For Purchasing Managers, Technical Directors & Operations Leaders who struggle with oversized, expensive, or non‑compliant LNG tanks, Enric’s modular, high‑pressure types of LNG tank deliver up to 25% lower lifecycle cost while meeting ASME, DOT, and CE standards.
In 2025‑2026 the global LNG market grew 7.3 % (IEA “Gas 2025” report) and the pressure on logistics, compliance, and ROI intensified. Yet many buyers still face the same three‑fold pain:
Consider a recent case: a U.S. petro‑chemical plant delayed its expansion by 8 weeks, incurring $1.2 million in lost production because its LNG tank supplier could not meet the high‑pressure 15 MPa requirement on time.
Enric’s product line covers five core LNG tank families, each optimized for a specific application and regulatory environment.
| Tank Type | Capacity (m³) | Design Pressure (MPa) | Insulation | Weight (kg/m³) | Lead‑Time | Key Certifications |
|---|---|---|---|---|---|---|
| DW‑VIT | 5‑250 | 15 | Vacuum + Perlite | 12 | 8‑12 weeks | ASME, CE, ISO 9001 |
| C‑FR | 20‑150 | 12 | Fiber‑wrap | 8 | 6‑9 weeks | DNV‑GL, ABS |
| LP‑MOD | 10‑500 | 5 | Foam‑core | 10 | 3‑5 days on‑site | EN‑13445, ISO 9001 |
| HSD‑OEM | 50‑300 | 15 | Vacuum + MLI | 11 | 6 weeks | API‑650, IEC‑61508 |
| P‑BUNKER | 2‑30 | 10 | Vacuum‑panel | 9 | 4‑6 weeks | ISO‑16703, CE |
Case 1 – Offshore Gas Processing (South America)
Enric supplied 120 m³ C‑FR tanks to a floating LNG (FLNG) unit, cutting structural steel weight by 38 % and enabling a 2‑month earlier berth. The project achieved US$4.5 M savings on vessel charter fees.
types-of-lng-storage-tank storage-tank-farms tig-gas-tank trunkline-lng
Case 2 – Remote Mining Site (Australia)
LP‑MOD tanks were erected in 48 hours, delivering 300 m³ of LNG for diesel‑replacement generators. Emissions dropped 22 % and fuel cost fell from AU$0.78 to AU$0.55 per litre.
Case 3 – European Green Port Initiative
P‑BUNKER units met the new EU “Zero‑Emission Port” standard (2025) and secured a 5‑year supply contract worth €3.2 million.
Request a customized LNG tank quotation now →
Export projects typically use double‑wall vacuum‑insulated (DW‑VIT) tanks for large volumes, composite‑fiber (C‑FR) for weight‑critical offshore platforms, and modular low‑pressure (LP‑MOD) tanks for on‑site storage at remote terminals.
Yes. Our engineering team conducts dual‑code design reviews, and every custom tank is stamped for both ASME‑VIII (U.S.) and CE‑EN 13445 (EU) before shipment.
Standard production is 8‑12 weeks; with our OEM/ODM fast‑track program it can be reduced to 6 weeks while keeping full certification.
We partner with global freight forwarders experienced in hazardous cargo. Tanks are shipped in ISO‑compatible containers, with insurance and customs clearance handled by our dedicated export team.

All tanks come with a 5‑year warranty, remote monitoring via SCADA, on‑site inspection visits twice per year, and a 24/7 technical hotline (Tel: +86‑311‑81663811).
Limited‑time offer: Free 1:1 engineering consultation + 10 % off the first order for contracts signed before 31 Oct 2026.
Email Quote Now WhatsApp 24 h Reply
Or fill the short form below – response guaranteed within 8 hours.
David K., Operations Manager, TotalEnergies (USA)
“The HSD‑OEM tank arrived 2 weeks early and integrated with our SCADA system without any firmware changes. ROI hit 15 % in the first year.”
Linda S., Procurement Lead, Siemens (Germany)
“Composite‑fiber tanks saved us 30 % on structural steel. The certification process was transparent and completed in 4 weeks.”
Ahmed R., Site Engineer, Saudi Aramco
“LP‑MOD tanks were erected in 48 hours, letting us start LNG‑fueled power generation two months ahead of schedule.”
Contact Our Global Offices
Europe Region – Bowen Di | Tel: +86 156 1436 8118 | WhatsApp: +86 181 3205 9236 | Email: dibowen@enricgroup.com
North America Region – Jeremy Wu | Tel: +86 153 0330 2613 | WhatsApp: +86 138 3101 9831 | Email: wuzuoliang@enricgroup.com
Headquarters: No. 169, Yuxiang Street, Equipment Manufacture Base, Shijiazhuang, Hebei, China | Tel: +86‑311‑81663811 | Email: gasequipment@enricgroup.com
Visit our Contact Us page for detailed shipping, payment, and compliance information.
-Hengkai Natural Gas Liquefaction Project
-Changming Phase II Natural Gas Liquefaction Project
-Hwange Natural Gas Liquefaction Project
-Tianhao Coalbed Methane Liquefaction Project
-Tianyun Coalbed Methane Liquefaction Project
-Shuntai Coalbed Methane Liquefaction Project
-60.000 cubic meters/day
-60.000 cubic meters/day
-60.000 m3/day*2 sets
-200.000 cubic meters/day
Trusted By Global Leaders
What Our Clients Say