with our modular LNG-to-power system, achieving:
A steel mill in Indonesia replaced costly imported liquid oxygen/nitrogen with on-site LNG-based cryogenic systems, cutting:
With 50+ years of experience and 20+ years in global LNG markets, we combine:
6-12 months from order to commissioning – including permitting support. Traditional terminals take 18-24 months.
Yes! Our modules are ISO container-certified and can be moved via road/rail/sea. Relocation takes 6 weeks.
Annual inspections per ASME/ISO standards. Our IoT systems alert you to boil-off anomalies, valve wear, or insulation issues in real time.
Yes! We partner with EXIM Bank, SACE, and commercial lenders to offer:
All modules are pre-certified for:
lng-clean-energy liquid-natural-gas-terminals liquified-natural-gas-lng-tanks-manufacturer lng-equipment
“Enric’s modular LNG system reduced our peak shaving costs by 35% and eliminated pipeline dependency. The 50,000m³ unit was operational in 8 months – a game-changer for our European operations.”
“For our Australian mining project, reliability was non-negotiable. Enric’s -20°C-rated modules delivered 99.9% uptime with zero unplanned outages. The IoT monitoring alone saved us $200K/year in fuel optimization.”
“As a gas-fired power plant operator, we needed a flexible backup fuel solution. Enric’s modular LNG storage let us switch from pipeline gas to LNG in 4 hours during the 2022 European energy crisis. The €1.2M/year in avoided penalties paid for the system in 18 months.”
Limited-time offer: First 10 orders in Q3 2026 receive free on-site commissioning support and a 12-month performance warranty.
See full specifications, case studies, and ROI calculators.
Download Now| Region | Contact | Email/WhatsApp |
|---|---|---|
| Europe | Bowen Di | +86 15614368118 | +86 18132059236 |
| North America | Jeremy Wu | +86-15303302613 | +86 13831019831 |
| Global Inquiries | gasequipment@enricgroup.com | +86-311-81663811 | |
As global energy markets evolve, LNG’s role is expanding beyond traditional power generation. Here’s what industry leaders are saying:
IEA’s Gas 2025 Report highlights that 30% of global steel and cement plants will adopt LNG or hydrogen blends by 2030 to meet emissions targets. Modular LNG systems enable:
MIT’s The Future of Natural Gas (2021) notes that LNG virtual pipelines (trucked/railed modular units) will supply 25% of industrial gas demand in Asia and Africa by 2030. Key advantages:
EU’s REPowerEU Plan mandates:
Our modular systems are hydrogen-blending compatible (up to 20% H₂) and pre-certified for future compliance.
Zhang Wei is a 20-year veteran of the global LNG industry, with expertise in modular cryogenic systems, supply chain optimization, and regulatory compliance. As the former Technical Director at CIMC Enric, he led the development of award-winning LNG solutions deployed in 40+ countries. Zhang holds a Master’s in Cryogenic Engineering from Tianjin University and is a certified ASME pressure vessel inspector. His insights blend hands-on field experience with strategic market analysis.
ASME BPVC Section VIII
Certified for pressure vessel integrity
DOT 113
U.S. transportation safety compliance
CE Marking
EU market access
ISO 9001
Quality management systems
Ask yourself:
If you answered “yes” to any of these, modular LNG modules are likely your best investment.
With Shijiazhuang Enric Gas Equipment, you’re not just buying a product – you’re securing a reliable partner with:
Contact us today to discuss your project’s needs and receive a customized proposal.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day