Designed for Corporate Purchasing Managers, Technical Directors and Operations Managers who demand reliable ROI, low total cost of ownership, and fast delivery.
Get Free Quote in 24 h1. Escalating Energy Bills – The MIT study shows natural‑gas‑based processes can waste up to 12 % of input energy when outdated compressors are used.
2. Unpredictable Lead‑Times – Average delivery from low‑cost suppliers stretches 8‑12 weeks, causing production bottlene‑backs and lost contracts.
3. Compliance Nightmares – New EU REACH and US ASME‑Section‑VIII updates require ISO 9001 and CE certifications; many generic Chinese units fail to meet these standards.
4. High Maintenance Costs – Traditional oil‑lubricated pumps suffer > 15 % annual downtime (source: Industrial Gases Market 2025‑2034).
5. Shipping & Tariff Pressure – Freight spikes of 30 %+ in 2024 (IEA Gas 2025) make low‑margin purchases untenable.
| Model | Flow Rate (m³/h) | Max Pressure (bar) | Power (kW) | Material | Efficiency % | Certifications |
|---|---|---|---|---|---|---|
| TP‑C100 | 0.5‑5 | 30 | 2‑8 | SS304 | 92 | CE, ISO 9001 |
| TP‑C250 | 5‑25 | 60 | 10‑30 | Hastelloy C‑276 | 94 | ASME, DOT, CE |
| TP‑C500 | 25‑100 | 120 | 35‑80 | Duplex 2205 | 96 | ISO 9001, CE, FCC |
| TP‑C1000 | 100‑250 | 250 | 80‑150 | Inconel 718 | 98 | ASME, CE, ISO 9001, RoHS |
Hydrogen Refueling Stations (HRS) – The Global Hydrogen Review 2025 cites a 30 % surge in HRS capacity. Our TP‑C500, with a 96 % isentropic efficiency, reduced station OPEX by 22 % for a German operator.
thermal-power-storage thermal-energy-storage thermal-storage thermal-energy-storage-efficiency
Natural‑Gas‑Based Power Plants – A 500 MW combined‑cycle plant in Texas replaced legacy compressors with TP‑C250 units, cutting fuel consumption by 0.8 MMBtu/h and extending maintenance intervals from 6 months to 18 months.
Industrial Gas Manufacturing (O₂, N₂, Ar) – In a Korean semiconductor fab, the TP‑C1000 delivered ultra‑clean, low‑vibration gas streams, helping achieve a 99.999 % purity target without additional filtration.
Off‑Grid Renewable Energy Storage – Our compressors paired with compressed‑air energy storage (CAES) in a Spanish pilot delivered a round‑trip efficiency of 71 %, surpassing the 65 % benchmark.
Standard models ship in 10 days. OEM designs with unique materials or impeller geometry require 4‑6 weeks after final CAD approval.
Yes. Every unit is accompanied by a full Certificate of Conformity (ISO 9001, CE, ASME, DOT) uploaded to our portal for your audit team.

We support L/C at sight, T/T (30 % + 70 % on delivery), and Open‑Account for vetted partners. Volume discounts are applied automatically in the quotation.
We offer FOB, CIF, or DDP. Our logistics team works with major carriers (Maersk, DHL) to minimize customs delays. For EU customers we can provide incoterm DDP with all VAT and duties pre‑paid.
Standard delivery includes a detailed installation manual and a remote commissioning session (via Teams/Zoom). On‑site commissioning can be arranged at US $2,500 per day for a qualified technician.
All units carry a 3‑year warranty covering material and workmanship. Our 24/7 hotline (+86‑311‑81663811) guarantees response within 2 hours for critical failures.
Absolutely. The TP‑C500 and TP‑C1000 families are rated for hydrogen‑compatible seals and can operate up to 250 bar with 0.1 % leakage – verified by the IEA‑Hydrogen 2025 report.
Only 15 units of the high‑efficiency TP‑C250 are left at the promotional price of US $4,800 (regular US $5,600).
Risk‑Free: We’ll ship a fully functional demo unit to your plant for free. If performance doesn’t meet the quoted 96 % efficiency, we’ll take it back – no charge.
Or call +86‑311‑81663811 now. Offer expires 31 Oct 2026.
Laura M., Procurement Manager – PetroChem USA
Mark T., Technical Director – Siemens Germany
Emily R., Operations Manager – Shell Netherlands
Europe Region – Bowen Di
Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236
Email: dibowen@enricgroup.com
North America – Jeremy Wu
Tel: 86‑153 0330 2613 | WhatsApp: +86 138 3101 9831
Email: wuzuoliang@enricgroup.com
General Inquiries: gasequipment@enricgroup.com | Phone: +86‑311‑81663811
Address: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, 051430 Hebei Province, China
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted by Global Leaders
Ready to order? →