π Fast Delivery | β ASME/DOT Certified | π° Bulk Discounts Available | π Global Shipping
You're paying 20-40% too much for LNG/LPG storage tanks, vaporizers, and regasification equipment due to middlemen markups. Shijiazhuang Enric Gas Equipment Co., Ltd.βa 1970-founded ASME/DOT-certified manufacturerβeliminates these costs with direct-from-factory pricing and 24-hour lead times on standard models. Get free CAD drawings, pressure vessel design validation, and A-grade 304/316L stainless steel built to EN13445/ASME standards.
π‘ Real Talk: If you're buying LNG/LPG equipment from traders or small workshops, you're likely experiencing these "invisible" expenses:
Submit your specs (volume, pressure, material requirements) and our engineers will:
Once approved, we activate our 300,000 mΒ² facility with:
π Pro Tip: Ask about our modular designsβprefab sections reduce on-site assembly time by 40%.
We handle everything from port to site:
π¬ Engineering Deep Dive: Below are the real-world performance metrics our clients use to justify the investment:
| Product Category | Model | Capacity | Pressure Range | Material | Certifications | Lead Time |
|---|---|---|---|---|---|---|
| LNG Storage Tank | ER-LNG-50 | 50 mΒ³ | 0.8-2.5 MPa | 304/316L Stainless Steel | ASME U, EN13445, PED | 40 Days |
| LPG Vaporizer | ER-LPG-V-100 | 100 kg/h | 0.1-1.6 MPa | Carbon Steel + Aluminum Fins | DOT, ASME, ISO 9001 | 35 Days |
| LNG Regasification Unit | ER-LNG-RG-200 | 200 mΒ³/h | 0.2-2.0 MPa | 316L + Duplex Steel | ASME U2, EN13445 | 45 Days |
| LPG Storage Sphere | ER-LPG-S-1000 | 1,000 mΒ³ | 0.5-2.0 MPa | SA-516 Gr.70 | ASME U, API 620 | 60 Days |
π‘ Industry Secret: Our 316L stainless steel vessels have 3x longer lifespan than carbon steel alternatives due to cryogenic toughness (-196Β°C). Ask us for a cost-per-cycle analysis comparing materials.
π Case Study 1: German Autogas Refueling Station
Challenge: Client needed 4x 100 mΒ³ LPG storage tanks for a Berlin refueling station but faced 3-month delays and 20% price hike from local suppliers.
Solution: We delivered ASME-certified tanks in 40 days at 25% below market price. Additional savings from prefab foundations reduced installation time by 3 weeks.
ROI: β¬45,000 saved in Year 1 through faster commissioning and reduced downtime.
π Case Study 2: UK LNG Truck Loading Terminal
Challenge: Terminal operator required 2x 500 mΒ³ LNG storage tanks with vapor recovery but Turkish supplier quoted 180 days with no warranty.
Solution: Our modular design allowed on-site assembly in 30 days. Vapor recovery efficiency reached 99.2% (vs. 95% industry standard).
ROI: Β£120,000 saved over 5 years from energy efficiency and reduced maintenance.
π¬ Technical Deep Dive: Why Our Vessels Outperform Competitors
β οΈ Red Flags in LNG/LPG Equipment: How to Spot Fake Certificates
Siemens Energy, Germany
"Enric delivered 3x faster than our German supplier at 30% lower cost. Their IoT monitoring helped us optimize LNG truck loading schedules."
β Dr. Klaus Weber, Project Manager
Shell Global Solutions
"We've standardized on Enric for LPG storage spheres across 12 facilities. Their modular designs reduced installation time by 40%."
β Maria Gonzalez, Global Procurement
GE Vernova, USA
"Enric's vaporizers handle our 24/7 operations flawlessly. The 10-year warranty gave us peace of mind."
β John Reynolds, Operations Director
π’ Trusted by 40+ Countries: Our clients span from Norway's Fjord terminals to Nigeria's LNG export hubs.
Yes! We specialize in OEM/ODM designs for:
Pro Tip: Submit your P&ID diagrams for a free design review within 48h.
We offer flexible terms to match your cash flow:
β οΈ Important: We only ship after final payment or confirmed LC.
We partner with Sinotrans and Kuehne+Nagel for:
For Arctic or desert sites, we provide climate-controlled crates and sandblasting kits for on-site prep.
| Product Type | Standard Lead Time | Custom Lead Time | Rush Option |
|---|---|---|---|
| LNG Storage Tank (β€100 mΒ³) | 40 Days | 60-75 Days | 15 Days (+20% fee) |
| LPG Vaporizer (β€200 kg/h) | 35 Days | 50-65 Days | 10 Days (+25% fee) |
| LNG Regas Unit (β€500 mΒ³/h) | 45 Days | 70-90 Days | 20 Days (+30% fee) |
| LPG Storage Sphere (β₯500 mΒ³) | 60 Days | 90-120 Days | 25 Days (+35% fee) |
Absolutely! Our support includes:
π‘ Pro Tip: Our IoT dashboard provides real-time efficiency metrics to optimize your operations.
lng-vessel largest-producer-of-lng lng-custom-parts-manufacturing lng-storage-tank-suppliers
We provide complete certification packages including:
All certificates are digitally verifiable with unique serial numbers linked to manufacturer records.
Yes! We've supplied Hβ-NG blending vessels for:
Our vessels are ASME-compliant for Hβ service and include hydrogen embrittlement testing.
We stand behind our products with:
β οΈ Conditions: Warranty voids if unauthorized modifications or improper maintenance occur.
Order by December 31, 2025 and receive:
We're so confident in our quality that we offer:
*Applies to standard products only. Custom orders subject to 15% restocking fee.
Dr. Anna Schmidt
Technical Director, German Energy Solutions GmbH
"We've used Enric for 5 years across multiple LNG projects. Their ASME-certified tanks have never had a single leak or pressure issue. The IoT monitoring saved us β¬25,000 in energy costs last year by optimizing boil-off rates."

π Rating: 5/5 βββββ
Mr. Carlos Mendoza
Procurement Manager, Mexican LPG Distributor
"Enric's LPG storage spheres arrived on-site 2 weeks early with perfect documentation. The 10-year warranty gave our finance team confidence to approve the project."
π Rating: 5/5 βββββ
Ms. Elena Petrov
Operations Director, Russian Gas Terminals LLC
"Our LNG regasification unit handles 200 mΒ³/h with zero downtime. The Russian certification was seamless thanks to Enric's local expertise."
π Rating: 5/5 βββββ
π‘ Insider Tip: All our reviews are verifiableβwe can connect you with these clients for reference calls.
π¬ Chief Engineer, Shijiazhuang Enric Gas Equipment Co., Ltd.
"I've designed LNG storage tanks for Arctic conditions and LPG spheres for desert climates. The key to cost savings isn't just cheaper steelβit's engineering for your specific use case."
"In 2005, I led the team that designed China's first ASME U-stamped LNG tank. Today, we're the only Chinese manufacturer with 10-year warranties on all vessels."
π My Engineering Credentials:
π‘ My Advice to Buyers: "Don't buy the cheapest vesselβbuy the one that saves you money over its lifetime. That's why we offer 10-year warranties and IoT monitoring. A β¬50,000 vessel with 30% higher efficiency pays for itself in 2 years."
Bowen Di | Senior Sales Engineer
π +86 156 1436 8118
π± WhatsApp +86 181 3205 9236
π§ dibowen@enricgroup.com
β° Available: Mon-Fri 8:00-18:00 (CET)
Jeremy Wu | US Sales Representative
π +86 153 0330 2613
π± WhatsApp +86 138 3101 9831
π§ wuzuoliang@enricgroup.com
β° Available: Mon-Fri 8:00-18:00 (EST)
General Inquiries
π +86-311-81663811
π§ gasequipment@enricgroup.com
π Addr: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei, China
π Visit Our Contact PageOr fill out our quick RFQ form and we'll respond within 24 hours:
π Submit RFQ FormComplete this form and our engineers will respond with a detailed technical proposal within 24 hours:
1. The Future of Natural Gas: An Interdisciplinary MIT Study
Key Takeaway: Natural gas acts as a bridge fuel in carbon-constrained economies, with LNG markets providing price stability. The report emphasizes global LNG trade and methane mitigation as critical factors.
2. Global Hydrogen Review 2025
Key Takeaway: Global hydrogen demand reached 95-100 Mt in 2024, with low-emissions production still under 1%. The report highlights electrolyzer scale-up and CCUS integration as key to meeting 2030 targets.
3. Industrial Gases Market Report 2034
Key Takeaway: The industrial gases market is projected to reach USD 193.72 billion by 2034 at 5.95% CAGR, driven by semiconductor manufacturing and green hydrogen demand.
4. A Brief Review of Hydrogen Production Methods
Key Takeaway: The review compares blue vs. green hydrogen pathways, highlighting electrolyzer costs and storage challenges as primary barriers to scalability.
5. Gas 2025 β IEA Medium-Term Outlook
Key Takeaway: LNG supply waves will transform global gas markets by 2030, with demand growth concentrated in Asia. The report emphasizes flexibility needs and integration with renewables.
π‘ Need More Data? Visit our Technical Resources Library for CAD drawings, pressure vessel design guides, and case studies.
Contact us today for a free technical consultation and factory-direct quote.
π Factory Location:
Shijiazhuang Enric Gas Equipment Co., Ltd.
No. 169, Yuxiang Street, Equipment Manufacture Base
Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day